LR-N04-0504, October 2004 Monthly Operating Report for Hope Creek Generating Station

From kanterella
Jump to navigation Jump to search
October 2004 Monthly Operating Report for Hope Creek Generating Station
ML043280612
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/15/2004
From: Hutton J
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N04-0504
Download: ML043280612 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 1 5 2004 o PSEG ATuclearLLC LR-N04-0504 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for October 2004 are being forwarded.

Sincerely, s A. Hutton Creek Plant Manager Attachments C Distribution 95-2168 REV. 7/99

DOCKET NO.: 50-354 UNIT: Hone Creek DATE: 11/4/04 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period October 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1083ARA_.t Maximum Dependable Capacity (MWe-Net) 1049 A ...... S ;

Month Year-to-date Cumulative No. of hours reactor was critical 234 6261 134787 No. of hours generator was on line (service 234 6123 132079 hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 248147 6048866 133788138 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 10/10/04 F 511 Hrs. A 2 Moisture Separator Dump Line Break 10/31/04 Transitioned into Refuel

=_ Outage 12 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 11/4/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Hope Creek entered the month at approximately 100% reactor power.
  • On October 10, the unit was manually scrammed due to a break in a Moisture Separator Dump line. While shutdown, Hope Creek transitioned into the scheduled refueling outage. The outage continued through the end of the month.