Letter Sequence Other |
---|
EPID:L-2018-RNW-0002, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement
Results
Other: L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses, L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses, L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items, L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation, L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses, ML17360A054, ML18037A824, ML18037A828, ML18074A252, ML18086A705, ML18087A433, ML18183A445, ML18230B482, ML18232A576, ML18299A114, ML18299A116, ML18341A024, ML19032A536, ML19050A400, ML19162A072, ML19162A097, ML19162A117, ML19162A343, ML22073A122
|
MONTHYEARML19326C1141972-07-19019 July 1972 SLR Tech Specs from Authority File Project stage: Acceptance Review L-2018-004, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)2018-01-30030 January 2018 Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) Project stage: Request ML18037A8122018-01-30030 January 2018, 31 January 2018 Submittal of Subsequent License Renewal Application Project stage: Request ML18037A8292018-01-30030 January 2018 Enclosure 2 - Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 Project stage: Request ML18037A8282018-01-30030 January 2018 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary Project stage: Other ML18037A8242018-01-30030 January 2018 Submittal of Subsequent License Renewal Application Project stage: Other ML18113A1322018-01-31031 January 2018, 10 April 2018, 30 April 2018 Transmittal of Subsequent License Renewal Application Revision 1 Project stage: Request L-2018-039, License Renewal Application - Supplement 12018-02-0909 February 2018 License Renewal Application - Supplement 1 Project stage: Supplement ML18053A1372018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Supplement L-2018-053, Replacement Pages to Enclosure 3, SLRA Section 42018-02-16016 February 2018 Replacement Pages to Enclosure 3, SLRA Section 4 Project stage: Request ML18053A1232018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Request ML18038A6912018-04-0303 April 2018 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18113A1422018-04-10010 April 2018 Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) Project stage: Request ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application Project stage: Other ML18087A4332018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Other ML18087A4742018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Request ML17360A0542018-04-25025 April 2018 Subsequent License Renewal Application Online Reference Portal Project stage: Other ML18086A7052018-04-26026 April 2018 Plan for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18173A0872018-07-0505 July 2018 Plan for the Irradiated Concrete Technical Issue Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Acceptance Review ML18183A4452018-07-23023 July 2018 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18218A2002018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18218A1982018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 Project stage: Request ML18218A1992018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - E-mail Project stage: RAI ML18232A5462018-08-20020 August 2018 Safety RAIs - Set 2 - Draft Project stage: Draft RAI ML18232A5142018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 Project stage: RAI ML18232A5122018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 Project stage: Request ML18232A5132018-08-20020 August 2018 SLRA Safety RAIs - Set 2 - RAIs Project stage: RAI ML18232A5762018-08-21021 August 2018 Plan for On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses2018-09-14014 September 2018 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses Project stage: Other ML18260A2432018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 5 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18260A2412018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application Set 5 Project stage: Request ML18260A2422018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 5 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI ML18259A0002018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 2 Project stage: RAI ML18243A0072018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 3 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI ML18243A0052018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application Set 3 Project stage: Request ML18243A0062018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 1 Project stage: RAI ML18262A0782018-09-26026 September 2018 09/10/2018 Summary of Meeting with FPL to Discuss the Potential Subsequent License Renewal Wear Issues of CRDM Thermal Sleeve Flanges at Turkey Point Based on Recent Operating Experience Project stage: Meeting ML18269A2102018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID L-2018-RNW-0002) - Enclosure Project stage: RAI ML18269A2082018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application Set 4 Project stage: Request ML18269A2092018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI ML18269A2282018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18269A2272018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation2018-10-0505 October 2018 Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation Project stage: Other ML18299A1172018-10-12012 October 2018 Framatome Calculation No. 32-9280712, Rev. 002, Tp CRDM Lower Joint Environmentally Assisted Fatigue Dated October 12, 2018 (Non-Proprietary) Project stage: Request ML18230B4822018-10-15015 October 2018 Report for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal Project stage: Other ML18296A0242018-10-16016 October 2018 Set 3 Response to Request for Additional Information to Subsequent License Renewal Application Safety Review Project stage: Response to RAI L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses2018-10-17017 October 2018 Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses Project stage: Other L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items2018-10-17017 October 2018 Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items Project stage: Other ML18299A1142018-10-24024 October 2018 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 4 Responses Project stage: Other 2018-04-10
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 42023-02-17017 February 2023 Radiological Emergency Plan Revision 73 and Revision 7 4 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-182, Emergency Response Data System (Eros) Changes2022-11-17017 November 2022 Emergency Response Data System (Eros) Changes L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-171, 10 CFR 50.59(d)(2) Summary Report2022-10-20020 October 2022 10 CFR 50.59(d)(2) Summary Report L-2022-167, Submittal of Periodic Reports2022-10-13013 October 2022 Submittal of Periodic Reports L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication2022-09-16016 September 2022 Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 2024-01-25
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. ML23095A0072023-04-0404 April 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1431 Revision 5 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)2022-08-26026 August 2022 License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) ML22243A1622022-08-26026 August 2022 Submittal of License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML21265A3722021-09-23023 September 2021 Improved Technical Specifications Conversion, Volume 1, Revision 0, Application of Selection Criteria to the Turkey Point Nuclear Generating Station Unit 3 and Unit 4 Technical Specifications L-2021-158, Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) Submittal2021-09-22022 September 2021 Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) Submittal ML21265A3772021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 6, Revision 0, Section 3.1, Reactivity Control Systems ML21265A3852021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 14, Revision 0, Section 3.9, Refueling Operations ML21265A3812021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.5, Emergency Core Cooling Systems (ECCS) ML21265A3872021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 16, Revision 0, Section 5.0, Administrative Controls ML21265A3792021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 8, Revision 0, Section 3.3, Instrumentation ML21265A3802021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.4, Reactor Coolant Systems (RCS) ML21265A3842021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 13, Revision 0, Section 3.8, Electrical Power Systems ML21265A3862021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 15, Revision 0, Section 4.0, Design Features ML21265A3782021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 7, Revision 0, Section 3.2, Power Distribution Limits ML21265A3832021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 12, Revision 0, Section 3.7, Plant Systems ML21265A3752021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 4, Revision 0, Chapter 2.0, Safety Limits (Sls) ML21265A3762021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 5, Revision 0, Section 3.0, LCO and SR Applicability ML21265A3732021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 2, Revision 0, Determination of No Significant Hazards Considerations Generic Changes ML21265A3822021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 11, Revision 0, Section 3.6, Containment Systems ML21265A3742021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 3, Revision 0, Chapter 1.0, Use and Application L-2021-071, License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum Tm LOCA Methodology2021-04-15015 April 2021 License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum Tm LOCA Methodology L-2020-157, Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2020-11-0505 November 2020 Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors L-2020-053, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program2020-04-0404 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program L-2020-003, License Amendment Request 268, Request to Extend Containment Leakage Rate Test Frequency2020-01-27027 January 2020 License Amendment Request 268, Request to Extend Containment Leakage Rate Test Frequency L-2019-203, License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2019-12-0606 December 2019 License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. L-2019-192, License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements2019-11-0404 November 2019 License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements L-2019-005, License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications2019-02-14014 February 2019 License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications L-2018-219, Supplement to License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals2018-12-0303 December 2018 Supplement to License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals L-2018-203, Supplement to License Amendment Request 257, Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement2018-11-20020 November 2018 Supplement to License Amendment Request 257, Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses2018-10-17017 October 2018 Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses L-2018-170, License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals2018-10-17017 October 2018 License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items2018-10-17017 October 2018 Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items L-2018-177, Subsequent License Renewal Application Safety Review Requests for Confirmation of Information (Rci) Responses2018-10-0909 October 2018 Subsequent License Renewal Application Safety Review Requests for Confirmation of Information (Rci) Responses L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation2018-10-0505 October 2018 Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation ML18130A4662018-06-12012 June 2018 Amendments Regarding Technical Specifications Pertaining to IST Program and ISI Program Requirements and Surveillance Frequency Control Program Applicability L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-044, License Amendment Request 257, Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement2018-05-14014 May 2018 License Amendment Request 257, Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement L-2018-065, License Amendment Request 258, Revise Reactor Core Safety Limit to Reflect WCAP-17642-PA, Revision 12018-05-0303 May 2018 License Amendment Request 258, Revise Reactor Core Safety Limit to Reflect WCAP-17642-PA, Revision 1 L-2018-082, Turkey Point, Units 3 and 4 - Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version)2018-04-10010 April 2018 Turkey Point, Units 3 and 4 - Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) L-2018-082, Enclosure 4 to L-2018-082 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Documents (Public Version)2018-04-10010 April 2018 Enclosure 4 to L-2018-082 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Documents (Public Version) ML18113A1422018-04-10010 April 2018 Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) ML18113A1412018-04-10010 April 2018 Enclosure 1 to L-2018-082, Subsequent License Renewal Application, Enclosure Summary ML18113A1342018-04-10010 April 2018 Transmittal of Subsequent License Renewal Application Revision 1 L-2018-086, Subsequent License Renewal Application Appendix E Environmental Report Supplemental Information2018-04-10010 April 2018 Subsequent License Renewal Application Appendix E Environmental Report Supplemental Information 2023-06-28
