LR-N02-0294, July 2002 Monthly Operating Report for Hope Creek
| ML022340508 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 08/14/2002 |
| From: | Garchow D Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N02-0294 | |
| Download: ML022340508 (3) | |
Text
PSEG Nuclear LLC P.O Box 236, Hancocks Bridge, New Jersey 08038-0236 AUG 1 4 2002 LR-N02-0294 0 PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for July 2002 are being forwarded.
Sincerely, D. F. Garc ow Vice President - Operations RAR Attachments C Distribution 95-2168 REV 7/99
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 08/10/02 F. Todd (856) 339-1316 Reporting Period July 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month Year-to-date Cumulative 744 5020 117442 744 4881 115146 0
0 0
781291 5003106 116638714 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 08/10/02 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
"* Hope Creek began the month at 100% power.
"* On July 14, power was reduced for planned turbine valve testing. Power was restored to 100% later that day. There were no other significant power reductions during July.
"* At the end of the month, Hope Creek competed 34 days of continuous on-line operation.