L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report

From kanterella
Jump to navigation Jump to search

Correction to U4R33 Steam Generator Tube Inspection Report
ML23089A051
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 03/30/2023
From: Strand D
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-2023-049
Download: ML23089A051 (1)


Text

  • l=PL.

U.S. Nuclear Regulatory Commission March 30, 2023 L-2023-049 10 CFR 50 .36 Attn: Document Control Desk Washington D C 20555-0001 RE: Turkey Point Nuclear Generating Station, Unit 4 Docket No. 50-251 Subsequent Renewed Facility Operating License DPR-41 Correction to U4R33 Steam Generator Tube Inspection Report

Reference:

1. Florida Power & Light Company letter L-2022-149, U4R33 Steam Generator Tube Inspection Report, October 4, 2022 (ADAMS Accession No. ML22277A803)

In Reference 1, Florida Power & Light Company (FPL) submitted the Turkey Point Unit 4 Cycle 33 Refueling Outage (U4R33) Steam Generator Tube Inspection Report, as required by Turkey Point Technical Specification (TS) 6.9.1.8. The report summarized the results of the Turkey Point Steam Generator (SG) tube inspection completed Fall 2022 in accordance with Turkey Point TS 6.8.4.j .

Subsequent to the Reference 1 submittal, FPL identified an error on page 1O of the report. Specifically, tube wear indications at broached support plates (TSP wear) in SG-8 were inadvertently copied to the TSP wear indication listing for SG-C as well. The issue has been entered into FPL's corrective action program (CAP) .

The attachment to this letter contains the corrected ECT data for page 10, as evidenced by the revision bar in the right-hand column . The corrected page 10 supersedes and replaces page 1O of Reference 1.

This letter contains no new regulatory commitments.

Should you have any questions regarding this submission, please contact Mr. Kenneth Mack, Fleet Licensing Manager, at 561- 904-3635.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the 30th day of March 2023 .

Dianne St and General anager, Regulatory Affairs Attachment Enclosure cc: USNRC Regional Administrator, Region II USN RC Project Manager, Turkey Point Nuclear Generating Station USNRC Senior Resident Inspector, Turkey Point Nuclear Generating Station Ms. Cindy Becker, Florida Department of Health Florida Power & Light Company 9760 SW 344th Street, Homestead, FL 33035

Turkey Point Nuclear Generating Station, Unit 4 L-2023-049 Docket No. 50-251 10 CFR 50.36 Attachment ATTACHMENT CORRECTEDPAGE10TO TURKEY POINT U4R33 STEAM GENERATOR TUBE INSPECTION REPORT

( 1 page follows)

Turkey Point Un it 4 L-2022-149 Docket No. 50-251 Page 10of10 Enclosure Appendix 8 - TP4-33 Listing of Indications Wear at TTS, FOB and TSP SG- A SG-B (cont ' d )

ROW COL VOLTS IND LOCATION %TW ETSS 44 53 0.13 WAR BAH-0 . 32 6 96910 . 1 0 . 16 WAR BAH-0.32 10 27905.1 35 38 0.30 WAR TSC+0.08 30 27901.1 35 41 0.46 WAR TSC+0 . 00 39 27901.1 ROW COL VOLTS IND LOC'N %TW ETSS 38 36 0.45 WAR TSC+0 . 05 39 27901.1 13 4 0 . 26 WAR BAH- 0 . 24 12 96910 .1 5 12 0.26 WAR 04H+0 . 45 10 96910 . 1 17 8 0 . 11 WAR BAH-0 . 16 5 96910 . 1 0 . 39 WAR 04H+0.45 17 27905.1 18 86 0.26 WAR BAC- 0.32 11 92910 . 1 5 86 0.10 WAR OlH+0 . 69 4 96910 . 1 0.25 WAR BAC- 0 . 32 13 27905 . 1 0.10 WAR OlH+0.69 8 27905 . 1 21 6 0 . 16 WAR BAH- 0 . 13 8 96910.1 8 3 0 . 38 WAR 02H-0.67 13 96910 . 1 26 10 0 . 14 WAR BAH+0.35 7 96910.1 0.42 WAR 02H-0 . 67 18 27905 . 1 26 13 0.16 WAR BAH+0 . 43 7 96910.1 9 80 0 . 10 WAR 02H +0. 48 4 96910.1 36 61 0 . 29 WAR BAH-0.29 12 96910 . 1 0 . 19 WAR 02H +0 . 51 11 27905.1 0 . 36 WAR BAH-0.27 17 2 7 905.1 28 80 0.19 WAR 05H - 0 . 56 11 27905.1 39 28 0 . 12 WAR BAH+0 . 11 6 96910.1 0 . 14 WAR 05H - 0 . 56 6 96910.1 4 58 0 . 14 WAR 02H+0.40 6 96910.1 29 80 0 . 14 WAR 03H - 0.51 6 96910 . 1 0.25 WAR 02H+0.40 13 27905.1 31 60 0.42 WAR 02H-0 . 32 16 96910. 1 96910 . 1 0.42 WAR 02H-0 . 32 18 27905.1 10 62 0.19 WAR 04H+0 . 43 8 33 18 0 . 07 WAR 02H-0.72 3 96910 . 1 11 86 0.19 WAR 04C+0.48 11 27905 . 1 0.10 WAR 02H-0.72 8 27905.1 0.16 WAR 04C+0.48 7 96910 . 1 02H-0 . 37 8 96910. 1 35 49 0 . 19 WAR 0 . 23 WAR 02H-0 . 37 13 27905 . 1 40 25 0 . 10 WAR OlC+0 . 37 5 96910. 1 SG- B 43 37 0 . 29 WAR 04C+0.51 15 27905.1 ROW COL VOLTS IND LOCATION %TW ETSS 0.21 WAR 04C+0 . 51 10 96910 .1 43 39 0.13 WAR 04C+0.48 7 96910 . 1 27 22 0 . 22 WAR TSH+0.08 25 27901.1 0 . 22 WAR 04C+0.48 12 27905.1 19 86 0.20 WAR BAH-0.29 8 96910.1 44 38 0 . 35 WAR 04C+0.51 16 96910 . 1 0 . 22 WAR BAH-0.29 12 27905 . 1 0 . 46 WAR 04C+0.51 19 27905 . 1 0 . 22 WAR BAH-0 . 32 9 96910 . 1 0.24 WAR BAH-0 . 32 13 27905 . 1 29 39 0 . 11 WAR BAH+0.40 5 96910 . 1 SG- C 0 . 14 WAR BAH+0.40 9 27905 . 1 ROW COL VOLTS IND LOCATION %TW ETSS 35 70 0 . 19 WAR BAH-0.37 8 96910.1 0.22 WAR BAH-0 . 37 12 27905 . 1 28 82 0.23 WAR BAH+0 . 43 11 27905.1 36 19 0.12 WAR BAH+0.48 5 96910 . 1 0 . 22 WAR BAH+0.43 7 96910.1 0.13 WAR BAH+0 . 48 9 27905.1 18 42 0.15 WAR 06H-0 . 67 6

  • 96910 . 1 40 26 0.17 WAR BAH-0.37 7 96910 . 1 0.20 WAR 06H-0 . 67 12 27905 . 1 0.19 WAR BAH-0.37 11 27905.1 19 42 0 . 38 WAR 06H - 0 . 64 13 96910 . 1 0 . 12 WAR BAH+0 . 03 5 96910 .1 0 . 47 WAR 06H-0.64 20 27905 . 1 0.14 WAR BAH+0 . 03 9 27905 . 1 35 75 0 . 25 WAR 06H+0.24 11 96910.1 42 48 0.25 WAR BAH-0.40 10 96910 . 1 45 50 0 . 22 WAR 04H+0 . 35 8 96910 .1 0 . 28 WAR BAH-0.40 14 27905.1