MONTHYEARML23333A0142023-11-27027 November 2023 Attachment F - Groundwater Tek Inc - Peer Review Study Final-1 ML23333A0172023-11-27027 November 2023 Attachment I - Chin - the Cooling Canal System at the FPL-Turkey-Point Power Station ML24012A0422023-11-16016 November 2023 FAQ 23-03 Turkey Point IE01 Proposed NRC Response L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update ML23265A5512023-09-22022 September 2023 Enclosure 3: WCAP-18830-NP, Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)2022-08-26026 August 2022 License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 ML22227A0532022-08-15015 August 2022 Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant L-2022-038, Emergency Response Data System (Eros) Changes2022-05-17017 May 2022 Emergency Response Data System (Eros) Changes L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-05-0303 May 2022 Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 ML22124A0112022-04-30030 April 2022 Scoping Summary Report - Final L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-022, Updated Conditions of Certification Report2022-02-14014 February 2022 Updated Conditions of Certification Report L-2022-015, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAI2022-01-14014 January 2022 Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAI L-2022-011, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld2022-01-12012 January 2022 Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout L-2021-178, Report of 10 CFR 50.59 Plant Changes2021-11-0808 November 2021 Report of 10 CFR 50.59 Plant Changes L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions2021-09-16016 September 2021 Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)2021-06-24024 June 2021 Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds) IR 05000250/20200112020-07-23023 July 2020 NRC Inspection Report 05000250-2020011 and 05000251-2020011 and Investigation Report 2-2019-011; and Apparent Violation Final L-2020-073, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping2020-04-13013 April 2020 Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping ML20098F3412020-04-0707 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification2019-11-25025 November 2019 Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification ML19252A4002019-09-0909 September 2019 FPL to NRC, Notification of Smalltooth Sawfish Capture at St. Lucie L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2019-08-0606 August 2019 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds L-2019-054, Baffle-Former Bolts Predictive Evaluations2019-03-13013 March 2019 Baffle-Former Bolts Predictive Evaluations ML19072A1622019-03-0505 March 2019 National Park Service, Southeast Regional Office, Comments Dated March 5, 2019, on Turkey Point Nuclear Generating Units 3 and 4 Preliminary Draft SEIS Regarding Subsequent License Renewal ML18353A8352018-12-31031 December 2018 Biological Assessment for the Turkey Point Units 3 and 4 Proposed Subsequent License Renewal ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines2018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines ML18299A1182018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018 L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review2018-10-0505 October 2018 Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation2018-10-0505 October 2018 Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation L-2018-173, Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program2018-09-21021 September 2018 Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program ML18254A3412018-09-11011 September 2018 Fish and Wildlife Service'S List of Migratory Birds Near Turkey Point ML18227A2902018-08-15015 August 2018 Submit Report Contains Official Summary of Startup Physics Tests, Unit 4 Cycle Iii. the Tests Were Conducted in Accordance with Operating Procedure 0204.5, Startup Sequence After Refueling ML18227B5212018-08-15015 August 2018 Submit Attachment a, Annual Hourly Percent Frequency of Vertical and Horizontal Stability Categories by Wind Direction and Wind Speed L-2018-098, Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.462018-04-18018 April 2018 Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.46 ML18096B3952018-04-0606 April 2018 Exhibit III Estimate of Construction Costs and Exhibit IV Technical Qualifications of Contractors ML18088B1952018-03-29029 March 2018 Hutchinson Island Plant Units 1 and 2 - Chapter 9, Auxiliary Systems and Chapter 10, Steam and Power Conversion System ML18088A0942018-03-29029 March 2018 Unit II Plants ECCS Performance Results 2023-09-28
[Table view] Category:Miscellaneous
