Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23333A01427 November 2023Attachment F - Groundwater Tek Inc - Peer Review Study Final-1Power Uprate
ML23333A01727 November 2023Attachment I - Chin - the Cooling Canal System at the FPL-Turkey-Point Power Station
ML23265A55122 September 2023Enclosure 3: WCAP-18830-NP, Turkey Point Fuel Storage Criticality Analysis for 24 Month CyclesAging Management
Fuel cladding
Coast down
Power Uprate
L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report30 March 2023Correction to U4R33 Steam Generator Tube Inspection Report
L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis10 February 2023Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / NisCyber Security
Surveillance Frequency Control Program
Time Critical Operator Action
L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report26 October 2022and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)26 August 2022License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)Probabilistic Risk Assessment
Fire Protection Program
L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-00419 August 2022Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Fuel cladding
L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0043 May 2022Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004Anticipated operational occurrence
L-2022-022, Updated Conditions of Certification Report14 February 2022Updated Conditions of Certification ReportEnforcement Discretion
Incorporated by reference
Annual Radiological Environmental Operating Report
L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)24 June 2021Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)Boric Acid
Aging Management
License Renewal
Subsequent License Renewal
Unidentified leakage
L-2020-073, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping13 April 2020Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return PipingUltimate heat sink
Non-Destructive Examination
Past operability
Coatings
Nondestructive Examination
Incorporated by reference
Through-Wall Leak
ML20098F3417 April 2020Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional InformationDownpower
L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds19 March 2019Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic WeldsNondestructive Examination
Dissimilar Metal Weld
L-2019-054, Baffle-Former Bolts Predictive Evaluations13 March 2019Baffle-Former Bolts Predictive EvaluationsFinite Element Analysis
Aging Management
ML19072A1625 March 2019National Park Service, Southeast Regional Office, Comments Dated March 5, 2019, on Turkey Point Nuclear Generating Units 3 and 4 Preliminary Draft SEIS Regarding Subsequent License RenewalUltimate heat sink
ML18353A83531 December 2018Biological Assessment for the Turkey Point Units 3 and 4 Proposed Subsequent License RenewalUltimate heat sink
License Renewal
Subsequent License Renewal
Power Uprate
ML18299A11615 October 2018Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License RenewalNon-Destructive Examination
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Aging Management
License Renewal
Subsequent License Renewal
Power Uprate
L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines12 October 2018Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal LinesSafe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Through-Wall Leak
ML18299A11812 October 2018Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018Through-Wall Leak
L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review5 October 2018Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review
L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation5 October 2018Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to IrradiationAging Management
Power Uprate
ML18227B52115 August 2018Submit Attachment a, Annual Hourly Percent Frequency of Vertical and Horizontal Stability Categories by Wind Direction and Wind Speed
ML18227A29015 August 2018Submit Report Contains Official Summary of Startup Physics Tests, Unit 4 Cycle Iii. the Tests Were Conducted in Accordance with Operating Procedure 0204.5, Startup Sequence After RefuelingShutdown Margin
L-2018-098, Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.4618 April 2018Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.46Fuel cladding
L-2018-054, Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/1716 February 2018Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/17Annual Radioactive Effluent Release Report
Process Control Program
L-2014-085, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident27 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentSafe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
ML14002A1606 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
ML14029A25229 January 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Turkey Point Nuclear Plant, Units 3 and 4, TAC Nos.: MF0982 and MF0983Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
ML13213A1909 July 2013Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 3.Safe Shutdown
Unanalyzed Condition
Boric Acid
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Finite Element Analysis
Fukushima Dai-Ichi
Earthquake
Scaffolding
Weak link
L-2013-198, Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4.9 July 2013Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4.Safe Shutdown
Unanalyzed Condition
Boric Acid
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Finite Element Analysis
Fukushima Dai-Ichi
Earthquake
Scaffolding
Weak link
L-2013-087, Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 2 of 211 March 2013Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 2 of 2Hydrostatic
ML13095A19611 March 2013Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 1 of 2Boric Acid
Ultimate heat sink
Tornado Missile
Hydrostatic
Probabilistic Risk Assessment
Tornado Generated Missile
Fukushima Dai-Ichi
Earthquake
L-2012-417, Flooding Walkdown Report FPL061-PR-001, Rev 0, in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding20 November 2012Flooding Walkdown Report FPL061-PR-001, Rev 0, in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.3: FloodingUnanalyzed Condition
High Radiation Area
Internal Flooding
Aging Management
Fukushima Dai-Ichi
Foreign Material Exclusion
Earthquake
L-2011-190, WCAP-17070-NP, Revision 1, Westinghouse Setpoint Methodology for Protection Systems, Turkey Point, Units 3 & 4 (Power Uprate to 2644 Mwt - Core Power), Attachment 2 to L-2011-19030 June 2011WCAP-17070-NP, Revision 1, Westinghouse Setpoint Methodology for Protection Systems, Turkey Point, Units 3 & 4 (Power Uprate to 2644 Mwt - Core Power), Attachment 2 to L-2011-190
L-2011-032, WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-03228 February 2011WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-032Fuel cladding
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups14 December 2010Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups
ML10356018014 December 2010License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key AcronymsUltimate heat sink
Earthquake
ML10356018314 December 2010License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
License Renewal
Environmental Justice
Power Uprate
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports14 December 2010Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports
ML10356018414 December 2010License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report14 December 2010Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
License Renewal
Environmental Justice
Power Uprate
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments14 December 2010Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory CommitmentsSafe Shutdown
ML10356018214 December 2010License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory CommitmentsSafe Shutdown
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms14 December 2010Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key AcronymsUltimate heat sink
Earthquake
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods14 December 2010Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and MethodsFinite Element Analysis
ML10356017914 December 2010License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and MethodsFinite Element Analysis
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance14 December 2010Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report ComplianceLoop seal
Fuel cladding
Power Uprate
ML10356017814 December 2010License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report ComplianceLoop seal
Fuel cladding
Power Uprate
ML10356017414 December 2010License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis ChangesBoric Acid
Shutdown Margin
Hydrostatic
Fuel cladding