Letter Sequence RAI |
|---|
EPID:L-2018-RNW-0002, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Administration
- Withholding Request
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses, L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses, L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items, L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation, L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses, ML17338A134, ML17338A139, ML17360A054, ML18003A047, ML18037A824, ML18037A828, ML18037A829, ML18074A252, ML18080A175, ML18081A239, ML18081A257, ML18081A270, ML18081A278, ML18086A705, ML18087A433, ML18113A142, ML18160A012, ML18173A087, ML18183A445, ML18214A171, ML18230B482, ML18232A576, ML18299A114, ML18341A024, ML19032A536, ML19050A400, ML19162A072, ML19162A097, ML19162A117, ML19162A343, ML19200A070, ML19326C114, ML22073A122
|
MONTHYEARML19326C1141972-07-19019 July 1972 SLR Tech Specs from Authority File Project stage: Other L-2017-097, Request for Withholding Information from Public Disclosure Re Subsequent License Renewal Notification2017-05-17017 May 2017 Request for Withholding Information from Public Disclosure Re Subsequent License Renewal Notification Project stage: Withholding Request ML18080A1642017-05-25025 May 2017 U.S. Nuclear Regulatory Commission Approval of Florida Power & Light Company Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18081A2862017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Scoping and Screening Methodology Project stage: Meeting ML18080A1782017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Neutron Fluence Calculations Project stage: Meeting ML18080A1702017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant -Environmental Topics and SAMA Project stage: Meeting ML18080A1662017-08-23023 August 2017 Notice of Forthcoming Closed Meeting to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Reactor Vessel Internals Project stage: Meeting ML18080A1722017-09-0505 September 2017 Official Use Only - Proprietary Information - Unnamed Plant Meeting Prep for Environmental Pre-Application Call - Resent to Include an Additional Topic Project stage: Meeting ML18081A2342017-10-23023 October 2017 Notice of Teleconference to Discuss Pre-Application Activities for the Anticipated Submittal of a Subsequent License Renewal Application for an Unnamed Plant - Reactor Vessel Internals, Neutron Fluence, and Environmentally Assisted Fatigue Project stage: Meeting ML18081A2572017-11-0101 November 2017 Notice of Forthcoming Closed Telecon to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - GALL SLR Requirements for Assessment of Concrete Degradation Project stage: Other ML18081A2702017-11-17017 November 2017 Notice of Closed Telecon to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - GALL SLR Requirements for Cable and Electrical Aging Management Programs Project stage: Other ML18080A1682017-12-21021 December 2017 Summary of Pre-Application Meeting Between the NRC and FPL to Discuss AMP XI.M16A, PWR Vessel Internals Associated with the Turkey Point Units 3 and 4, Subsequent License Renewal Application Project stage: Meeting ML18081A0252017-12-28028 December 2017 September 11, 2017, Summary of Pre-Application Meeting That Was Scheduled to Be Held Between NRC and FPL to Discuss Neutron Fluence Associated with the Turkey Point Subsequent License Renewal Application Project stage: Meeting ML18080A1752018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on September 7, 2017, Between NRC and FPL to Discuss the Environmental Report Associated with the Turkey Point Subsequent License Renewal Application Project stage: Other ML18081A2782018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on November 21, 2017, Between NRC and FPL to Discuss Cable and Electrical Aging Management Programs Associated with the Turkey Point Subsequent License Renewal Application Project stage: Other ML18081A2932018-01-0505 January 2018 Summary of Closed Pre-Application Teleconference Held on September 12, 2017, Between NRC and FPL to Discuss Scoping and Screening Methodology Associated with the Turkey Point Unit Nos. 3 and 4 Subsequent License Renewal Application Project stage: Meeting ML18081A2632018-01-0505 January 2018 Summary of Closed Pre-Application Teleconference Between NRC and FPL to Discuss Concrete Degradation Associated with the Turkey Point Subsequent License Renewal Application Project stage: Meeting ML18081A2392018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on November 6, 2017, Between the NRC and FPL to Discuss MRP-227, Reactor Vessel Internals, and Environmentally Assisted Fatigue Associated with the Turkey Point Subsequent License Renewal Appli Project stage: Other L-2018-004, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)2018-01-30030 January 2018 Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) Project stage: Request ML18037A8122018-01-30030 January 2018, 31 January 2018 Submittal of Subsequent License Renewal Application Project stage: Request ML18037A8292018-01-30030 January 2018 Enclosure 2 - Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 Project stage: Other ML18037A8282018-01-30030 January 2018 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary Project stage: Other ML18037A8242018-01-30030 January 2018 Submittal of Subsequent License Renewal Application Project stage: Other ML18113A1322018-01-31031 January 2018, 10 April 2018, 30 April 2018 Transmittal of Subsequent License Renewal Application Revision 1 Project stage: Request L-2018-039, License Renewal Application - Supplement 12018-02-0909 February 2018 License Renewal Application - Supplement 1 Project stage: Supplement ML18053A1372018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Supplement L-2018-053, Replacement Pages to Enclosure 3, SLRA Section 42018-02-16016 February 2018 Replacement Pages to Enclosure 3, SLRA Section 4 Project stage: Request ML18053A1232018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Request ML18038A6912018-04-0303 April 2018 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18113A1422018-04-10010 April 2018 Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) Project stage: Other ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application Project stage: Other ML17338A1342018-04-13013 April 2018 Receipt and Availability of the Subsequent License Renewal Application for the Turkey Point Nuclear Generating Units 