MONTHYEARML24012A0422023-11-16016 November 2023 FAQ 23-03 Turkey Point IE01 Proposed NRC Response L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report ML22227A0532022-08-15015 August 2022 Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant L-2022-038, Emergency Response Data System (Eros) Changes2022-05-17017 May 2022 Emergency Response Data System (Eros) Changes ML22124A0112022-04-30030 April 2022 Scoping Summary Report - Final ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout L-2021-178, Report of 10 CFR 50.59 Plant Changes2021-11-0808 November 2021 Report of 10 CFR 50.59 Plant Changes L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions2021-09-16016 September 2021 Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification2019-11-25025 November 2019 Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification ML19252A4002019-09-0909 September 2019 FPL to NRC, Notification of Smalltooth Sawfish Capture at St. Lucie L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2019-08-0606 August 2019 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2018-173, Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program2018-09-21021 September 2018 Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program L-2017-173, Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event2017-09-28028 September 2017 Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event L-2017-148, Special Report - Accident Monitoring Instrumentation2017-08-11011 August 2017 Special Report - Accident Monitoring Instrumentation L-2017-124, Flooding Focused Evaluation Summary2017-06-29029 June 2017 Flooding Focused Evaluation Summary L-2017-123, Special Report - Standby Steam Generator Feedwater Pumps Inoperable2017-06-29029 June 2017 Special Report - Standby Steam Generator Feedwater Pumps Inoperable L-2017-117, Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-12017-06-20020 June 2017 Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1 L-2016-226, NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information2016-12-20020 December 2016 NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information L-2016-058, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis2016-03-23023 March 2016 Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis ML16013A4722016-01-22022 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task ML15352A0532016-01-0707 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights L-2015-313, Special Report - Accident Monitoring Instrumentation2015-12-18018 December 2015 Special Report - Accident Monitoring Instrumentation L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan2015-12-10010 December 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan ML15314A1602015-10-29029 October 2015 St. Lucie, Units 1 and 2 - License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program L-2015-221, Report of 10 CFR 50.59 Plant Changes2015-10-16016 October 2015 Report of 10 CFR 50.59 Plant Changes ML15240A1542015-09-0808 September 2015 Staff Observations of Sump Strainer Head Loss Testing at Alden Laboratory for Generic Safety Issue 191 L-2015-143, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-05-14014 May 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events L-2015-137, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2015-04-22022 April 2015 Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments ML15083A2642015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report L-2015-048, St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report2015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report ML15054A0372015-02-23023 February 2015 U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Fire PRA Facts and Observations for Turkey Point Nuclear Generating Stations, Units 3 and 4 ML14338A5552014-12-0404 December 2014 NRC-2013-TN3079-NRC 2014 St. Lucie License Renewal ML14338A5542014-12-0404 December 2014 NRC-2013- TN2986-NRC 2014 St. Lucie L-2014-233, Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I)2014-07-22022 July 2014 Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I) L-2014-125, Report of 10 CFR 50.59 Plant Changes2014-05-0606 May 2014 Report of 10 CFR 50.59 Plant Changes ML13360A2022013-12-12012 December 2013 EPA Echo Report Martin County, Fl L-2013-246, Steam Generator Tube Inspection Report2013-09-19019 September 2013 Steam Generator Tube Inspection Report L-2013-258, 10 CFR 71.95 - Cask 8-120B - 60 Day Report2013-09-16016 September 2013 10 CFR 71.95 - Cask 8-120B - 60 Day Report L-2013-237, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report2013-08-20020 August 2013 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report L-2013-193, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Acceptance Review Clarification Response2013-06-14014 June 2013 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Acceptance Review Clarification Response L-2013-175, Report of 10 CFR 50.59 Plant Changes2013-05-23023 May 2013 Report of 10 CFR 50.59 Plant Changes L-2013-140, Special Report - Accident Monitoring Instrumentation2013-04-19019 April 2013 Special Report - Accident Monitoring Instrumentation L-2012-437, Standardization of Senior Reactor Operator Fuel Handling Duties2012-12-27027 December 2012 Standardization of Senior Reactor Operator Fuel Handling Duties ML12234A7512012-08-28028 August 2012 Closeout of Review of the One-Time Inspection of Class 1 Small Bore Piping Program Revised Commitment and Inspection Plan L-2012-105, Response to Nuclear Performance and Code Review Branch Request for Additional Information Identified During an Audit of Analyses Supporting the Extended Power Uprate License Amendment Request2012-03-15015 March 2012 Response to Nuclear Performance and Code Review Branch Request for Additional Information Identified During an Audit of Analyses Supporting the Extended Power Uprate License Amendment Request L-2012-090, Special Report - Containment Tendon Corrosion Protection Medium Volume Reduction2012-03-0505 March 2012 Special Report - Containment Tendon Corrosion Protection Medium Volume Reduction 2023-09-28
[Table view] |
Text
NRC: St. Lucie, Units 1 & 2 - License Renewal Application http://www.nrc.gov/reactors/operating/licensing/renewal/applica...
