LR-N04-0504, October 2004 Monthly Operating Report for Hope Creek Generating Station
| ML043280612 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 11/15/2004 |
| From: | Hutton J Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N04-0504 | |
| Download: ML043280612 (3) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 1 5 2004 LR-N04-0504 o PSEG ATuclearLLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for October 2004 are being forwarded.
Sincerely, s A. Hutton Creek Plant Manager Attachments C Distribution 95-2168 REV. 7/99
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hone Creek 11/4/04 F. Todd (856) 339-1316 Reporting Period October 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083ARA_.t 1049 A...... S ;
Month Year-to-date Cumulative 234 6261 134787 234 6123 132079 0
0 0
248147 6048866 133788138 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 10/10/04 F
511 Hrs.
A 2
Moisture Separator Dump Line Break 10/31/04 Transitioned into Refuel
=_
Outage 12 (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 11/4/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
- Hope Creek entered the month at approximately 100% reactor power.
- On October 10, the unit was manually scrammed due to a break in a Moisture Separator Dump line. While shutdown, Hope Creek transitioned into the scheduled refueling outage. The outage continued through the end of the month.