Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23333A01727 November 2023Attachment I - Chin - the Cooling Canal System at the FPL-Turkey-Point Power Station
ML23333A01427 November 2023Attachment F - Groundwater Tek Inc - Peer Review Study Final-1Power Uprate
ML24012A04216 November 2023FAQ 23-03 Turkey Point IE01 Proposed NRC ResponsePower change
ML23265A55122 September 2023Enclosure 3: WCAP-18830-NP, Turkey Point Fuel Storage Criticality Analysis for 24 Month CyclesAging Management
Fuel cladding
Coast down
Power Uprate
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)21 August 2023Inservice Inspection Program Owner'S Activity Report (OAR-1)Boric Acid
L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report30 March 2023Correction to U4R33 Steam Generator Tube Inspection Report
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications27 March 2023and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or ApplicationsFuel cladding
L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis10 February 2023Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / NisCyber Security
Surveillance Frequency Control Program
Time Critical Operator Action
L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report26 October 2022and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)26 August 2022License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)Probabilistic Risk Assessment
Fire Protection Program
L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-00419 August 2022Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Fuel cladding
L-2022-038, Emergency Response Data System (Eros) Changes17 May 2022Emergency Response Data System (Eros) Changes
L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0043 May 2022Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004Anticipated operational occurrence
L-2022-022, Updated Conditions of Certification Report14 February 2022Updated Conditions of Certification ReportEnforcement Discretion
Incorporated by reference
Annual Radiological Environmental Operating Report
L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions16 September 2021Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment RevisionsSafe Shutdown
FLEX
L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)24 June 2021Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)Boric Acid
Aging Management
License Renewal
Subsequent License Renewal
Unidentified leakage
IR 05000250/202001123 July 2020NRC Inspection Report 05000250-2020011 and 05000251-2020011 and Investigation Report 2-2019-011; and Apparent Violation FinalSignificance Determination Process
L-2020-073, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping13 April 2020Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return PipingUltimate heat sink
Non-Destructive Examination
Past operability
Coatings
Nondestructive Examination
Incorporated by reference
Through-Wall Leak
ML20098F3417 April 2020Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional InformationDownpower
L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification25 November 2019Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - NotificationHydrostatic
Moisture barrier
Biofouling
L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report6 August 201910 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds19 March 2019Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic WeldsNondestructive Examination
Dissimilar Metal Weld
L-2019-054, Baffle-Former Bolts Predictive Evaluations13 March 2019Baffle-Former Bolts Predictive EvaluationsFinite Element Analysis
Aging Management
ML19072A1625 March 2019National Park Service, Southeast Regional Office, Comments Dated March 5, 2019, on Turkey Point Nuclear Generating Units 3 and 4 Preliminary Draft SEIS Regarding Subsequent License RenewalUltimate heat sink
ML18353A83531 December 2018Biological Assessment for the Turkey Point Units 3 and 4 Proposed Subsequent License RenewalUltimate heat sink
License Renewal
Subsequent License Renewal
Power Uprate
ML18299A11615 October 2018Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License RenewalNon-Destructive Examination
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Aging Management
License Renewal
Subsequent License Renewal
Power Uprate
L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines12 October 2018Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal LinesSafe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Through-Wall Leak
ML18299A11812 October 2018Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018Through-Wall Leak
L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation5 October 2018Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to IrradiationAging Management
Power Uprate
L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review5 October 2018Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review
L-2018-173, Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program21 September 2018Notification of Request for Use and Approval of Polyacrylic Acid Pilot ProgramCoatings
ML18254A34111 September 2018Fish and Wildlife Service'S List of Migratory Birds Near Turkey Point
ML18227B52115 August 2018Submit Attachment a, Annual Hourly Percent Frequency of Vertical and Horizontal Stability Categories by Wind Direction and Wind Speed
ML18227A29015 August 2018Submit Report Contains Official Summary of Startup Physics Tests, Unit 4 Cycle Iii. the Tests Were Conducted in Accordance with Operating Procedure 0204.5, Startup Sequence After RefuelingShutdown Margin
L-2018-098, Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.4618 April 2018Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.46Fuel cladding
L-2018-054, Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/1716 February 2018Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/17Annual Radioactive Effluent Release Report
Process Control Program
L-2017-148, Special Report - Accident Monitoring Instrumentation11 August 2017Special Report - Accident Monitoring InstrumentationGrab sample
L-2017-123, Special Report - Standby Steam Generator Feedwater Pumps Inoperable29 June 2017Special Report - Standby Steam Generator Feedwater Pumps Inoperable
L-2017-124, Flooding Focused Evaluation Summary29 June 2017Flooding Focused Evaluation SummaryHigh winds
Internal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
Earthquake
L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 201617 April 2017Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016Fuel cladding
L-2016-226, NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information20 December 2016NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard InformationHigh winds
Hydrostatic
FLEX
Fukushima Dai-Ichi
Earthquake
L-2016-058, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis23 March 2016Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis
ML16013A47222 January 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term TaskSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
L-2015-313, Special Report - Accident Monitoring Instrumentation18 December 2015Special Report - Accident Monitoring Instrumentation
L-2015-137, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments22 April 2015Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and ExperimentsSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Anticipated operational occurrence
Hydrostatic
Temporary Modification
Missed surveillance
Operability Determination
Exemption Request
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Grace period
Power change
Coast down
Unidentified leakage
Power Uprate
ML15054A03723 February 2015U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Fire PRA Facts and Observations for Turkey Point Nuclear Generating Stations, Units 3 and 4Safe Shutdown
Fire Barrier
Thermoset
ML14338A5544 December 2014NRC-2013- TN2986-NRC 2014 St. LucieFukushima Dai-Ichi
ML14338A5554 December 2014NRC-2013-TN3079-NRC 2014 St. Lucie License RenewalAging Management
License Renewal
L-2014-233, Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I)22 July 2014Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I)
L-2014-085, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident27 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentSafe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake