LR-N05-0010, December 2004 Monthly Operating Report for Hope Creek Generating Station

From kanterella
Jump to navigation Jump to search
December 2004 Monthly Operating Report for Hope Creek Generating Station
ML050270181
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/13/2005
From: Hutton J
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N05-0010
Download: ML050270181 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JAN 13 2005 LR-N05-001 0 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for December 2004 are being forwarded.

Sincerely, ames.

utton

/Hope Creek Plant Manager Attachments C Distribution 95-2168 REV. 7/99

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hone Creek 1/7/05 F. Todd (856) 339-1316 Reporting Period December 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1083

=

1049

__ A d z Adr><0 _

Month Year-to-date Cumulative 0

6261 134787 0

6123 132079 0

0 0

0 6048866 133788138 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 12/1/04 S

744 Hrs.

C 4

Refuel Outage 12 12/31/04 (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 1/7/05 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience Hope Creek entered the month in a scheduled refueling outage. The outage continued through the end of the month.