L-2023-054, Submittal of Periodic Reports

From kanterella
Jump to navigation Jump to search
Submittal of Periodic Reports
ML23102A150
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/12/2023
From: Strand D
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-2023-054
Download: ML23102A150 (1)


Text

L-2023-054 10 CFR 52.3 10 CFR 50.59 10 CFR 52.97(c) 10 CFR 50.46(a)(3) 10 CFR 52 Appendi" D, X.B April 12, 2023 U.S. Nuclear Regulatory Commission Attn: Document Control Desk 11545 Rockville Pike One \v'hite Flint North Rockville, 11D 20852-2746 Turkey Point Units 6 and 7 Docket Nos.52-040 and 52-041 Combined License Nos. NPF-104 and NPF-105 SUBMISSION OF PERIODIC REPORTS

References:

1. FPL Letter L-2022-167 dated October 13, 2022, Submission of Periodic Reports (ADAMS Accession No. ML22286A052)
2. FPL Letter L-2022-074 dated April 13, 2022, Submission of Periodic Reports (ADAMS Accession No. ML22103A033)
3. FPL Letter L-2019-074 dated April 9, 2019, License Conditions 2.D.(11) Schedules - Initial Submittal
4. Westinghouse Electric Company Letter DCP_NRC_003347 dated March 28, 2023 - 10 CFR 50.46 Annual R!'!port for the AP1000Plant Design The purpose of this letter is to submit periodic reports for Turkey Point Units 6 & 7 (PTN 6 & 7) as required by NRC regulations and/ or license conditions as a Part 52 combined license (COL) holder. The following reports are addressed by this letter, updated from the previous reporting period (References 1 and 2):
  • Semi-Annual Departures Report
  • Semi-Annual Changes, Tests, and Experiments Report
  • Semi-Annual Update of the Operational Programs Implementation Schedule
  • Annual 10 CFR 50.46 Report Semi-Annual Departures Report and Semi-Annual Changes, Tests, and Experiments Report - For PTN 6 & 7, in accordance with the requirements of 10 CFR 50.59(d)(2) and 10 CFR 52, Appendix D, paragraphs X.B.1 and X.B.3.b, during the period October 1, 2022 through March 31, 2023:
  • No changes, tests or experiments were implemented pursuant to 10 CFR 50.59(c).

Florida Power & Light Company 9760 SW 344th Street, Homestead, FL 33035

L-2023-054 Page 2 of2 Semi-Annual Update of the Operational Programs Implementation Schedule - Pursuant to the PTN 6

& 7 COLs Section 2.D.(11), the schedule for implementation of operational programs is to be updated every six months. Because there are no changes to FPL's construction decision, the schedule provided in Reference 3 is reaffirmed.

Annual 10 CFR 50.46 Report - The PTN 6 & 7 COLs incorporate by reference AP1000 Design Certification Document (DCD) Revision 19, and thus also the peak fuel cladding temperature calculations performed by Westinghouse Electric Corporation (\v'EC). Accordingly, the \v'EC 2022 Model Year 10 CFR 50.46 annual report for the AP1000 Design Certification Analysis of Record (AOR) applies to PTN 6 & 7 (Reference 4).

As described in the Reference 4 letter, there are no new emergency core cooling system model changes that impact peak cladding temperature (PCT) for the 2022 model year. The estimated PCT for the limiting transient, the Best Estimate Large Break Loss-of-Coolant Accident, remains at 2010°F and does not exceed the 10 CFR 50.46(6)(1) acceptance criterion of 2200°F. The summary of the AP1000 Design Certification AOR PCT margin allocations and their bases is provided in Attachment 1 of the Reference 4 letter.

If you have any questions, or need additional information, please contact Michael Davis, Licensing Projects Manager, at 319-851-7032.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on 12th day of April 2023.

Sincerely, Dianne Strand General Manager, Regulatory Affairs Florida Power & Llght Company cc: USNRC Regional Administrator, Region II USNRC PTN 6 & 7 Project Manager, NRR/DNRL USNRC Senior Resident Inspector, Turkey Point Nuclear Plant