ML23333A017 | 27 November 2023 | Attachment I - Chin - the Cooling Canal System at the FPL-Turkey-Point Power Station | |
ML23333A014 | 27 November 2023 | Attachment F - Groundwater Tek Inc - Peer Review Study Final-1 | Power Uprate |
ML24012A042 | 16 November 2023 | FAQ 23-03 Turkey Point IE01 Proposed NRC Response | Power change |
ML23265A551 | 22 September 2023 | Enclosure 3: WCAP-18830-NP, Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles | Aging Management Fuel cladding Coast down Power Uprate |
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1) | 21 August 2023 | Inservice Inspection Program Owner'S Activity Report (OAR-1) | Boric Acid |
L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report | 30 March 2023 | Correction to U4R33 Steam Generator Tube Inspection Report | |
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | 27 March 2023 | and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | Fuel cladding |
L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis | 10 February 2023 | Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis | Cyber Security Surveillance Frequency Control Program Time Critical Operator Action |
L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | 26 October 2022 | and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | |
L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) | 26 August 2022 | License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) | Probabilistic Risk Assessment Fire Protection Program |
L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 | 19 August 2022 | Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 | Safe Shutdown Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Fuel cladding |
L-2022-038, Emergency Response Data System (Eros) Changes | 17 May 2022 | Emergency Response Data System (Eros) Changes | |
L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 | 3 May 2022 | Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 | Anticipated operational occurrence |
L-2022-022, Updated Conditions of Certification Report | 14 February 2022 | Updated Conditions of Certification Report | Enforcement Discretion Incorporated by reference Annual Radiological Environmental Operating Report |
L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions | 16 September 2021 | Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions | Safe Shutdown FLEX |
L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds) | 24 June 2021 | Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds) | Boric Acid Aging Management License Renewal Subsequent License Renewal Unidentified leakage |
IR 05000250/2020011 | 23 July 2020 | NRC Inspection Report 05000250-2020011 and 05000251-2020011 and Investigation Report 2-2019-011; and Apparent Violation Final | Significance Determination Process |
L-2020-073, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping | 13 April 2020 | Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping | Ultimate heat sink Non-Destructive Examination Past operability Coatings Nondestructive Examination Incorporated by reference Through-Wall Leak |
ML20098F341 | 7 April 2020 | Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information | Downpower |
L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification | 25 November 2019 | Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification | Hydrostatic Moisture barrier Biofouling |
L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | 6 August 2019 | 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | |
L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds | 19 March 2019 | Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds | Nondestructive Examination Dissimilar Metal Weld |
L-2019-054, Baffle-Former Bolts Predictive Evaluations | 13 March 2019 | Baffle-Former Bolts Predictive Evaluations | Finite Element Analysis Aging Management |
ML19072A162 | 5 March 2019 | National Park Service, Southeast Regional Office, Comments Dated March 5, 2019, on Turkey Point Nuclear Generating Units 3 and 4 Preliminary Draft SEIS Regarding Subsequent License Renewal | Ultimate heat sink |
ML18353A835 | 31 December 2018 | Biological Assessment for the Turkey Point Units 3 and 4 Proposed Subsequent License Renewal | Ultimate heat sink License Renewal Subsequent License Renewal Power Uprate |
ML18299A116 | 15 October 2018 | Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal | Non-Destructive Examination Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Aging Management License Renewal Subsequent License Renewal Power Uprate |
L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines | 12 October 2018 | Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines | Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Earthquake Through-Wall Leak |
ML18299A118 | 12 October 2018 | Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018 | Through-Wall Leak |
L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation | 5 October 2018 | Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation | Aging Management Power Uprate |
L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review | 5 October 2018 | Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review | |
L-2018-173, Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program | 21 September 2018 | Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program | Coatings |
ML18254A341 | 11 September 2018 | Fish and Wildlife Service'S List of Migratory Birds Near Turkey Point | |
ML18227B521 | 15 August 2018 | Submit Attachment a, Annual Hourly Percent Frequency of Vertical and Horizontal Stability Categories by Wind Direction and Wind Speed | |
ML18227A290 | 15 August 2018 | Submit Report Contains Official Summary of Startup Physics Tests, Unit 4 Cycle Iii. the Tests Were Conducted in Accordance with Operating Procedure 0204.5, Startup Sequence After Refueling | Shutdown Margin |
L-2018-098, Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.46 | 18 April 2018 | Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.46 | Fuel cladding |
L-2018-054, Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/17 | 16 February 2018 | Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/17 | Annual Radioactive Effluent Release Report Process Control Program |
L-2017-148, Special Report - Accident Monitoring Instrumentation | 11 August 2017 | Special Report - Accident Monitoring Instrumentation | Grab sample |
L-2017-123, Special Report - Standby Steam Generator Feedwater Pumps Inoperable | 29 June 2017 | Special Report - Standby Steam Generator Feedwater Pumps Inoperable | |
L-2017-124, Flooding Focused Evaluation Summary | 29 June 2017 | Flooding Focused Evaluation Summary | High winds Internal Flooding Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation Earthquake |
L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 | 17 April 2017 | Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 | Fuel cladding |
L-2016-226, NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information | 20 December 2016 | NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information | High winds Hydrostatic FLEX Fukushima Dai-Ichi Earthquake |
L-2016-058, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis | 23 March 2016 | Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis | |
ML16013A472 | 22 January 2016 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
L-2015-313, Special Report - Accident Monitoring Instrumentation | 18 December 2015 | Special Report - Accident Monitoring Instrumentation | |
L-2015-137, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments | 22 April 2015 | Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Anticipated operational occurrence Hydrostatic Temporary Modification Missed surveillance Operability Determination Exemption Request Earthquake Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Continuous fire watch Grace period Power change Coast down Unidentified leakage Power Uprate |
ML15054A037 | 23 February 2015 | U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Fire PRA Facts and Observations for Turkey Point Nuclear Generating Stations, Units 3 and 4 | Safe Shutdown Fire Barrier Thermoset |
ML14338A554 | 4 December 2014 | NRC-2013- TN2986-NRC 2014 St. Lucie | Fukushima Dai-Ichi |
ML14338A555 | 4 December 2014 | NRC-2013-TN3079-NRC 2014 St. Lucie License Renewal | Aging Management License Renewal |
L-2014-233, Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I) | 22 July 2014 | Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I) | |
L-2014-085, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | 27 March 2014 | Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Fukushima Dai-Ichi Design basis earthquake Earthquake |