L-2023-060, Radiological Emergency Plan, Revision 75

From kanterella
Jump to navigation Jump to search
Radiological Emergency Plan, Revision 75
ML23116A198
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/26/2023
From: Strand D
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-2023-060
Download: ML23116A198 (1)


Text

April 26, 2023 L-2023-060 10 CFR 50.4 10 CFR 50 Appendix E U.S. Nuclear Regulatory Commission Attn : Document Control Desk Washington, D. C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Radiological Emergency Plan Revision 75 The Turkey Point Plant Radiological Emergency Plan, Revision 75 was implemented on April 7, 2023.

A summary of the changes to the revised document is attached. FPL has determined that the changes described do not result in a decrease in the effectiveness of the Emergency Plan.

This letter contains no NRC commitments. If you have any questions, please contact Kenneth Mack at 561-904-3635.

Sincerely, 1)~

Dianne Strand s tz General Manager, Regulatory Affairs Florida Power & Light Company Attachment cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Resident Inspector, Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344 St Homestead, FL 33035

Attachment L-2023-060 Page 1 of 1 Summary of Changes to Turkey Point Plant Radiological Emergency Plan, Revision 75

Reference:

AR-PCR 02450670 The Emergency Plan revision consists of the following:

  • Replaced EMNet with Satellite Communications
  • Upgraded Hot Ring Down telephone to Voice Over Internet with Satellite back-up
  • Replaced the use of pagers with cellular telephones for notifying ERO responders