PSEG Nuclear LLC

-- P 0 Box 236, Hancocks Bridge, New Jersey 08038-0236 0 PPSEG NuclearLLC JAN 1 4 2003 LR-N03-0006 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for December 2002 are being forwarded.

Sincerely, Lon H. Waldinger Director - Operations RAR Attachments C Distribution 95-2168 REV 7/99

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 1/8/03 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period December 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1083 Maximum Dependable Capacity (MWe-Net) 1049 Month No. of hours reactor was critical 744 8693 121115 No. of hours generator was on line (service 744 8554 118819 hours)

Unit reserve shutdown hours 0 0 t0 Net Electrical Energy (MWH) 804666 8843083 120478691 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

I _______________________________________

_____________________________________ J .5. 5 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 1/8/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience Hope Creek entered the month at 100% reactor power. On December 1, power was reduced for turbine valve testing and was returned to 100% power later that day.

  • At the end of the month, Hope Creek completed 187 days of continuous on-line operation.