Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)25 January 2024Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)
L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)18 January 2024Inservice Inspection Program Owner'S Activity Report (OAR-1)
L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update15 December 2023Quality Assurance Topical Report (FPL-1) Revision 30 UpdateFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report6 December 2023Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule29 November 2023Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final RuleTime of Discovery
Contraband
Exemption Request
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-065428 November 2023Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654,Health Physics Network
High Radiation Area
Offsite Dose Calculation Manual
Met Tower
Incorporated by reference
FLEX
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Minimum staff
Fire Protection Program
Grace period
Overexposure
L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule16 November 2023Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final RuleContraband
Exemption Request
L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles15 November 2023License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel CyclesSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Loop seal
High Radiation Area
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Coatings
Surveillance Frequency Control Program
Operability Determination
Exemption Request
Subsequent License Renewal
Earthquake
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Grace period
GOTHIC
Unidentified leakage
Accident Tolerant Fuel
Power Uprate
Affidavit
L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis11 October 2023License Amendment Request 277 Updated Spent Fuel Pool Criticality AnalysisSurveillance Frequency Control Program
Power Uprate
L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project25 August 2023Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement ProjectHydrostatic
Probabilistic Risk Assessment
Large early release frequency
Time Critical Operator Action
Fire Protection Program
Coast down
Exclusive Use
Affidavit
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)21 August 2023Inservice Inspection Program Owner'S Activity Report (OAR-1)Boric Acid
L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update17 August 2023Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 27 August 2023and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2Health Physics Network
Cyber Security
FLEX
B.5.b
Severe Accident Management Guideline
Minimum staff
Siren
L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project27 July 2023Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement ProjectInternal Flooding
Hydrostatic
Probabilistic Risk Assessment
Large early release frequency
Earthquake
Fire Protection Program
L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)29 June 2023Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)
L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.28 June 2023Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.
L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2 June 2023Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance UpdateDecommissioning Funding Plan
Authorized possession limits
L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project31 May 2023Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement ProjectMission time
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Large early release frequency
Continuous fire watch
Fire Protection Program
L-2023-072, Preparation and Scheduling of Operator Licensing Examinations22 May 2023Preparation and Scheduling of Operator Licensing Examinations
L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal22 May 2023NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual SubmittalFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2023-061, 2022 Annual Radiological Environmental Operating Report12 May 20232022 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
L-2023-062, Cycle 33 Core Operating Limits Report27 April 2023Cycle 33 Core Operating Limits ReportShutdown Margin
L-2023-060, Radiological Emergency Plan, Revision 7526 April 2023Radiological Emergency Plan, Revision 75
L-2023-054, Submittal of Periodic Reports12 April 2023Submittal of Periodic ReportsFuel cladding
L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report30 March 2023Correction to U4R33 Steam Generator Tube Inspection Report
L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update28 March 2023Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance UpdateDecommissioning Funding Plan
Authorized possession limits
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications27 March 2023and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or ApplicationsFuel cladding
L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-115 March 2023Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1Non-Destructive Examination
Probabilistic Risk Assessment
L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)10 March 2023and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)
L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application3 March 2023Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal ApplicationAnnual Radioactive Effluent Release Report
License Renewal
Subsequent License Renewal
Environmental Justice
L-2023-037, Annual Radioactive Effluent Release Report1 March 2023Annual Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 417 February 2023Radiological Emergency Plan Revision 73 and Revision 7 4
L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis10 February 2023Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / NisCyber Security
Surveillance Frequency Control Program
Time Critical Operator Action
L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results17 January 2023Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors ResultsSafe Shutdown
Time Critical Operator Action
Exclusive Use
Affidavit
L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 29 December 2022Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2
L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 51 December 2022Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5
L-2022-182, Emergency Response Data System (Eros) Changes17 November 2022Emergency Response Data System (Eros) Changes
L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums9 November 2022CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report26 October 2022and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
L-2022-171, 10 CFR 50.59(d)(2) Summary Report20 October 202210 CFR 50.59(d)(2) Summary ReportTemporary Modification
L-2022-167, Submittal of Periodic Reports13 October 2022Submittal of Periodic Reports
L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement5 October 2022Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System ReplacementCommercial Grade Dedication
L-2022-149, U4R33 Steam Generator Tube Inspection Report4 October 2022U4R33 Steam Generator Tube Inspection Report
L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 24 October 2022Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2
L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication16 September 2022Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade DedicationCommercial Grade Dedication
L-2022-151, Evacuation Time Estimate Study15 September 2022Evacuation Time Estimate StudyPandemic
Coronavirus
L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-00419 August 2022Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Fuel cladding
L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report12 August 2022Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report
L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)27 June 2022Inservice Inspection Program - Owner'S Activity Report (OAR-1)Moisture barrier
L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 29 June 2022Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2Offsite Dose Calculation Manual
Zebra Mussel
Aging Management
Fukushima Dai-Ichi
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
License Renewal
Subsequent License Renewal
COVID-19
Biofouling
Power Uprate