January 2005 Monthly Operating Report for Hope Creek Generating Station
ML050550079
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/14/2005
From: Massaro M
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N05-0090
Download: ML050550079 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 I.,

FEB 1 4 2005 LR-N05-0090 O PSEG AluclearLLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for January 2005 are being forwarded.

Sincerely,

-- Michael J. Massaro Hope Creek Plant Manager

/

Attachments C Distribution BEEPatk 95-2168 REV. 7/99

  • 2r, 0 Ii-1 DOCKET NO.:

UNIT:

- DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hope Creek 2/4/05 F. Todd (856) 339-1316 Reporting Period January 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month Year-to-date Cumulative 332 332 135119 124 124 132203 260 0

130 12 124699 24699 1133812837_I UNIT SHUTDOWNS NO.

DATE TYPE l DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 1 1/01/05 S

604 Hrs.

C 4

Refuel Outage 12 1/26/05 2

1/26/05 S

1 Hr.

B 1

Turbine Overspeed Test 3

1/29/05 F

15 Hrs.

B 1

Steam Leak on Main Steam Drain Line 1/30/05 Reactor Remained Critical (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.: 50-354 UNIT: Hope Creek

- DATE: 2/4/05 COMPLETED BY: R. Ritzman TELEPHONE:

(856) 339-1445 Summary Of Monthly Operating Experience

  • Hope Creek entered the month in a scheduled refueling outage.
  • On January 18, the reactor was taken oritical, and the unit was placed online on January 26. Later that day, the unit was taken offline for turbine overspeed testing and returned back to service.
  • On January 29, power was reduced frorm 44% to approximately 16%

power and the unit was taken offline to repair a steam leak on the Main Steam Drain Line. The unit was returned to service on January 30.

Power ascension was in progress at th3 end of the month.

  • At the end of the month, Hope Creek completed 1 day of continuous on-line operation.