|
---|
Category:Letter type:L
MONTHYEARL-2025-033, Annual Radioactive Effluent Release Report (ARERR) for 2024 and the Offsite Dose Calculation Manual (ODCM) Revision 292025-02-27027 February 2025 Annual Radioactive Effluent Release Report (ARERR) for 2024 and the Offsite Dose Calculation Manual (ODCM) Revision 29 L-2025-031, Inservice Inspection Program Owners Activity Report (OAR-1)2025-02-21021 February 2025 Inservice Inspection Program Owners Activity Report (OAR-1) L-2025-029, Relief Request (RR) 11 and 12, Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fifth Ten-Year Inservice Inspection Program Interval2025-02-21021 February 2025 Relief Request (RR) 11 and 12, Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fifth Ten-Year Inservice Inspection Program Interval L-2025-028, Response to Request for Additional Information License Amendment Request 280, Extend Implementation Date for Amendment No. 291 Regarding Revised Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement2025-02-18018 February 2025 Response to Request for Additional Information License Amendment Request 280, Extend Implementation Date for Amendment No. 291 Regarding Revised Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement L-2025-026, L-2025-026, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2025-02-14014 February 2025 L-2025-026, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2025-025, Response to Requests for Additional Information Regarding Turkey Point Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022025-02-0707 February 2025 Response to Requests for Additional Information Regarding Turkey Point Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2025-019, License Amendment Request 280, Extend Implementation Date for Amendment No. 291 Regarding Revised Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2025-02-0404 February 2025 License Amendment Request 280, Extend Implementation Date for Amendment No. 291 Regarding Revised Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-199, Special Report - Post Accident Monitoring Instrumentation2024-12-10010 December 2024 Special Report - Post Accident Monitoring Instrumentation L-2024-191, Reply to a Notice of Violation: NOV 05000250/2024003 and 05000251/20240032024-11-22022 November 2024 Reply to a Notice of Violation: NOV 05000250/2024003 and 05000251/2024003 L-2024-188, Supplement to License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-11-12012 November 2024 Supplement to License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-187, Supplement to the Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-11-12012 November 2024 Supplement to the Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-044, Revised Steam Generator Tube Inspection Reports2024-03-19019 March 2024 Revised Steam Generator Tube Inspection Reports L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owners Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2025-02-07
[Table view] |
Text
U.S. Nuclear Regulatory Commission Attn: Document Control Desk 11545 Rockville Pike One \\v'hite Flint North Rockville, 11D 20852-2746 Turkey Point Units 6 and 7 Docket Nos.52-040 and 52-041 April 12, 2023 Combined License Nos. NPF-104 and NPF-105 SUBMISSION OF PERIODIC REPORTS
References:
L-2023-054 10 CFR 52.3 10 CFR 50.59 10 CFR 52.97(c) 10 CFR 50.46(a)(3) 10 CFR 52 Appendi" D, X.B
- 1.
FPL Letter L-2022-167 dated October 13, 2022, Submission of Periodic Reports (ADAMS Accession No. ML22286A052)
- 2. FPL Letter L-2022-074 dated April 13, 2022, Submission of Periodic Reports (ADAMS Accession No. ML22103A033)
- 3.
FPL Letter L-2019-074 dated April 9, 2019, License Conditions 2.D.(11) Schedules - Initial Submittal
- 4.
Westinghouse Electric Company Letter DCP _NRC_003347 dated March 28, 2023 - 10 CFR 50.46 Annual R!'!port for the AP1000 Plant Design The purpose of this letter is to submit periodic reports for Turkey Point Units 6 & 7 (PTN 6 & 7) as required by NRC regulations and/ or license conditions as a Part 52 combined license (COL) holder. The following reports are addressed by this letter, updated from the previous reporting period (References 1 and 2):
- Semi-Annual Departures Report
- Semi-Annual Changes, Tests, and Experiments Report
- Semi-Annual Update of the Operational Programs Implementation Schedule
- Annual 10 CFR 50.46 Report Semi-Annual Departures Report and Semi-Annual Changes, Tests, and Experiments Report - For PTN 6 & 7, in accordance with the requirements of 10 CFR 50.59(d)(2) and 10 CFR 52, Appendix D, paragraphs X.B.1 and X.B.3.b, during the period October 1, 2022 through March 31, 2023:
- No changes, tests or experiments were implemented pursuant to 10 CFR 50.59(c).
Florida Power & Light Company 9760 SW 344th Street, Homestead, FL 33035
L-2023-054 Page 2 of2 Semi-Annual Update of the Operational Programs Implementation Schedule - Pursuant to the PTN 6
& 7 COLs Section 2.D.(11), the schedule for implementation of operational programs is to be updated every six months. Because there are no changes to FPL's construction decision, the schedule provided in Reference 3 is reaffirmed.
Annual 10 CFR 50.46 Report - The PTN 6 & 7 COLs incorporate by reference AP1000 Design Certification Document (DCD) Revision 19, and thus also the peak fuel cladding temperature calculations performed by Westinghouse Electric Corporation (\\v'EC). Accordingly, the \\v'EC 2022 Model Year 10 CFR 50.46 annual report for the AP1000 Design Certification Analysis of Record (AOR) applies to PTN 6 & 7 (Reference 4).
As described in the Reference 4 letter, there are no new emergency core cooling system model changes that impact peak cladding temperature (PCT) for the 2022 model year. The estimated PCT for the limiting transient, the Best Estimate Large Break Loss-of-Coolant Accident, remains at 2010°F and does not exceed the 10 CFR 50.46(6)(1) acceptance criterion of 2200°F. The summary of the AP1000 Design Certification AOR PCT margin allocations and their bases is provided in Attachment 1 of the Reference 4 letter.
If you have any questions, or need additional information, please contact Michael Davis, Licensing Projects Manager, at 319-851-7032.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on 12th day of April 2023.
Sincerely, Dianne Strand General Manager, Regulatory Affairs Florida Power & Llght Company cc:
USNRC Regional Administrator, Region II USNRC PTN 6 & 7 Project Manager, NRR/DNRL USNRC Senior Resident Inspector, Turkey Point Nuclear Plant