[Table view] Category:Report
MONTHYEARML23333A0172023-11-27027 November 2023 Attachment I - Chin - the Cooling Canal System at the FPL-Turkey-Point Power Station ML23333A0142023-11-27027 November 2023 Attachment F - Groundwater Tek Inc - Peer Review Study Final-1 ML24012A0422023-11-16016 November 2023 FAQ 23-03 Turkey Point IE01 Proposed NRC Response ML23265A5512023-09-22022 September 2023 Enclosure 3: WCAP-18830-NP, Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)2022-08-26026 August 2022 License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-038, Emergency Response Data System (Eros) Changes2022-05-17017 May 2022 Emergency Response Data System (Eros) Changes L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-05-0303 May 2022 Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-022, Updated Conditions of Certification Report2022-02-14014 February 2022 Updated Conditions of Certification Report L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions2021-09-16016 September 2021 Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)2021-06-24024 June 2021 Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds) IR 05000250/20200112020-07-23023 July 2020 NRC Inspection Report 05000250-2020011 and 05000251-2020011 and Investigation Report 2-2019-011; and Apparent Violation Final L-2020-073, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping2020-04-13013 April 2020 Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping ML20098F3412020-04-0707 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification2019-11-25025 November 2019 Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2019-08-0606 August 2019 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds L-2019-054, Baffle-Former Bolts Predictive Evaluations2019-03-13013 March 2019 Baffle-Former Bolts Predictive Evaluations ML19072A1622019-03-0505 March 2019 National Park Service, Southeast Regional Office, Comments Dated March 5, 2019, on Turkey Point Nuclear Generating Units 3 and 4 Preliminary Draft SEIS Regarding Subsequent License Renewal ML18353A8352018-12-31031 December 2018 Biological Assessment for the Turkey Point Units 3 and 4 Proposed Subsequent License Renewal ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines2018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines ML18299A1182018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018 L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation2018-10-0505 October 2018 Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review2018-10-0505 October 2018 Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review L-2018-173, Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program2018-09-21021 September 2018 Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program ML18254A3412018-09-11011 September 2018 Fish and Wildlife Service'S List of Migratory Birds Near Turkey Point ML18227B5212018-08-15015 August 2018 Submit Attachment a, Annual Hourly Percent Frequency of Vertical and Horizontal Stability Categories by Wind Direction and Wind Speed ML18227A2902018-08-15015 August 2018 Submit Report Contains Official Summary of Startup Physics Tests, Unit 4 Cycle Iii. the Tests Were Conducted in Accordance with Operating Procedure 0204.5, Startup Sequence After Refueling L-2018-098, Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.462018-04-18018 April 2018 Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.46 L-2018-054, Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/172018-02-16016 February 2018 Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/17 L-2017-148, Special Report - Accident Monitoring Instrumentation2017-08-11011 August 2017 Special Report - Accident Monitoring Instrumentation L-2017-123, Special Report - Standby Steam Generator Feedwater Pumps Inoperable2017-06-29029 June 2017 Special Report - Standby Steam Generator Feedwater Pumps Inoperable L-2017-124, Flooding Focused Evaluation Summary2017-06-29029 June 2017 Flooding Focused Evaluation Summary L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 20162017-04-17017 April 2017 Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 L-2016-226, NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information2016-12-20020 December 2016 NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information L-2016-058, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis2016-03-23023 March 2016 Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis ML16013A4722016-01-22022 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task L-2015-313, Special Report - Accident Monitoring Instrumentation2015-12-18018 December 2015 Special Report - Accident Monitoring Instrumentation L-2015-137, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2015-04-22022 April 2015 Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments ML15054A0372015-02-23023 February 2015 U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Fire PRA Facts and Observations for Turkey Point Nuclear Generating Stations, Units 3 and 4 ML14338A5542014-12-0404 December 2014 NRC-2013- TN2986-NRC 2014 St. Lucie ML14338A5552014-12-0404 December 2014 NRC-2013-TN3079-NRC 2014 St. Lucie License Renewal L-2014-233, Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I)2014-07-22022 July 2014 Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I) L-2014-085, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2014-03-27027 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident 2023-09-22
[Table view] Category:Technical
MONTHYEARML23333A0142023-11-27027 November 2023 Attachment F - Groundwater Tek Inc - Peer Review Study Final-1 ML23333A0172023-11-27027 November 2023 Attachment I - Chin - the Cooling Canal System at the FPL-Turkey-Point Power Station ML23265A5512023-09-22022 September 2023 Enclosure 3: WCAP-18830-NP, Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)2022-08-26026 August 2022 License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-05-0303 May 2022 Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-022, Updated Conditions of Certification Report2022-02-14014 February 2022 Updated Conditions of Certification Report L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)2021-06-24024 June 2021 Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds) L-2020-073, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping2020-04-13013 April 2020 Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping ML20098F3412020-04-0707 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds L-2019-054, Baffle-Former Bolts Predictive Evaluations2019-03-13013 March 2019 Baffle-Former Bolts Predictive Evaluations ML19072A1622019-03-0505 March 2019 National Park Service, Southeast Regional Office, Comments Dated March 5, 2019, on Turkey Point Nuclear Generating Units 3 and 4 Preliminary Draft SEIS Regarding Subsequent License Renewal ML18353A8352018-12-31031 December 2018 Biological Assessment for the Turkey Point Units 3 and 4 Proposed Subsequent License Renewal ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines2018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines ML18299A1182018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018 L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review2018-10-0505 October 2018 Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation2018-10-0505 October 2018 Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation ML18227B5212018-08-15015 August 2018 Submit Attachment a, Annual Hourly Percent Frequency of Vertical and Horizontal Stability Categories by Wind Direction and Wind Speed ML18227A2902018-08-15015 August 2018 Submit Report Contains Official Summary of Startup Physics Tests, Unit 4 Cycle Iii. the Tests Were Conducted in Accordance with Operating Procedure 0204.5, Startup Sequence After Refueling L-2018-098, Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.462018-04-18018 April 2018 Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.46 L-2018-054, Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/172018-02-16016 February 2018 Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/17 L-2014-085, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2014-03-27027 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML14002A1602014-02-0606 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14029A2522014-01-29029 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Turkey Point Nuclear Plant, Units 3 and 4, TAC Nos.: MF0982 and MF0983 ML13213A1902013-07-0909 July 2013 Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 3. L-2013-198, Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4.2013-07-0909 July 2013 Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4. L-2013-087, Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 2 of 22013-03-11011 March 2013 Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 2 of 2 ML13095A1962013-03-11011 March 2013 Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 1 of 2 L-2012-417, Flooding Walkdown Report FPL061-PR-001, Rev 0, in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding2012-11-20020 November 2012 Flooding Walkdown Report FPL061-PR-001, Rev 0, in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding L-2011-190, WCAP-17070-NP, Revision 1, Westinghouse Setpoint Methodology for Protection Systems, Turkey Point, Units 3 & 4 (Power Uprate to 2644 Mwt - Core Power), Attachment 2 to L-2011-1902011-06-30030 June 2011 WCAP-17070-NP, Revision 1, Westinghouse Setpoint Methodology for Protection Systems, Turkey Point, Units 3 & 4 (Power Uprate to 2644 Mwt - Core Power), Attachment 2 to L-2011-190 L-2011-032, WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-0322011-02-28028 February 2011 WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-032 L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups ML1035601802010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms ML1035601832010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports ML1035601842010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments ML1035601822010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods ML1035601792010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance ML1035601782010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance ML1035601742010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes 2023-09-22
[Table view] |
Text
L-2018-187 10 CFR 54.17 October 5, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Florida Power & Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Turkey Point Units 3 and 4 Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical Properties of Concrete Due to Irradiation
References:
- 1. FPL Letter L-2018-004 to NRC dated January 30, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application (ADAMS Accession No.
ML18037A812)
- 2. FPL Letter L-2018-082 to NRC dated April 10, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application - Revision 1 (ADAMS Accession No.
ML18113A134)
- 3. Turkey Point Nuclear Generating Units 3 and 4 - Plan for the Irradiated Concrete Technical Issue Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID NO. L-2018-RNW-0002) (ADAMS Accession No.
ML18173A087)
Florida Power & Light Company (FPL) submitted a subsequent license renewal application (SLRA) for Turkey Point Units 3 and 4 to the NRC on January 30, 2018 (Reference 1) and SLRA Revision 1 on April 10, 2018 (Reference 2).
The purpose of this letter is to provide, as an attachment to this letter, a revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical Properties of Concrete Due to Irradiation. In accordance with Reference 3, the NRC conducted an audit on SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical Properties of Concrete Due to Irradiation. The audit took place from July 17 through 19, 2018, and from September 18 through 20, 2018. The staff performed extensive reviews of the irradiation analysis and supporting technical documentation. As a result of these reviews, a revision to SLRA Section 3.5.2.2.2.6 has been prepared and attached. This section supersedes the current Section 3.5.2.2.2.6 in SLRA, Revision 1 in its entirety.
Florida Power & Light Company 700 Universe Boulevard, Juno Beach, FL 33408
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-187 Page 2 of 2 If you have any questions, or need additional information, please contact me at 561-691-2294.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on October 5, 2018.
Sincerely,
~~
William Maher Senior Licensing Director Florida Power & Light Company WDM/SF
Attachment:
Revision to SLRA Section 3.5.2.2.2.6 cc:
Regional Administrator, Region 11, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Project Manager, USNRC, Turkey Point Nuclear Project Manager, USNRC, SLRA Project Manager, USNRC, SLRA Environmental Ms. Cindy Becker, Florida Department of Health
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 1 of 19 Revision to SLRA Section 3.5.2.2.2.6 Discussion As noted in NUREG-2191 and NUREG-2192, reduction of strength, loss of mechanical properties, and cracking due to irradiation could occur in PWR and BWR Group 4 concrete structures that are exposed to high levels of neutron and gamma radiation.
These structures.include the reactor (primary/biological) shield wall, the sacrificial shield wall, and the reactor vessel support/pedestal structure. Data related to the effects and significance of neutron and gamma radiation on concrete mechanical and physical properties is limited, especially for conditions (dose, temperature, etc.) representative of light-water reactor (LWR) plants. However, based on literature review of existing research, radiation fluence limits of 1 x 1019 neutrons/cm 2 neutron radiation and 1 x 108 Gy (1 x 10 10 rad) gamma dose are considered conservative radiation exposure levels beyond which concrete material properties may begin to degrade markedly. NUREG-2191 recommends further evaluation of the need for a plant-specific program to manage aging effects of irradiation if the estimated (calculated) fluence levels or irradiation dose received by any portion of the concrete from neutron (fluence cutoff energy E > 0.1 MeV) or gamma radiation exceeds the respective threshold level during the subsequent period of extended operation or if plant-specific OE of concrete irradiation degradation exists that may impact intended functions. Based on the projected neutron fluence and gamma dose on the Turkey Point primary shield wall, the thresholds above are expected to be exceeded. As a result, an evaluation was performed on the irradiation effects on the primary shield wall at Turkey Point and included in Section 3.5.2.2.2.6 of the Turkey Point SLRA.
In accordance with Reference 1, the NRC conducted an audit on SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical Properties of Concrete Due to Irradiation. The audit took place from July 17 through 19, 2018 and from September 18 through 20, 2018. The staff performed extensive reviews of the irradiation analysis and supporting technical documentation. As a result of these reviews, a revision to SLRA Section 3.5.2.2.2.6 has been prepared and is included below. This section supersedes the current Section 3.5.2.2.2.6 in SLRA, Revision 1 in its entirety.
Discussion Reference
- 1. Turkey Point Nuclear Generating Units 3 and 4 - Plan for the Irradiated Concrete Technical Issue Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID NO. L-2018-RNW-0002) ADAMS Accession No.
ML18173A087
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 2 of 19 Revised SLRA Section 3.5.2.2.2.6 Calculations performed to determine the projected peak neutron fluence and gamma dose within the PTN Unit 3 and Unit 4 reactor cavity for 80 years of plant operation have shown they are above the radiation exposure thresholds of 1 x 10 19 n/cm 2 and 1 x 1010 rad, respectively, noted above for degradation of concrete (reduction of strength or mechanical properties) at the end of the SPEO. The evaluation and supporting calculation summaries of the irradiation effects on the primary shield wall, including embedded reinforcements, and reactor vessel support structures are described below and indicate the primary shield wall and RV supports will be able to perform their component intended functions for the SPEO.
Neutron fluence and gamma dose incident on the primary shield wall at the end of plant life were determined as follows. Westinghouse performed PTN plant specific analyses in 2009 to determine neutron and gamma fluxes incident on the primary shield wall before and after the extended power uprate (EPU) which was implemented in 2012.
The flux values incident on the primary shield wall were calculated for energy groups corresponding to the energy groups provided in the original PTN design basis. The predicted flux values on the primary shield wall are derived from the reactor vessel fluence evaluation performed for the EPU. The EPU fluence evaluation satisfied the requirements set forth in Regulatory Guide 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence". The methodology used for the EPU fluence evaluation was approved by the U.S. Nuclear Regulatory Commission (NRC) and is described in detail in WCAP-14040-A (Ref. 1) and WCAP-16083-NP-A (Ref. 2). The primary shield wall fluxes were calculated by taking the two-dimensional 20 planar flux solution for the radial and azimuthal (r 8) geometry of the reactor vessel fluence evaluation with an axial factor, based on the peak axial relative power for the cycle, of 1.288 was applied. The cited flux value represents an average across the Oto 45° azimuthal span of the 20 planar model. Note that deriving neutron fluence on the primary shield wall using the fluences calculated for reactor vessel embrittlement presented in SLRA Section 4.2 would result in significantly higher values than those calculated by Westinghouse for the primary shield wall. This is due to a number of factors including the application of a 20% bias for fuel assemblies on the periphery of the core, re averaging, attenuation through the reactor vessel wall, and air attenuation in the reactor cavity.
Neutron fluences and gamma doses were then determined from the fluxes described above based on plant operation pre-EPU through 2012 and 2013 (40 years), and post-EPU after 2012 and 2013 (40 years) for Unit 3 and 4 respectively. For the pre-EPU period, the better plant performance of Unit 4 of 77.5% was utilized. For the post-EPU period, a best achievable capacity factor of 95% was assumed. Based on these calculations the neutron fluence and gamma dose incident on the primary shield wall are 3.57 x 1019 neutrons/cm 2 and 1.9 x 10 10 rads, respectively at the end of the SPEO.
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 3 of 19 The main constituents of concrete are .cement, large aggregate (gravel), small aggregate (sand), and water. Concrete consists of aggregates bound together by a cementitious material. Different types of cement could have been used in concrete for
- reactor radiation shielding (typically referenced as reactor cavity concrete, reactor shield concrete, biological shield concrete), including Portland cement, high:.alumina cement, specialty cements, and others. Concrete from plants with US geographical diversity was evaluated based on information contained in NUREG/CR-3474. This reference presented data on concrete from currently operating plants as well as plants that have been decommissioned or had started construction but were not completed. They are considered to be representative of the currently operating plants in the United States.
This information was supplemented with a review of concrete information from additional reactor sites, together with data from ORNL, the Crystal River plant, and the Trojan plant (Ref. 3). Collectively the reviewed data presented in this reference provides good geographical representation to supplement information of NUREG/CR-3474.
For US plants based on the characterization presented in Reference 3, Portland cements were used, with the majority being Type II. Aggregates can be categorized as containing high silica for certain plants to limestone (PTN), with a range of elements represented. Compression strength ranged from 3,000 psi (PTN) to 5,500 psi. Per Section 5.1.6.2 of the UFSAR, the concrete ingredients for the PTN primary shield wall are as follows:
Ingredients Applicable Specification Cement ASTM C-150-64 Florida Type II Air Entraining ASTM C-260-63T (Neutralized Agent Vinsol Resin Airecon)
Water Reducing ASTM C-494-62T Type D Agent (Retardwell, Union Carbide)
ASTM C-33-64 (Fine and Coarse Aggregate Aggregate, Miami Oolite (limestone))
Note that water-to-cement ratios, including for PTN, were not generally available for internal structural concrete. However, the specified cement for PTN is a standard Portland cement. Type II is a general use specification with moderate sulfate resistance. The cement specified to ASTM C-150 contains Portland cement clinker, water or calcium sulfate or both and limestone not to exceed more than 5 percent by mass. The Miami Oolite, now referred to as Miami Limestone, is composed mainly of ooids (small spheroidal sedimentary grains) with some quartz sand and small mollusk
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 4 of 19 fossils. Because of the use of the air entrainment agent, air-entrained concrete usually contains up to 10 percent less water than non-air-entrained concrete of equal slump.
The water reducing agent is typically used for water reduction and retardation and is generally used in small doses, so the water added to the mixture in the form of the admixture itself can be ignored. Type D water-reducing and accelerating admixtures ordinarily reduce mixing-water requirements in the 5 to 8 percent range. From ACI 211.1, an estimate for water-to-cement ratio (w/c ratio) for air-entrained concrete with 28 day compressive strength of 3,000 psi can be made. This would result in a w/c ratio of 0.59. With consideration of the Type D water reducing agent, the resulting w/c ratio would be estimated as 0.54 to 0.56. The expected PTN w/c ratio is relatively high in relation to higher strength concretes. Additionally, the use of the steel liner at the inside diameter of the primary shield wall will assist in reducing evaporative dehydration.
Concrete design codes utilize the specified compressive strength. Design specifications state this value at a defined age, often 28-days from time of mixing. This value is verified by laboratory testing of mix samples. The concrete strength must meet specified values, allowing a finite number of failures per number of tests. Concrete strength generally increases with age. This increase in strength is commonly rapid in the early years and gradually decreases with time. Strength can often be 20% to 30% higher than the 28-day strength in an aged concrete structure. This increased strength, while typically not credited for design assessment, is a condition in an aged structure that will provide additional compensation for reduced concrete properties as a result of long-term irradiation or gamma heating. For the PTN primary shield wall concrete, strength is specified as 3000 psi at 28 days, and 7500 psi at 90 days. These values were confirmed as part of the original concrete test program. However, 3000 psi is used in the analysis (Section 5.1.6.2 of the UFSAR).
Neutron Attenuation The attenuation through the concrete is important for the evaluation of the structural capacity of the primary shield wall. In order to allow for parametric study of radiation in concrete for attenuation, thermal heating, and the effect of rebar, EPRI prepared models for 2-loop and 3-loop pressurized water reactors that focused on radiation in the concrete. These were prepared in collaboration with Professor Benoit Forget from MIT.
These models are described in EPRI report 3002002676 (Ref. 3). The MCNP5 code (Ref. 4) was used and the concrete was typical of concrete constructed with Portland cement. The concrete properties were taken from PNNL-15870 entitled "Compendium of Material Composition Data for Radiation transport Modeling" (Ref. 5). Concrete for two reference types in PNNL-15870 were considered, Concrete, Ordinary (NIST) and Concrete, Portland. The bounding attenuation of these material types was considered.
Based on the use of Portland cement at PTN, the EPRI attenuation was used in the PTN calculations.
The results of these calculations are shown in the figure below (Ref. 7). The MCNP-5 analyses of generic 2 and 3 loop biological shields shown in EPRI Report 30020011710
Turkey Point Units 3 and 4 Docket Nos . 50-250 and 50-251 Revision to SLRA Section 3.5.2 .2.2.6 L-2018-187 Attachment Page 5 of 19 indicated that the attenuation was slightly more rapid in the 3-loop model , thus the 2-loop model was more conservative . The more conservative 2-loop results are shown below (Ref. 7) and were used for the PTN evaluation . Note that the flux is reduced by one order of magnitude in 5 inches.
Neutron Flux Attenuation (E > O.lMeV) 1.0 0.9 \.
0 0.8
a:
~
C 0
nl E OA 0.6 0.5 ' ' '-
(II ~~
i:: 0.3
<{ --...... ~
0.2 --........
0.1 0 .0 0 1 2 3 4 s Co*ncrete Dept h fro m Surfa ce (in inches)
Flux attenuation in Portland concrete in first 5 inches of concrete (E > 0.1 MeV)
The curve above can be fit with a polynomial trend line for use in calculations. The equation for the Attenuation Ratio AR (Ref. 3) is (d is the depth (inches) into the concrete from the surface) :
AR= -9.5577E-06d 5 + 4.8793E-04d 4 - 9.6891 E-03d 3 + 9.4840E-02d 2 - 0.47235d + 1.0165 For PTN SLR , the AR to reach the damage threshold would be= 1/3.57 = 0.28 As noted above , the expected PTN w/c ratio is relatively high in relation to higher strength concretes . Additionally, the use of the steel liner at the inside diameter of the primary shield wall will assist in reducing evaporative dehydration . As stated by Maruyama (Ref. 8) , water loss should relate to the reduction of both heat capacity and shielding performance. Water, which is the main source of the hydrogen atom in the concrete , is considered to have a large impact on the shielding performance of concrete. As such , the concrete attenuation model used for PTN based on the EPRI model above is considered reasonable and appropriate . Using neutron attenuation data and the 80 year neutron fluence information discussed above , the PTN neutron fluence falls below the NUREG-2191 and NUREG-2192 concrete irradiation damage threshold fo r neutrons (1 .0 x 10 19 n/cm 2 ) at a depth of 2.6" into the primary sh ield wall.
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2 .2.6 L-2018-187 Attachment Page 6 of 19 Gamma Attenuation and Heating The same report addressing neutron fluence on the sh ield wall concrete also addresses gamma dose , with additional work contained in Reference 9. Using gamma attenuation data from Figure 1 in Reference 9 for gamma energies> 0.01 MeV, data regarding the gamma dose in the concrete shield wall is provided as a function of distance as shown below.
