LR-N03-0060, January 2003 Monthly Operating Report for Hope Creek Generating Station
ML030560751 | |
Person / Time | |
---|---|
Site: | Hope Creek |
Issue date: | 02/14/2003 |
From: | Waldinger L Public Service Enterprise Group |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
LR-N03-0060 | |
Download: ML030560751 (3) | |
Similar Documents at Hope Creek | |
---|---|
Category:Letter type:LR
MONTHYEARLR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024
[Table view]Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0075, 2022 Annual 10 CFR 50.46 Report2022-09-30030 September 2022 2022 Annual 10 CFR 50.46 Report LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0019, Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges2022-02-24024 February 2022 Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0011, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink2022-02-0101 February 2022 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink LR-N22-0005, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-01-0707 January 2022 Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs 2024-09-30 Category:License-Monthly Operating Report MONTHYEARLR-N06-0084, January 2006 Monthly Operating Report for Hope Creek Generating Station2006-02-15015 February 2006
[Table view]January 2006 Monthly Operating Report for Hope Creek Generating Station LR-N06-0009, December 2005 Monthly Operating Report for Hope Creek Generating Station2006-01-12012 January 2006 December 2005 Monthly Operating Report for Hope Creek Generating Station LR-N05-0551, October 2005 Monthly Operating Report for Hope Creek Generating Station2005-11-15015 November 2005 October 2005 Monthly Operating Report for Hope Creek Generating Station LR-N05-0522, September 2005 Monthly Operating Report for Hope Creek Generating Station2005-10-14014 October 2005 September 2005 Monthly Operating Report for Hope Creek Generating Station LR-N05-0450, August 2005 Monthly Operating Report for Hope Creek Generating Station2005-09-12012 September 2005 August 2005 Monthly Operating Report for Hope Creek Generating Station LR-N05-0415, July 2005 Monthly Operating Report for Hope Creek Generating Station2005-08-15015 August 2005 July 2005 Monthly Operating Report for Hope Creek Generating Station LR-N05-0353, June 2005 Monthly Operating Report for Hope Creek Generating Station2005-07-13013 July 2005 June 2005 Monthly Operating Report for Hope Creek Generating Station LR-N05-0313, May 2005 Monthly Operating Report for Hope Creek Generating Station2005-06-15015 June 2005 May 2005 Monthly Operating Report for Hope Creek Generating Station LR-N05-0262, April 2005 Monthly Operating Report for Hope Creek Generating Station2005-05-13013 May 2005 April 2005 Monthly Operating Report for Hope Creek Generating Station LR-N05-0207, March 2005 Monthly Operating Report for Hope Creek Generating Station2005-04-14014 April 2005 March 2005 Monthly Operating Report for Hope Creek Generating Station ML0508104192005-03-14014 March 2005 February 2005 Monthly Operating Report for Hope Creek Generating Station LR-N05-0090, January 2005 Monthly Operating Report for Hope Creek Generating Station2005-02-14014 February 2005 January 2005 Monthly Operating Report for Hope Creek Generating Station LR-N05-0010, December 2004 Monthly Operating Report for Hope Creek Generating Station2005-01-13013 January 2005 December 2004 Monthly Operating Report for Hope Creek Generating Station LR-N04-0571, November 2004 Monthly Operating Report for Hope Creek2004-12-14014 December 2004 November 2004 Monthly Operating Report for Hope Creek LR-N04-0504, October 2004 Monthly Operating Report for Hope Creek Generating Station2004-11-15015 November 2004 October 2004 Monthly Operating Report for Hope Creek Generating Station LR-N04-0446, September 2004 Monthly Operating Report for Hope Creek Generating Station2004-10-15015 October 2004 September 2004 Monthly Operating Report for Hope Creek Generating Station LR-N04-0404, August 2004 Monthly Operating Report for Hope Creek Generating Station2004-09-13013 September 2004 August 2004 Monthly Operating Report for Hope Creek Generating Station LR-N04-0355, July 2004 Monthly Operating Report for Hope Creek Generating Station2004-08-12012 August 2004 July 2004 Monthly Operating Report for Hope Creek Generating Station LR-N04-0301, June 2004 Monthly Operating Report for Hope Creek Generating Station2004-07-12012 July 2004 June 2004 Monthly Operating Report for Hope Creek Generating Station LR-N04-0255, May 2004 Monthly Operating Report for Hope Creek Generating Station2004-06-14014 June 2004 May 2004 Monthly Operating Report for Hope Creek Generating Station LR-N04-0211, April 2004 Monthly Operation Report for Hope Creek Generating Station2004-05-0707 May 2004 April 2004 Monthly Operation Report for Hope Creek Generating Station LR-N04-0169, March 2004 Monthly Operating Report for Hope Creek Generating Station2004-04-15015 April 2004 March 2004 Monthly Operating Report for Hope Creek Generating Station LR-N04-0109, February 2004 Monthly Operating Report for Hope Creek Generating Station2004-03-10010 March 2004 February 2004 Monthly Operating Report for Hope Creek Generating Station LR-N04-0059, January 2004 Monthly Operating Report for Hope Creek Generating Station2004-02-17017 February 2004 January 2004 Monthly Operating