PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 APR 1 2 2002 LR-N02-0156 0 PSEG Nu clear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for March 2002 are being forwarded.
Sincerely, D. F.Presow Vice President - Operations RAR Attachments C Distribution 95-2168 REV. 7/99
INDEX NUMBER SECTION OF PAGES Operating Data Report...............................................................................
1 Monthly Operating Summary.....................................................................
1
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 04/12/02 F. Todd (856) 339-1316 Reporting Period March 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month Year-to-date Cumulative 744 2160 114582 744 2160 112424 0
0 0
728675 2252309 113887917 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F -Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 04/12/02 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience
" Hope Creek began the month at 100% power.
" On March 16, there was a planned power reduction to 60% to perform flux suppression testing to identify the location of failed fuel rod. Power remained at a reduced level until after rod pattern adjustments were performed on March 24.
Power was returned to 100% on March 25.
" On March 27, there was a planned power reduction to approximately 80% for additional rod pattern adjustments, which were the result of the flux suppression testing. Power was returned to 100% on March 28.
At the end of the month, the plant completed 110 days of continuous operation.