Home > Nuclear Reactors > Operating Reactors > Licensing > Renewal > Applications > St. Lucie St. Lucie, Units 1 & 2 - License Renewal Application Renewed License Issued 10/02/2003 On this page:
Application Information License Renewal Review Schedule Public Involvement Environnmental Impact Statement Safety Evaluation Report Project Managers for St. Lucie, Units 1 & 2 Application Information:
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
License Renewal Application Applicant's Environmental Report Environmental Report Appendix A - B Environmental Report Appendix C - F License Renewal Review Schedule*
- These schedules reflect work plans that are subject to change. Early completion of a milestone may 1 of 5 2/4/14 2:15 PM
NRC: St. Lucie, Units 1 & 2 - License Renewal Application http://www.nrc.gov/reactors/operating/licensing/renewal/applica...
affect the target date of future milestones. Subsequent meetings and comment periods may change based on the revised schedule. This work plan will be updated on a periodic basis. Please see the NRC Public Meetings Page or contact the listed PM for the latest information on meetings and status.
Milestones Schedule DateActual Date Receive License Renewal Application 11/30/01 11/30/01 FRN Published for Receipt & Acceptability 12/28/01 12/27/01 FRN Published for Acceptance/Rejection/ Opportunity for Hearing of LRA01/29/02 01/29/02 Deadline for Filing Hearing Requests and Petitions for Intervention 02/28/02 02/28/02 FRN Published for Intent/Environmental Scoping Mtg 03/01/02 02/28/02 Environmental Scoping Mtg 04/03/02 04/03/02 Environmental Scoping Period Ends 05/06/02 05/06/02 Environmental RAIs Issued 05/20/02 05/07/02 Scoping and Screening Methodology Audit Complete 06/04/02 04/18/02 Environmental RAI Responses Received 07/19/02 06/25/02 Safety RAIs Issued 07/29/02 07/29/02 Safety RAI Responses Received 10/11/02 10/11/02 Scoping Inspection Complete 10/25/02 10/25/02 Draft Supplemental Environmental Impact Statement Issued 11/01/02 11/01/02 FRN Published for Availability/Comment on Draft SEIS 11/01/02 11/01/02 Public Mtg to Discuss Draft SEIS 12/03/02 11/03/02 End of Draft SEIS Comment Period 01/15/03 01/15/03 Aging Management Review Inspection Complete 02/07/03 01/31/03 SER with Open Items Issued 02/07/03 02/07/03 ACRS Subcommittee Mtg on SER with Open Items 04/09/03 04/09/03 SER Open Item Responses Received 04/24/03 03/28/03 Final SEIS Issued 06/30/03 05/19/03 FRN Published for Availability of Final SEIS 06/30/03 05/19/03 SER Issued 07/08/03 07/07/03 Regional Administrator's Letter Issued 07/21/03 06/04/03 ACRS Full Committee on SER 09/11/03 09/11/03 ACRS Letter Issued 09/03 09/17/03 Staff Recommendation to Director, NRR 9/26/03 09/26/03 Decision - Director, NRR (license issued, if approved) 10/03/03 10/02/03 Public Involvement The public is encouraged to participate in the reactor license renewal rocess through public meetings, and public comment periods on rules, renewal guidance, and other documents. The Reactor License Renewal Public Involvement page provides general information to help the public participate. The table below outlines the public involvement for the review process for St. Lucie, Units 1 & 2.
Date Description 09/11/03 Advisory Full-Committee on Reactor Safeguards Meeting to discuss Plant License Renewal (St. Lucie, Units 1 and 2).
Agenda 2 of 5 2/4/14 2:15 PM
NRC: St. Lucie, Units 1 & 2 - License Renewal Application http://www.nrc.gov/reactors/operating/licensing/renewal/applica...
Transcript 05/21/03 Meeting with FPL to discuss issues related to the safety evaluation report with open itmes concerning St. Lucie, Units 1 and 2, license renewal application.
Notice Meeting Summary 04/09/03 Advisory Sub-Committee on Reactor Safeguards Meeting to discuss Plant License Renewal (St. Lucie 1 & 2).
Transcript 03/05/03 Meeting with FPL to discuss issues related to the Safety Evaluation Report (SER) with open items for the St. Lucie Plant, Units 1 and 2, License Renewal Notice Meeting Summary Enclosure 01/31/03 Meeting with FPL topresent the results of the NRC's second regional inspection (Aging Management Review) of the company's license renewal program.
Notice Inspection Report Meeting with FPL to discuss the Draft Environmental Impact Statement (EIS) for the St.