- Neutron Flux (E > OeV}
lE:+12 1000 lE+ll 100 t
~
1£+10 10
!><
- , 1E+"9 1 -....
~
,.
u::
.
....I!
'*[
E
~ ;o C:
I!)
lE-+08
... t 0.1 :
ts 15 s.
. :c z 1E+C7 I! D.01
+
- Pressure Cavity Concrete 1Ef06 i Vusel +- 0.001 J_
lEtOS O.OOOL 175 200 225 2SO 275 300 32S 350 Radlus(tm)
Neutron and gamma fluxes and dose through the shield wall The data presented above for the gamma dose can be utilized to determine the relative values of total gamma dose as a function of depth into the primary shield wall at PTN .
The use of this data is reasonable to determine the change in dose as a function of depth in the concrete. The data presented in the table below includes the data extracted from the Error! Reference source not found.figure and the equivalent data for PTN , which is developed using the ratio of the attenuated dose rate to reactor cavity dose rate from above . Provided in the table are the 80 year attenuated doses based on the PTN integrated dose of 1.9 x 10 10 rads incident on the inner surface of the primary shield wall. Additionally , a row is provided with linear interpolation of the depth at which the integrated gamma heating dose is equal to 1 x 10 10 rads.
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2 .6 L-2018-187 Attachment Page 7 of 19 Gamma dose as a function of distance through the shield wall Error!
Realistic Reference Radius Depth PTN source not Ratio (cm) (in) Integrated found . Dose Dose (rad)
(rad/sec) 238 0 2 1 1.90E+10 250 4.7 1.9 .95 1.79E+10 264 10.1 n/a .53 1.00E+10 267 11.4 1 .5 9.40E+9 275 14.6 0.75 .375 -
281 16.9 0.6 .3 -
287 19.3 0.5 .25 -
294 22.0 0.4 .2 -
Based on the 80 year gamma dose information presented above , the gamma dose falls below the NUREG-2191 and NUREG-2192 concrete irradiation damage threshold for gamma radiation (1 .0 x 10 10 Rads) at a depth of 10.1" into the primary shield wall.
Elevated temperatures inside and outside the primary shield wall have the potential to degrade concrete structures by accelerating the depletion , or vaporization , of the moisture content in the concrete. Elevated concrete temperatures can result both from the environmental temperatures outside the concrete and from the thermal effects of radiation . At PTN , environmental temperatures are controlled by containment ventilation cooling systems . Reference 7 provides an analysis with what are considered limiting conditions for thermal conductivity, radiation levels , rebar location , air gap (between the reactor vessel and the primary shield wall inner surface) temperature , air gap flow, and outside wall temperature . For a 150°F air temperature in the air gap , the calculated maximum temperature in the concrete is 168°F at a depth of approximately 6 in. from the inside surface of the concrete. The conclusion is that the temperature increase is nominal and is expected to be below the American Concrete Institute (ACI) code requirements. (See figure below from Ref. 7). Note that per Reference 7, the presence of a liner and variation in rebar depth has minimal effect on concrete temperatures .
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2 .2.2 .6 L-2018-187 Attachment Page 8 of 19 Temperature Profile In Biological Shield 170 160 150 1'0 130 120 110 Distance from inner edge of shield (R)
Gamma Heating Effects in Primary Shield Wall For PTN , a calculation was performed as part of the EPU which established a design air gap temperature of 132.4°F. Thus , the resulting temperature of gamma heating for PTN , whose primary shield wall includes a %" steel liner, would be approximately 150°F at a depth of 6 in . from the inside surface of the concrete. Accordingly , gamma heating is not considered an issue for the PTN primary shield wall concrete. The above is provided for information only. Gamma heating was considered in the original CLB calculation for PTN and is bounding since the original design basis gamma flux values used in the calculation are greater than post-EPU values .
Irradiation Effects on the Primary Sh ield Wall With regard to reduction in concrete strength , the reference that has been used by many as the definition of acceptable exposure is a paper by Hilsdorf. In 1978, H. K.
Hilsdorf et al. (Ref. 11) published a paper which compiled and summarized previously published experimental data on the effects of nuclear radiation on the mechanical properties of concrete . The data used by Hilsdorf combined tests with widely varying temperatures and energy levels. Based on these plots , Hilsdorf concluded that neutron radiation with a fluence of greater than 1.0 x 10 19 n/cm 2 may have a detrimental effect on concrete strength and modulus of elasticity (Ref. 11 ).
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2 .2.2.6 L-2018-187 Attachment Page 9 of 19 Since 2014 , significant work has been performed and published on the effects of radiation in concrete . A large database of neutron data was collected and presented by Field , et. al. (Ref. 12). Figure 3 of that reference reproduced below is a plot of concrete strength versus neutron fluence . This presentation of neutron fluence data indicates that the compressive strength appears to begin to decrease at a fluence of approximately 1 x 10 19 n/cm 2 . In this plot, though , the energy spectrum and specimen temperature vary between experiments.
a 2.00 a I 75 C 8 a
150 l_u 1.25 0
- 6. ::> ! 0 *
~ ~ 6. C t::,. A
-5 1.00 a.aa11~ .... ... i**-
~
Cl)
C 0.75 aD
.9* C *
.
~ 8
-~ 0.50 a o rJ Q.
E 0
0.25
-E~ 0.00 o Heston Alcxanda (1963)
- Jd\lonc. Dubro\"Ull (1966) A I . A)c:,umdcr ( l 963
~ - 0 .25 o moire. Alc:<:IJl<ln (1963) * ~wwc. Dubronltl, (I~) 0 lbucrutc. AlcllADdcr (1963)
"' \\'lunstow:. Alcx:wdtt ( l 963)
- Scr)xunnc. £Ucucl& ( l9-l) V Gn,*cLAJCXJW<kr (l96J)
O F1rcbn k. Alcn 11dcr (1963) A fJl<lllUIC Mix. Ritppcueall ( 1966)
- 0 .50 V id. 8 lien (1 960) 9 Q11A1tt1fc. ttb<:rt!ct ( 198! ) + ~{l,c, fll]IWAnl ( 2009)
- ,md, tonc, Oub,m *it ( 1966) o L11nc tone. Alexru1dc:r ( 196 )
- 0.75 + Rlnr Rod<. Ide, ( 1990)
- l.ul1tth>M. ttWl}ltr ( l 9 ! ) o Hanatuc. Oubto\ u ( l 9 - 0J
- Quartz. Pcdcnou ( 19 I ) o Ma1[UC1nc. Alexander (1963)
- Hc.1\"y Al!F<P'"* Lyou (19501 D Gnl,'d and. hXCS ( 19
- 0, > °'11)1 . AlcxllDdcr (1 96.3) A Luuowtc. Otc:kcm.'UI ( 1954
- 1.00 10 19 Neutron fluence energy levels greater than 0.1 MeV have been shown to cause more than 95% of all atom displacements in aggregates (Ref. 13). For this reason , neutron fluence with energy greater than 0.1 MeV is the most relevant for the assessment of concrete capacity. The temperatures of the concrete biological shields for light water reactors (LWRs) are all expected to be less than 200°F (93°C). Test results with much higher temperatures are not considered as representative.
Maruyama , et. al. (Ref. 14) presented consistent data with E > 0.1 MeV and with test temperatures less than 212°F (100°C) along with new test results. The concrete for these tests was considered as typical concrete that would be utilized for commercial nuclear reactor operation. The data is summarized in the figure below. It shows that a
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2 .2.2.6 L-2018-187 Attachment Page 10 of 19 strength reduction begins at a neutron fluence of 1.0 x 10 19 n/cm 2 . This finding is consistent with the original recommendation of Hilsdorf but with additional testing to higher fluence levels and clarity in the test conditions.
