Enclosure 1 to L-2018-082, Subsequent License Renewal Application, Enclosure Summary
ML18113A141
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/10/2018
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18113A132 List:
References
L-2018-082
Download: ML18113A141 (4)


Text

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251

L-2018-082 Enclosure 1 Enclosure 1 Turkey Point Subsequent License Renewal Application Enclosure Summary (4 Total Pages)

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251

L-2018-082 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary Enclosure 2 - Applications for Withholding Pr oprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 - CAW-17-4686 Affidavit for Westinghouse CUFs in SLR Tables (Enclosure 5 Attachment 1- SLRA Section 4, Attachment 4, & )

- CAW-17-4675 Affidavit for Westinghouse EAF Calculations (Enclosure 5 Attachment 1- SLRA Section 4 & Attachment 7)

- CAW-17-4621 Affidavit for Westinghouse LBB (Enclosure 5 - SLRA Section 4 & Attachment 9)

- EPRI Affidavit for MRP 2017-038 (Enclosure 5 Attachment 1 -

SLRA Appendix C & Attachment 11)

- Areva Affidavit for Topical Reports i. ANP-3646P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & ) ii. ANP-3647P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & )

- Framatome Affidavit for RT PTS , USE, ART and CUF Values in SLRA Tables (Enclosure 5 Attachment 1 - SLRA Section 4, Attachment 4, & Attachment 5)

- Areva Affidavit for EAF Calculations (Enclosure 5 Attachment 1 - SLRA Section 4 & Attachment 8)

- CAW-17-4674 Affidavit fo r PWROG 17033-P Update for Subsequent License Renewal: WCAP-13045, Compliance to ASME Code Case N-481 of the Primary Loop Pump Casings of Westinghouse Type Nuclear Steam Supply Systems dated October 2017 (Enclosure 5 0)

- CAW-17-4683 Affidavit for Westinghouse Data Package for Pressurizer Spray and Surge Nozzle Analysis (Enclosure 5 Attachment 1 -

SLRA Section 4 & Attachment 6)

- Turkey Point Nuclear Plant Unit s 3 and 4 Subsequent License Renewal Application, Revision 1 (Public Version) - Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)

a. Attachment 1

- Westinghouse Letter No. LTR-REA-17-116-NP, Revision 0, Reactor Vessel Neutron Exposure Data

b. Attachment 2

- Areva Topical Report ANP-3646NP Revision 0

c. Attachment 3

- ArevaTopical Report ANP-3647NP Revision 0

d. Attachment 4

- SIA Report No. 1700109.402P, Revision 4 - REDACTED

e. Attachment 5

- SIA Report No. 1700109.401P, Revision 5 - REDACTED Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251

L-2018-082 Enclosure 1

f. Attachment 6 - SIA Environmentally Assisted Fatigue Calculations i. Pressurizer Lower Head - 1700804.316P Revision 0 - REDACTED, 1700804.317 Revision 0, and 1700804.318 Revision 0, ii. Pressurizer Spray Nozzle - 1700804.313P Revision 2 - REDACTED, 1700804.314P Revision 1 - REDACTED, and 1700804.315P Revision 2 - REDACTED
g. Attachment 7 - Westinghouse Environmentally Assisted Fatigue Calculations i. LTR-SDA-II-17-13-NP, Rev. 2, Pressurizer Upper Head, RV Core Support Blocks ii. LTR-CECO-17-025-NP, Rev. 1, Replacement Steam Generators
h. Attachment 8

- Areva Environmentally Assisted Fatigue Calculations: Areva Letter No. AREVA-17-02742, dated December 6, 2017, Final CUF EN Results - Turkey Point 3 & 4 - SLR EAF Analyses i. 32-9280707, Rev. 0, CRDM Nozzle to Adapter Weld Connection ii. 32-9280708, Rev. 0, R eplacement RVCH J Groove iii. 32-9280709, Rev. 0, CRDM Latch Housing iv. 32-9280710, Rev.

0, Vent Nozzle v. 32-9280711, Rev. 0, Reactor Vessel Flange vi. 32-9280712, Rev. 0, CRDM Lower Joint

i. Attachment 9

- PWROG-17031-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-15338-A j. Attachment 10

- PWROG-17011-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-14535A and WCAP-15666-A

k. Attachment 11 - WCAP-15354-NP, Rev. 1, Te chnical Justification for Eliminating Primary Loop Pipe Rupture as the Stru ctural Design Basis
l. Attachment 12 - SIA Leak-Before-Break Eval uation for Auxiliary Lines 0901350-401 Rev. 3 and 0901350-304 Rev. 2
m. Attachment 13

- PWROG-17033-NP, Rev. 0, Update for Subsequent License Renewal: WCAP-13045

- 10 CFR 2.390 Withheld Proprietary Documents

a. Attachment 1

- Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application, Revision 1 (Non-Public Version)

b. Attachment 2 - Areva Topical Report ANP-3646P Revision 0
c. Attachment 3 - Areva Topical Report ANP-3647P Revision 0
d. Attachment 4 - SIA Report No. 1700109.402P Revision 4
e. Attachment 5 - SIA Report No. 1700109.401P Revision 5
f. Attachment 6 - SIA EAF Calculations i. Pressurizer Lower Head - SIA Calculation No. 1700804.316P Revision 0.

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251

L-2018-082 Enclosure 1 ii. Pressurizer Spray Nozzle - SI A Calculation No

s. 1700804.313P Revision 2, 1700804.314P Revision 1, and 1700804.315P Revision 2
g. Attachment 7 - Westinghouse EAF Calculations i. Pressurizer Upper Head, RV Core Support Blocks - LTR-SDA-II 13-P, Revision 2 ii. Steam Generators LTR-CE CO-17-025-P, Revision 1
h. Attachment 8 - Areva EAF Calculations (6) i. CRDM Nozzle to Adapter Weld Connection - Areva Calculation No.

32-9279174, Revision 1, 12/14/17 ii. CRDM Nozzle J-Groove Weld - Areva Calculation No. 32-9279212, Revision 1, 12/12/17 iii. CRDM Latch Housing - Areva Calc ulation No. 32-9279367, Revision 1, 12/15/17 iv. CRDM Vent Nozzle - Areva Calculation No. 32-9279362, Revision 1, 12/14/17 v. CRDM Vessel Flange - Areva Calculation No. 32-9279161, Revision 1, 12/14/17 vi. CRDM Lower Joint - Areva Calculation No. 32-9280202, Revision 1, 12/15/17 i. Attachment 9 - WCAP-15354-P, Revision 1, Westinghouse LBB Analysis

- Proprietary j. Attachment 10

- PWROG-17033-P, Revision 0 - RCP Code Case N-481

- Proprietary

k. Attachment 11 - MRP 2017-038