January 2006 Monthly Operating Report for Hope Creek Generating Station
ML060540431
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/15/2006
From: Massaro M
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N06-0084
Download: ML060540431 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hlancocks Bridge, New Jersey 08038-0236 o PSEG Nuclear LLC LR-N06-0084 FEB 1 5 2006 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for January 2006 are being forwarded.

Sincerely, Michael J. Massaro Hope Creek Plant Manager Attachments C Distribution 4

95-2168 REV. 7/99

q114 DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hope Creek 02/14/06 K. Hight (856) 339-3887 Reporting Period January 2006 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month 744 744 143289 744 744 1140203 0 3 to 803113 803113 1142276018 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURSI (1)

SHUTTING COMMENT S=SCHEDULED DOWN THE I_ IREACTOR (2)

I-I I I=

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 02/14/06 COMPLETED BY: F. Possessky TELEPHONE: (856) 339-1160 Summary Of Monthly Operating Experience

  • The unit entered the month at 100%.
  • On 01/14/06 at Power was reduced to 57% when a 13.8 kV system breaker opened.
  • On 01/15/06 the unit was returned to 100% Power.
  • At the end of the month, the unit remained at 100% and completed 149 days of continuous on-line operation.