PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JAN 1 5 2002 LRN-02-0019 0 PSEG Nuclea LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION UNIT I DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for December 2001 are being forwarded.
- Operations RAR Attachments C Distribution 95-2168 REV. 7/99
INDEX NUMBER SECTION OF PAGES Operating Data Report...............................................................................
Monthly Operating Summary......................................................................
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 01/11/02 F. Todd (856) 339-1316 Reporting Period December 2001 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month Year-to-aate yumuiative 661 7975 112422 633 7859 110264 0
0 0
623007 8065273 111635608 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 12/6101 F
111 A
I MS Safety valve repair to 12111101 1
1 I
II I
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 01/11/02 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience Hope Creek began the month at 100% power.
On December 5, the unit was taken off line for maintenance on the Main Steam Safety Relief Valve. The unit was returned to service on December 11.
On December 13, power was reduced from 85% to approximately 62% for Turbine Control Valve Testing. Power ascension to 100% power was completed on December 14.
On December 17, power was reduced to approximately 66% to perform Turbine Control Valve Testing and was returned to 100% power on December 18.
On December 29, power was reduced to approximately 84% for Turbine Control Valve Testing. The unit returned to 100% power on December 30 and remained there for the remainder of the month.
- At the end of the month, the plant completed 20 days of continuous operation.