Report for Hope Creek Generating Station LR-N04-0011, December 2003 Monthly Operating Report for Hope Creek Generating Station2004-01-13013 January 2004 December 2003 Monthly Operating Report for Hope Creek Generating Station LR-N03-0517, November 2003 Monthly Operating Report for Hope Creek Generating Station2003-12-15015 December 2003 November 2003 Monthly Operating Report for Hope Creek Generating Station LR-N03-0468, October 2003 Monthly Operating Report for Hope Creek Generating Station2003-11-17017 November 2003 October 2003 Monthly Operating Report for Hope Creek Generating Station LR-N03-0434, September 2003 Monthly Operating Report for Hope Creek Generating Station2003-10-13013 October 2003 September 2003 Monthly Operating Report for Hope Creek Generating Station LR-N03-0392, August 2003 Monthly Operating Report for Hope Creek2003-09-12012 September 2003 August 2003 Monthly Operating Report for Hope Creek LR-N03-0357, July 2003 Monthly Operating Report for Hope Creek2003-08-12012 August 2003 July 2003 Monthly Operating Report for Hope Creek LR-N03-0308, June 2003 Monthly Operating Report for Hope Creek Generating Station2003-07-11011 July 2003 June 2003 Monthly Operating Report for Hope Creek Generating Station LR-N03-0257, May 2003 Monthly Operating Report for Hope Creek2003-06-11011 June 2003 May 2003 Monthly Operating Report for Hope Creek LR-N03-0225, April 2003 Monthly Operating Report for Hope Creek Generating Station2003-05-14014 May 2003 April 2003 Monthly Operating Report for Hope Creek Generating Station LR-N03-0161, March 2003 Monthly Operating Report for Hope Creek Generating Station2003-04-14014 April 2003 March 2003 Monthly Operating Report for Hope Creek Generating Station LR-N03-0117, February 2003 Monthly Operating Report for Hope Creek Generating Station2003-03-11011 March 2003 February 2003 Monthly Operating Report for Hope Creek Generating Station LR-N03-0060, January 2003 Monthly Operating Report for Hope Creek Generating Station2003-02-14014 February 2003 January 2003 Monthly Operating Report for Hope Creek Generating Station LR-N03-0006, December 2002 Monthly Operating Report for Hope Creek2003-01-14014 January 2003 December 2002 Monthly Operating Report for Hope Creek LR-N02-0418, November 2002 Monthly Operating Report for Hope Creek2002-12-13013 December 2002 November 2002 Monthly Operating Report for Hope Creek LR-N02-0396, October 2002 Monthly Operating Report for Hope Creek Generating Station2002-11-13013 November 2002 October 2002 Monthly Operating Report for Hope Creek Generating Station LR-N02-0355, September 2002 Monthly Operating Report for Hope Creek2002-10-14014 October 2002 September 2002 Monthly Operating Report for Hope Creek LR-N02-0326, August 2002 Monthly Operating Report for Hope Creek2002-09-16016 September 2002 August 2002 Monthly Operating Report for Hope Creek LR-N02-0294, July 2002 Monthly Operating Report for Hope Creek2002-08-14014 August 2002 July 2002 Monthly Operating Report for Hope Creek LR-N02-0250, June 2002 Monthly Operating Report for Hope Creek Generating Station2002-07-15015 July 2002 June 2002 Monthly Operating Report for Hope Creek Generating Station LR-N02-0210, May 2002 Monthly Operating Report for Hope Creek2002-06-12012 June 2002 May 2002 Monthly Operating Report for Hope Creek LR-N02-0187, April 2002 Monthly Operating Report for Hope Creek2002-05-15015 May 2002 April 2002 Monthly Operating Report for Hope Creek LR-N02-0158, March 2002 Monthly Operating Report for Hope Creek2002-04-12012 April 2002 March 2002 Monthly Operating Report for Hope Creek LR-N02-0091, February 2002 Monthly Operating Report for Hope Creek, Unit 12002-03-14014 March 2002 February 2002 Monthly Operating Report for Hope Creek, Unit 1 LR-N02-0050, January 2002 Monthly Operating Report for Hope Creek Generating Station, Unit 12002-02-13013 February 2002 January 2002 Monthly Operating Report for Hope Creek Generating Station, Unit 1 ML0204504372002-01-15015 January 2002 December 2001 Monthly Operating Report for Hope Creek Generating Station, Unit 1 2006-02-15 |
Text
PSEG Nuclear LLC P.O Box 236, Hancocks Brdge, New Jersey 08038-0236 FEB 1 4 2003 LR-N03-0060 o PSEG NuclearLLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for January 2003 are being forwarded.
Sincerely, Lon Waldinger Operations Director RAR Attachments C Distribution
/
95-2168 REV 7/99
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 2110/03 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period January 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1083 Maximum Dependable Capacity (MWe-Net) 1049 Month Cumulative No. of hours reactor was critical 744 744 121859 No. of hours generator was on line (service 744 744 119563 hours)
Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 791347 791347 121270038 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 2/10/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience Hope Creek entered the month at 100% reactor power. On January 4, power was reduced for planned turbine valve testing and was returned to 100% power on January 5.
On January 25, power was reduced for planned turbine valve testing and troubleshooting on the "A" south waterbox. Power was returned to 100% power on January 26.
- At the end of the month, Hope Creek completed 218 days of continuous on-line operation.