Lucie Plant, Units 1 and 2, License Renewal Notice Meeting Slides 12/03/02 Meeting Summary Transcripts Afternoon Session Evening Session 11/06/02 Meeting with FPL to discuss the applicant's responses to the NRC staff's requests for 11/07/02 additional information concerning St. Lucie, Units 1 and 2, License Renewal Application.
Notice Meeting Summary 10/25/02 Meeting with FPL to discuss the results on the NRC's first regional inspecion (Scoping and Screening) of the company's linese renewal program.
Notice Inspection Report 09/04/02 Meeting with Florida Power & Light (FPL) to discuss responses to request for additional 09/05/02 information concerning St. Lucie, Units 1 and 2, License Renewal Application.
Notice Meeting Summary*
3 of 5 2/4/14 2:15 PM
NRC: St. Lucie, Units 1 & 2 - License Renewal Application http://www.nrc.gov/reactors/operating/licensing/renewal/applica...
- All enclosures to this summary can be found by using the document accession number ML022760480 to locate them in NRC's on-line document retrieval system, ADAMS.
08/15/02 Meeting with Florida Power & Light (FPL) to discuss responses to request for additional information concerning St. Lucie, Units 1 and 2, License Renewal Application.
Notice Meeting Summary*
- All enclosures to this summary can be found by using the document accession number ML022760480 to locate them in NRC's on-line document retrieval system, ADAMS.
06/10/02 Meeting with Florida Power & Light (FPL) to discuss proposed draft requests for additional 06/11/02 information concerning St. Lucie, Units 1 and 2, License Renewal Application.
Notice Meeting Summary 05/15/02 Meeting with Florida Power & Light (FPL) to discuss proposed draft requests for additional 05/16/02 information concerning St. Lucie, Units 1 and 2, License Renewal Application.
Notice Meeting Summary 04/18/02 Meeting with Florida Power & Light (FPL) to discuss the results of the NRC's initial inspection (Scoping Methodology) of the company's license renewal program at St. Lucie.
Notice Meeting Summary 04/03/02 Meeting to discuss the Environmental Scoping Process for the St. Lucie Nuclear Plant, Units 1 and 2, License Renewal Application.
Notice Meeting Slides Meeting Statements Meeting Summary Transcripts Afternoon Session Evening Session 01/06/02 Meeting with Florida Power & Light (FPL) to provide the Nuclear Regulatory Commission (NRC) staff with an overview of the St. Lucie Nuclear Plant, Units 1 and 2, License Renewal Application.
Notice Meeting Slides Meeting Summary Environmental Impact Statement 4 of 5 2/4/14 2:15 PM
NRC: St. Lucie, Units 1 & 2 - License Renewal Application http://www.nrc.gov/reactors/operating/licensing/renewal/applica...
NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants,"
Supplement 11, Regarding St. Lucie, Units 1 & 2, was published May 2003.
This supplement documents the NRC staff's review of the environmental issues at St. Lucie, Units 1 & 2 in support of Florida Power and Light Company's application for license renewal of that facility. The supplement was prepared in accordance with 10 CFR 51.71. This supplemental environmental impact statement includes the staff's analysis that considers and weighs the environmental effects of the proposed action, the environmental impacts of alternatives to the proposed action, and alternatives available for reducing or avoiding adverse impacts. It also includes the staff's recommendation regarding the proposed actions.
Safety Evaluation Report The NRC staff reviewed the St. Lucie license renewal application for compliance with the requirements of Title 10 of the Code of Federal Regulations, Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants," and prepared this report to document its findings. The document was first issued in February 2003, as "Safety Evaluation Report with Open Items Related to the License Renewal of St. Lucie Nuclear Plant, Units 1 & 2." The report is available in ADAMS under accession number ML030410192. On March 11, 2003, an errata was issued to the License Renewal Safety Evaluation Report with Open Items for St. Lucie 1 and 2. The errata is available in ADAMS under accession number ML030710193.
In July 2003, the report "NUREG-1779, "Safety Evaluation Report Related to the License Renewal of St. Lucie Nuclear Plant, Units 1 & 2," was issued. The report is also available in ADAMS under accession number ML031890043.
Project Managers for St. Lucie, Units 1 & 2 St. Lucie Noel Dudley License Renewal Tilda Liu Lead Power PlantBrendan Moroney Environmental Micheal Masnik Page Last Reviewed/Updated Monday, April 29, 2013 5 of 5 2/4/14 2:15 PM