- t. Alexande Sandsto e Total flux m x.l OOC
- A exander Um o e Total nu m x.lOOC V Alexander Magnetite Total OW< max.lOOC T Batten Rivers and n.v.t SOC o Oubrovskl Rlversand otal flu)( SOC
- Oubrovsk I Rwersand Total nux lSOC D Dubrovskii Hema "te Total flux lOOC II ubrovskil emati e Total flux 200C
- Fujiwara No*info, ast flux 56C o Con*A
,~P' I
'4 I 1.
1.0
~ - _, .~; ,_...*** . 1- -
I
~
~-- i.... - ~ I*
~
I I* *
. . ..* *ti ~
I ;-
-~
I.I. 0.6 - ~
8<.
"'< . ~
0.4 H-"'
'
Lowe' boundary curv 0.2 ~
0.0 I I 111* I I 1 11 0.1 1 10 100 Neutron flue ce (xlO 9 n/cm2 )
A plot of concrete compressive strength ratio (Fc/Fco) versus total neutron Fluence (Fe tested strength after irradiation; Fco original strength, not irradiated)
Applying the above figure , and utilizing the PTN calculated neutron fluence incident on the primary shield wall of 3.57 x 1019 and the calculated attenuation , the reduction in concrete strength as a result of neutron fluence would be 10% to a depth of 2.6 inches into the primary shield wall. Note that the embedded columns associated with the reactor vessel supports are outside of this region .
Hilsdorf (Ref. 11) also presented the change in compressive strength versus gamma dose for a limited amount of data. This is shown in the figure below. The mean interpolated value of the trend of this data would indicate a decrease in compressive strength for a dose between 2.0 x 10 10 rads to 3.0 x 10 10 rads. However, the data that was used to derive the plot is varied and not considered as fully representative of commercial reactor conditions .
Tu rkey Point Units 3 and 4 Docket Nos . 50-250 and 50-251 Revision to SLRA Section 3.5 .2.2 .2.6 L-2018-187 Attachment Page 11 of 19
- Sommers (301 Compression fcu/ fcuo
...........
~
' ~
" ""'-* ~
I"*
0,6 0,4 0,2 Y' - RADIATION 10* 2 S 10'° 2 5 10" 2 DOSE , rd Change in Concrete Tensile and Compressive Strength versus Gamma Dose Maruyama also performed gamma tests and summarized data (Ref. 14). Representative data for compressive strength and elastic modu lus is shown in the figures below. These figures are annotated with the gamma rad iation at different exposure rates . A tendency for the compressive strength of the specimens to increase the longer that they were irradiated was noted .
115E10 Rad.@ 10 kGy/h 2.3 E10 Rad.@ 10 kGy/h 1.1 5E10 Rad. @5 kGy/h 90 so
- 80
"' 70
.
--- ....
- T i 40 45
~
-
~
- - . .
- --y
~ 35 T ,,_ _ / ' :r. __,A
- ' 60 2 30 r y--
- r
~
X
., so -+- lO kGy/h :,
"8 25
- - lOkGy/h
~ 40 - -5kGy/h - -s kGy/h
., -+- 2.S kGy/h ~ 20 -+- 2.S kG y/h
-~ 30 ...... l.2SkGy/h -~ 15 ...... 1.25 kGy/h
~a. 20 - - Hea ting (10 kgy/h)
~ 10 - - Heating (10 kgy/h)
- . - Heating (1.25 kGy/h) ----- Heating (1.25 kGy/h)
E 10 5 0 - - Reference -+- Reference u 0 0 0 4 8 ~ ll 0 4 8 16 32 Experiment al peri od (mont hs) Experimental period (months)
(a) Compressive strength (b) Young' s modulus Change in Concrete Compressive Strength and Elastic Modulus versus Gamma Dose
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 12 of 19 The Maruyama paper suggested that either the threshold reference value for gamma exposure be raised to a high level or abandoned entirely. With consideration of the prior Hillsdorf data and the available test data presented by Maruyama, the test data indicates gamma irradiation up to and beyond a threshold of 2.3 x 1010 Rads has no effect on material properties.
Based on the above discussion, and considering the 80 year gamma dose incident on the primary shield wall at PTN is 1.9 x 10 10 Rads, there will be no degradation of the primary shield concrete at PTN due gamma radiation. However, FPL will continue to follow EPRI and industry efforts to better define the effects of gamma radiation on concrete, and will update this evaluation and implement a plant specific AMP if necessary as noted in Commitment Number 53 in Table 17-3.
From Reference 7, the structural capacity of the primary shield wall will be potentially affected by the depth of concrete where the neutron fluence exceeds the damage threshold of 1.0 x 10 19 n/cm 2 (E > 0.1 MeV). Where the neutron fluence exceeds 1.0 x 1019 n/cm 2 (E > 0.1 MeV), there could also be an expansion of the concrete called radiation-induced volumetric expansion (RIVE) with a corresponding reduction in concrete properties. The extent of these changes will be limited to the inner inches of concrete. The effect of RIVE is addressed below.
As presented above, the primary shield wall concrete retains a substantial portion of its compressive strength for the radiation values expected to be experienced through the SPEO, and is shown to retain 90% or more of its compressive strength for neutron fluence and gamma dose values well above the values even on the inner surface of the concrete shield wall. Note that the radiation evaluations discussed above are based on the neutron flux and gamma doses that occur along the axial centerline of the active fuel region. As such, these are expected to be peak values. Lower values are expected along the wall at points further away from the axial centerline of the active fuel region, as shown in the figure below (Ref. 6). Thus, no concrete will be exposed to gamma radiation or neutron fluence values above the NUREG-2191 and NUREG-2192 concrete degradation thresholds of 1 x 10 10 rad and 1 x 1019 n/cm2 , respectively, above and below the active fuel region heights along the primary shield wall.
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 13 of 19
'1 t(l LOEt09 4 - - - - - r . . - - - - - - - - - - - - , . - - - - - - - - - - - - - - - - - - 1 Ii
.,
>"
...
~
A
!!!.
!§ 1'J LOEtOS - I - - - - + - - - ; , - - - - - - - - - - - - - - - - - - . - - - - - - - - - ~ - - ; , - - - - - ;
<J z
LOEt07 ---------;'-----~-----"-~----~---'-----~------I O.OOE+OO 1.00E!-02 2.0IJEt.02 3.0<>aOZ 4.00&02 5.00&02 Helght(cm]
SLR Primary Shield Wall Structural Evaluation The primary shield wall at PTN Unit 3 and Unit 4 is 7'-0" (84") thick, as described in UFSAR Sections 5.1.8.1 and 5.1.8.3, and is part of the RV support structure, as described in UFSAR Section 5.1.9.3. The RV supports consist of six (6) individual supports, one of which is placed under each of the three hot leg and three cold leg reactor coolant system pipe nozzles. A majority of each RV support is embedded in the primary shield wall. The primary shield wall also provides structural support for a portion of the containment internal structure that includes the slab at El. 58'-0", walls above 32'-0", radial walls above 32'- O" and the slab at 30'-6". The primary shield wall is 21 feet in height, surrounds the RV (that is approximately 14.5 feet in diameter), and extends from just below the matting flange with the RV head at the refueling canal floor down to where it connects with the containment building foundation. The wall is a donut shaped reinforced concrete (3000 psi) structure that has an inside diameter of 19 feet and an outside octagon-al sided wall with a minimum outside diameter of 33 feet.
As noted above, concrete depths required to reduce the neutron fluence levels to below the NUREG-2191 and NUREG-2192 threshold value is 2.6 inches. Based on the discussion above, the worst case reduction in the strength of the concrete could occur along the circumference of the inner face of the primary shield wall up to 2.6 inches in depth at the active fuel core midline elevation, with the effects decreasing with concrete depth and vertical distance from the fuel centerline to the ends of the active fuel core.
