October 2004 Monthly Operating Report for Hope Creek Generating Station
ML043280612
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/15/2004
From: Hutton J
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N04-0504
Download: ML043280612 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 1 5 2004 LR-N04-0504 o PSEG ATuclearLLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for October 2004 are being forwarded.

Sincerely, s A. Hutton Creek Plant Manager Attachments C Distribution 95-2168 REV. 7/99

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hone Creek 11/4/04 F. Todd (856) 339-1316 Reporting Period October 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1083ARA_.t 1049 A...... S ;

Month Year-to-date Cumulative 234 6261 134787 234 6123 132079 0

0 0

248147 6048866 133788138 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 10/10/04 F

511 Hrs.

A 2

Moisture Separator Dump Line Break 10/31/04 Transitioned into Refuel

=_

Outage 12 (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 11/4/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Hope Creek entered the month at approximately 100% reactor power.
  • On October 10, the unit was manually scrammed due to a break in a Moisture Separator Dump line. While shutdown, Hope Creek transitioned into the scheduled refueling outage. The outage continued through the end of the month.