LR-N03-0006, December 2002 Monthly Operating Report for Hope Creek

From kanterella
Jump to navigation Jump to search
December 2002 Monthly Operating Report for Hope Creek
ML030230357
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/14/2003
From: Waldinger L
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N03-0006
Download: ML030230357 (3)


Text

PSEG Nuclear LLC P 0 Box 236, Hancocks Bridge, New Jersey 08038-0236 0 PPSEG Nuclear LLC JAN 1 4 2003 LR-N03-0006 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for December 2002 are being forwarded.

Sincerely, Lon H. Waldinger Director - Operations RAR Attachments C Distribution 95-2168 REV 7/99

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hope Creek 1/8/03 F. Todd (856) 339-1316 Reporting Period December 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month 744 8693 121115 744 8554 118819 0

0 t0 804666 8843083 120478691 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 -Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

I _______________________________________

J ____________________________

.5. ______________________

5

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 1/8/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience Hope Creek entered the month at 100% reactor power. On December 1, power was reduced for turbine valve testing and was returned to 100% power later that day.

  • At the end of the month, Hope Creek completed 187 days of continuous on-line operation.