No radiation levels in excess of the threshold value is expected above and below the active fuel region elevation along the interior face of the primary shield wall. Reinforcing steel (rebar) across from the area encompassing the effective height of active fuel is located a distance of 19 inches from the inner edge of the wall, and is not affected by increased neutron fluence or gamma dose.
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 14 of 19 A review of the impact of the possible irradiation effects on the concrete and the ability of the concrete to continue to perform its component intended functions through the SPEO was performed. The conclusions are as follows:
Radiation effects such as neutron fluence and Radiation-Induced-Volumetric-Expansion (RIVE) effects were determined. The existing primary shield wall was evaluated for the CLB loading with the radiation effects by using the same original design analysis approach as the recently updated CLB calculation. Due to the RIVE effect, the excessive compressive stress was calculated and the inner side of the concrete (up to 3.14 inches) is considered as yielded (cracked). Accordingly, the design stresses were re-calculated for the reduced concrete section due to the crack under the CLB loading and considering the reduced strengths and modulus of the irradiated concrete.
Comparing with the un-irradiated concrete (where the maximum interaction ratio (IR) is calculated as 0.74), the maximum IR for the irradiated concrete (including the cracking discussed above) was calculated as 0.82, which has increased but is still less than 1.0.
Therefore, the existing primary shield wall including the radiation effects is qualified for the CLB loading based on the evaluation results.
An additional evaluation was performed demonstrating that the primary shield wall can allow a cracking depth of up to 7 inches and still be able to perform its component intended function. Thus much higher radiation exposures can be accommodated by the primary shield wall. Please note that leak-before-break (LBB) of reactor coolant system auxiliary lines has been submitted as part of the SLRA (Section 4.7.4 and Enclosure 4, 2). Upon NRC approval, the loads on the reactor vessel supports and primary shield wall concrete will be significantly reduced. For the primary shield wall, implementation of auxiliary line LBB will result in the IR being reduced to 0.41 (tension).
=
The governing load case would be Normal (IR 0.41 for tension) and Emergency (IR =
0.32 for compression). Considering the IR increasing ratios (i.e., 10.8% for tension and 10.2% for the maximum compression), .the maximum IRs are approximated as 0.45 (=
0.41 x 1.108) for tension and 0.35 (= 0.32 x 1.102) for the maximum compression.
In addition, there has been no site-specific OE relative to radiation effects on concrete intended functions. Also, the Turkey Point reactor vessels are nozzle supported as described above, and there is no support pedestal. The RV supports are structural steel with most of the support embedded in the primary shield wall. The RV supports are not exposed to the same levels of neutron and gamma radiation as the horizontal exposed supports are at the RV nozzle level, above the effective height of the active fuel, and the embedded portions are shielded by the concrete wall.
SLR Reactor Vessel Support Evaluation The aging effect of irradiation of structural steel is limited to reduction in fracture toughness due to embrittlement from exposure to neutron fluence. The NRC previously identified radiation embrittlement of the RV supports as a generic safety issue in GSl-
- 15. The NRC resolved the issue, as documented in NUREG-1509 on the basis of a risk-informed evaluation, without imposing new requirements on licensees. Additionally,
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 15 of 19 NUREG-2191 and NUREG-2192 do not specifically identify the reactor vessel support steel for aging effect reduction in fracture toughness as a result of irradiation embrittlement.
However, during the SLR NRC concrete irradiation audit conducted from July 17-20, 2018 at Turkey Point, the NRC identified reduction in fracture toughness due to irradiation embrittlement of the reactor vessel (RV) support steel as a potential aging effect for consideration. The NRC noted NUREG-1509 as a resource for addressing the issue for PTN SLR. Accordingly, an evaluation of the PTN RV supports for reduction in fracture toughness for SLR is provided below.
The RV support structure for each PTN Unit consists of six (6) individual supports, one of which is placed under each of the three hot leg and three cold leg Reactor Coolant System pipe nozzles at elevation (EL) 25'-7 %". A majority of each RV support is embedded in the primary shield wall. The primary shield wall is 21 feet in height, surrounds the RV (that is approximately 14.5 feet in diameter) and has an inside diameter of 19 feet. The reactor vessel active fuel region is 12 feet in height, is located between the upper and lower core plates and extends approximately from EL 8'-1 O" to EL 20'-10'. The approximate active fuel core midline is at elevation 14'-10". The RV support structure includes vertical columns, cantilever beams, horizontal (cross) beams and roller assembly. The columns and portion of the cantilever beams are located inside the primary shield wall, with the centerline of the cantilever beams at a height approximately equal to the top of the active fuel, and the inboard edge of the innermost column - 5 inches from the inside surface of the primary shield wall. Note that the bottom horizontal beams do not perform a structural function and are not included in the RV support analysis. As such, and because the slightly higher fluence incident on the lower beams than on the cantilever beams would not embrittle the lower beams to the point of gross failure, the lower horizontal beams are not considered in the evaluation.
As noted in the figure above, the variation of radiation fields with elevation is small in the region close to the core mid-plane. At an elevation corresponding to the top of the fuel, neutron fluence is approximately 40% of the fluence incident on the primary shield wall at the core mid-plane. At two feet above the top of the fuel, the neutron fluence (< 1 x 10 17 n/cm 2) is well below the fluence incident on the shield wall. Based on these fluence values, the upper portions of the RV supports (roller assembly, tangential brackets, side shims, machine screws that attach to the RV nozzle pads, etc.) are greater than two feet above the top of the fuel. Thus, they are not exposed to neutron fluences that would cause reduction in fracture toughness due to neutron embrittlement and no further evaluation is required. The cantilever beams and top cross beams, which are located at an elevation corresponding to the top of the fuel, will see an end-of-life fluence of (3.57 x 10 19 n/cm 2 x 0.40) -1.43 x 1019 n/cm2 . The end-of-life fluence on the RV support columns embedded in the concrete would be less than 10% of the fluence incident on the primary shield wall at the core mid-plane height.
The remaining RV support components to be evaluated for reduction in fracture toughness due to irradiation embrittlement consist of the embedded columns, the
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 16 of 19 cantilever beams, the cross beams, and associated bolting. The columns and beams are 10WF89 and 14WF342 composed of ASTM A588 Type B steel. The bolting is 2%"
- 4.5 UNC-2A x 9" long with 5" of thread composed of ASTM A354, Grade BC alloy steel. Certified mill test reports (CMTRs) for the beams and bolting were reviewed to confirm the material composition and properties.
Based on review of NUREG-1509 and the design documentation of the PTN RV support bolting, no further evaluation for reduction in fracture toughness for the bolting is required.
Per NUREG-1509, the reduction in fracture toughness assessment of RV support steel can be based on a transition temperature analysis, wherein a demonstration is made that there is adequate margin between the minimum operating temperature and the ductile-to-brittle fracture mode transition temperature (commonly known as the NOT temperature) for end-of-life (EOL) conditions. The transition temperature approach is based on the proposition that catastrophic failure by brittle fracture can be avoided by maintaining the normal operating RV support service temperature above the NOT temperature of the steel. When using the transition temperature to evaluate the support integrity, the NOT temperature at EOL should include the irradiation induced shift.
Uncertainties related to NOT determinations should also include a margin of safety between the lowest service temperature (LST) and the NOT temperature.
Demonstration that the RV supports are in conformance with this relationship is necessary and sufficient to preclude their failure by brittle fracture.
The NOT temperature of steel is one of the essential parameters in brittle fracture analysis. Following the ASME Code, the NOT temperature may be defined as the highest temperature for fracture of a standard drop-weight specimen when tested to ASTM Standard Test Method E 208-87a. The NOT also can be based on the temperature at which_Charpy V-notch specimens absorb a specified amount of energy.
