LR-N03-0060, January 2003 Monthly Operating Report for Hope Creek Generating Station

From kanterella
Jump to navigation Jump to search
January 2003 Monthly Operating Report for Hope Creek Generating Station
ML030560751
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/14/2003
From: Waldinger L
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N03-0060
Download: ML030560751 (3)


Text

PSEG Nuclear LLC P.O Box 236, Hancocks Brdge, New Jersey 08038-0236 FEB 1 4 2003 LR-N03-0060 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for January 2003 are being forwarded.

Sincerely, Lon Waldinger Operations Director RAR Attachments C Distribution

/

95-2168 REV 7/99

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hope Creek 2110/03 F. Todd (856) 339-1316 Reporting Period January 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month 744 744 Cumulative 121859 744 744 119563 0

0 0

791347 791347 121270038 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hope Creek 2/10/03 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience Hope Creek entered the month at 100% reactor power. On January 4, power was reduced for planned turbine valve testing and was returned to 100% power on January 5.

On January 25, power was reduced for planned turbine valve testing and troubleshooting on the "A" south waterbox. Power was returned to 100% power on January 26.

  • At the end of the month, Hope Creek completed 218 days of continuous on-line operation.