LR-N04-0355, July 2004 Monthly Operating Report for Hope Creek Generating Station

From kanterella
Jump to navigation Jump to search
July 2004 Monthly Operating Report for Hope Creek Generating Station
ML042380374
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/12/2004
From: Hutton J
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N04-0355
Download: ML042380374 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 AUG 12 2004 LR-N04-0355 o PSEG NuclearLLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for July 2004 are being forwarded.

Sincerely, lope Creek Plant Manager Attachments C Distribution Iyg 95-2168 REV. 7199

DOCKET NO.:

UNIT:

' DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hope Creek 8/6/04 F. Todd (856) 339-1316 Reporting Period July 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 iil Il lill!___

1049 I I Month Year-to-date Cumulative 744 4563 133089 744 14425 130381 0

0 0

770189 4336829 132076101 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTIONI F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE

__REACTOR (2)

(1) Reason (2) Method I

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator TraininglLicense Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

z DOCKET NO.:

UNIT:

'DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hope Creek 8/6/04 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience

  • Hope Creek entered the month at approximately 100% reactor power.
  • On July 14, Hope Creek reduced power to approximately 66% after the UB" Service Water Pump was removed from service due to a packing leak.

Power was restored to 100% on July 16.

  • At the end of the month, Hope Creek completed 109 days of continuous on-line operation.