To determine the EOL NOT temperature, the initial, material-dependent NOT and the anticipated shift (increase) as a function of radiation exposure needs to be known.
For the columns and beams, from Table 4-1 of NUREG-1509, the normalized initial NOT (mean plus 1.3 standard deviation) for the ASTM A588 Type B material is -27°F.
NUREG-1509 provides a method for approximating the NOT shift by determining exposure in terms of displacements per atom (dpa), and then using Figure 3-1 of that reference to establish the LlNDT. To calculate the approximate LlNDT for the beam material, the PTN specific neutron flux must first be converted to a dpa rate and then total dpa for 80 years calculated. For PTN, the total dpa through the end of the SPEO was calculated to be 4.89 x 1o-3 .
Using the fitted curve from Figure 3-1 of NUREG-1509, the LlRDT would be -70 °C, or 126 °F. The fitted curve was utilized because the test data points associated with the dpa being evaluated (in the 1 to 5 x 1o-3 range) are all below the fitted data curve.
Additionally, the upper-bound curve in the region of interest included points that combine neutron and gamma exposure and are based on only 2 worst case data points.
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 17 of 19 The end-of-life NOT for the beam material would be -99°F which is below the normal operating temperature (Modes 1 through 4) in the reactor cavity of -120°F. This provides an NOT margin of 21 °F at the end of the SPEO. Also note that the initial NOT is based on mean plus 1.3 standard deviation. This could provide a further margin of 23°F based on the actual material properties from the CMTRs.
Additional conservatisms associated with stress analysis of RV support steel are described below.
(1) Per the CMTRs for the beams, the yield strength of the beam is reported as 58.16 ksi, which is about 20% larger than 48.75 ksi (used in the determination of the maximum IR of the RV support steel).
(2) The yield strength of 48.75 ksi was calculated based on the operating temperature of 150 °F, which is higher temperature than the calculated ambient temperature of 120
°F. Lower temperature results in more capacity for the RPV support steel.
(3) Based on the span depth ratio of the cantilever portion of the RPV support steel, the beam is considered as a deep beam where the shear is typically governing. Per the stress analysis, the shear capacity of the beam was calculated by considering only the web area. The beam is reinforced by using 1" thick stiffener plates. Thus, the shear stress flows not only in the web but also in the stiffeners and the top and bottom flanges of the beam. The effective area of the beam for the shear should be larger than the web-only area.
Also, upon implementation of the auxiliary line LBS analysis (excluding LOCA loads),
and removing some of the conservatism used in the stress analysis, the maximum shear stress of the beam is approximated as 5.41 ksi, which is less than the NUREG-1509 threshold of 6 ksi.
Finally, visual inspections performed under the ASME Section XI, Subsection IWF aging management program (AMP), described in SLRA Sections 17.2.2.32 and B.2.3.32, have not identified dimensional shifts or changes in the RV support steel. Future inspections will provide early indication of issues associated with the supports.
Accordingly, there is reasonable assurance that loss (or reduction) of fracture toughness due to irradiation embrittlement will not affect the ability of the RV structural steel to perform its component intended functions through the SPEO.
Conclusion Based on the above, a plant-specific program to manage the effects of concrete irradiation is not expected to be necessary to ensure the components perform their intended function consistent with the CLB through the subsequent period of extended operation. However, FPL will continue to follow the on-going industry efforts that are clarifying the effects of irradiation of concrete and corresponding aging management recommendations as noted in Commitment Number 53 in Table 17-3, and will:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 18 of 19 a) ensure their applicability to the PTN Unit 3 and Unit 4 primary shield wall and associated reactor vessel supports; b) update design calculations, as appropriate; and c) develop an informed plant-specific program, if needed.
With regard to concrete inside containment other than the primary shield wall, the total integrated gamma dose received by SSCs during 80 years of normal operation based on environmental qualification (EQ) documentation information is 5.02 x 107 rads.
Neutron fluence from the reactor vessel/core will attenuate to well below the NUREG-2191 and NUREG-2192 fluence threshold for degradation in or before the 84 inch thickness of the primary shield wall and is, therefore, not a concern outside the reactor cavity, consistent with the existing CLB.
References
- 1. Westinghouse Electric Company Document WCAP-14040-A, Revision 4, "Methodology Used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves," May 2004.
- 2. Westinghouse Electric Company Document WCAP-16083-NP-A, Revision 0, "Benchmark Testing of the FERRET Code for Least Squares Evaluation of Light Water Reactor Dosimetry," May 2006.
- 3. EPRI Report No. 3002002676, "Expected Condition of Reactor Cavity Concrete after 80-Years of Radiation Exposure", Electric Power Research Institute, Charlotte, NC, March 2014.
- 4. Los Alamos National Lab., A General Monte-Carlo (N-Particle) (MCNP)
Transport Code.
- 5. PNNL 15870, Rev. 1 "Compendium of Material Composition Date for Radiation Transport Modelling", April, 2006.
- 6. I. Remec, Radiation Environment in Concrete Biological Shields of Nuclear Power Plants, Link:
https://lwrs.inl.gov/Materials%20Aging%20and%20Degradation/ProgressReportR adEffe ctsinConcreteBioShield Final.pdf
- 7. EPRI Report No. 3002011710, "Irradiation Damage of the Concrete Biological Shield Wall for Aging Management", EPRI, Palo Alto, CA, May 2018.
- 8. Maruyama, I, K. Haba, 0 Sato, S. Ishikawa, 0. Kontani, M. Takizawa "A numerical model for concrete strength change under neutron and gamma-ray irradiation", *Journal of Advanced Concrete Technology, Materials, Structures and Environment. Vol. 14 (2016), pp 144-162.
- 9. T.M. Rosseel, et al, "Radiation Damage in Reactor Cavity Concrete," Oak Ridge National Laboratory, Oak Ridge, TN, Proceedings of Fontevraud 8, Contribution
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision to SLRA Section 3.5.2.2.2.6 L-2018-187 Attachment Page 19 of 19 of Materials Investigations and Operating Experience to LWR Safety, Performance and Reliability, September 2014. Link:
https://www.osti.gov/scitech/servlets/purl/1201282
- 10. EPRI Report No. 3002008129, "Long-Term Operations: Impact of Radiation Heating on PWR Biological Shield Concrete", 2016.
11.American Concrete Institute (ACI) SP 55-10, "The Effects of Nuclear Radiation on the Mechanical Properties of Concrete," H.K. Hilsdorf, et al, ACI, 1978. Link:
http://large.stanford.edu/courses/2015/ph241 /anzelmo 1/docs/h ilsdorf.pdf
- 12. Field, K. G., Le Pape, Y., and Remec, I., "Perspective on Radiation Effects in Concrete for Nuclear Power Plants - Part I: Qualification of Radiation Exposure and Radiation Effects", Nuclear Engineering and Design, Vol. 282, February 2015, pp 126-143.
13.1. Remec, et al, "Characterization of Radiation Fields in Biological Shields of Nuclear Power Plants for Assessing Concrete Degradation," Oak Ridge National Laboratory, Oak Ridge, TN, Proceedings of ISRD 15 - International Symposium on Reactor Dosimetry, Link: https://www.epj-conferences.org/articles/epjconf/abs/2016/01/epjconf-lSRD2015 02002/epjconf-lSRD2015 02002.html
- 14. Maruyama, I., Kontani, 0., Takizawa, M., Sawada, S., Ishikawa, S., Yasukouchi, J., Sato, 0., Etch, J., and lgari, T., "Development of Soundness Assessment Procedure for Concrete Members affected by Neutron and Gamma-Ray Irradiation", Journal of Advanced Concrete Technology, Vol. 15, pp 440-523, 2017. Link: https://www.jstage.jst.go.jp/article/jact/15/9/15 440/ article