LR-N05-0313, May 2005 Monthly Operating Report for Hope Creek Generating Station

From kanterella
Jump to navigation Jump to search
May 2005 Monthly Operating Report for Hope Creek Generating Station
ML051790229
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/15/2005
From: Massaro M
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N05-0313
Download: ML051790229 (3)


Text

-

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JUN 1 5 2005 o PSEG NuclearLLC LR-N05-031 3 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for May 2005 are being forwarded.

Sincerely, Michael J. Massaro Hope Creek Plant Manager Attachments C Distribution 95-2168 REV. 7199

I ..

asI DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 6/8/05 COMPLETED BY: K. Hight TELEPHONE: (856) 339-3887 Reporting Period May 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1083 _ _i l Maximum Dependable Capacity (MWe-Net) 1049 - ---

Month Year-to-date Cumulative No. of hours reactor was critical 744 2930 137717 No. of hours generator was on line (service 744 2662 134741 hours)

Unit reserve shutdown hours 0 2140 0 Net Electrical Energy (MWH) 813305 ]2716479 136504617 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTIONI F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

ID I_:I I .

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

DOCKET NO.: 50-354 UNIT: Hone Creek DATE: 6/8/05 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Hope Creek began the month at approximately 100% reactor power and operated there throughout the month.
  • At the end of the month, Hope Creek completed 51 days of continuous on-line operation.