3 and 4 Project stage: Other ML17338A1392018-04-13013 April 2018 FRN for Receipt and Availability of the Subsequent License Renewal Application for the Turkey Point Nuclear Generating Units 3 and 4 Project stage: Other ML18087A4332018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Other ML18087A4742018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Request ML17360A0542018-04-25025 April 2018 Subsequent License Renewal Application Online Reference Portal Project stage: Other ML18003A0482018-04-26026 April 2018 Federal Register Notice (FRN) for Opportunity to Request a Hearing and to Petition for Leave to Intervene in the Review of FPLs Turkey Point Subsequent License Renewal Application Project stage: Approval ML18003A0472018-04-26026 April 2018 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from FPL for Subsequent Renewal of the Turkey Point Units 3 and 4 Project stage: Other ML18086A7052018-04-26026 April 2018 Plan for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18149A5702018-05-29029 May 2018 Draft RAI B.2.3.16 1, Fire Protection System Enhancements, for Turkey Point SLRA, for Public Teleconference on June 13, 2018 Project stage: Draft RAI ML18150A2552018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - Spanish Project stage: Meeting ML18150A2402018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - English Project stage: Meeting ML18160A0122018-06-12012 June 2018 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18173A0872018-07-0505 July 2018 Plan for the Irradiated Concrete Technical Issue Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18183A4452018-07-23023 July 2018 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18214A1712018-08-0101 August 2018 Subsequent License Renewal Application Project stage: Other ML18218A2002018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18218A1992018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - E-mail Project stage: RAI ML18218A1982018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 Project stage: Request ML18232A5142018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 Project stage: RAI 2018-02-09
[Table View] |
Text
TURKEY POINT NUCLEAR GENERATING UNITS 3 AND 4 (TURKEY POINT)
SUBSEQUENT LICENSE RENEWAL APPLICATION (SLRA)
REQUESTS FOR ADDITIONAL INFORMATION (RAIS)
SAFETY - SET 10
- 1. Buried and Underground Piping and Tanks, GALL AMP XI.M41 RAI B.2.3.28-1b Regulatory Basis:
Section 54.21(a)(3) of Title 10 of the Code of Federal Regulatiions (10 CFR) requires an applicant to demonstrate that the effects of aging for structures and components will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis for the subsequent period of extended operation. One of the findings that the staff must make to issue a renewed license (10 CFR 54.29(a)) is that actions have been identified and have been or will be taken with respect to managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21, such that there is reasonable assurance that the activities authorized by the renewed license will continue to be conducted in accordance with the current licensing basis (CLB). As described in SRP-SLR, an applicant may demonstrate compliance with 10 CFR 54.21(a)(3) by referencing the NUREG-2191, Rev. 0, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, dated July 2017. In order to complete its review and enable making a finding under 10 CFR 54.29(a),
the staff requires additional information in regard to the matters described below.
Background:
By letter dated February 6, 2019, (ADAMS Accession No. ML19037A398) the staff issued follow-up RAI B.2.3.28-1a requesting that a basis be provided for why Preventive Action Category F is appropriate for buried steel piping during the 10-year period prior to the subsequent period of extended operation (SPEO). The basis for issuing this RAI was that: (a) operating experience (OE) at Turkey Point has indicated several instances of leaks/significant degradation of buried steel piping; and (b) Preventive Action Category F is limited to instances where plant-specific OE identifies only a few (i.e., as opposed to several) instances of leaks/significant degradation. The staffs assertion that there have been several instances of leaks/significant degradation of buried steel piping due to external corrosion is based on the following:
SLRA Section B.2.3.28, Buried and Underground Piping and Tanks, states:
Turkey Point has experienced a number of pipe leaks and/or breaks in buried piping. Most of these pipe breaks have been in the piping for the fire water and service water systems. These breaks have been documented in the corrective action program (CAP). A review of the documentation in the CAP indicates that typically they have been caused by localized corrosion.
- 2 -
During the audit the staff noted that: (a) several leaks and locations of localized external corrosion have occurred in buried service water and fire water system piping; (b) an action report (AR) from 2008 documents that corrosion of buried carbon steel piping is a known problem at the station; and (c) the Structures Monitoring program basis report documents that groundwater/soil at Turkey Point is aggressive with chlorides greater than 500 parts per million (ppm), which indicates an aggressive groundwater/soil classification.
Follow-up RAI B.2.3.28-1 was responded to by Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses|letter dated March 6, 2019]], (ADAMS Accession No. ML19070A113). Each of the ARs that were cited by the staff in the OE audit report (ADAMS Accession No. ML18183A445) were addressed. For several of the ARs which identified leaks, the response states that the buried piping is not within the scope of subsequent license renewal (SLR) and is therefore not related to the Buried and Underground Piping and Tanks program. The overall conclusion stated in the response was that: (a) there has not been significant degradation and only one minor leak was identified; and (b) no additional inspections beyond those currently planned are required for buried steel piping during the 10-year period prior to the SPEO.
Issue:
The response to follow-up RAI B.2.3.28-1a focused on addressing each of the ARs that were cited by the staff in the OE audit report. The staff has two issues with the response:
- 1. The staff does not agree with the claim that leaks/degradation in out-of-scope buried piping are not relevant to the Buried and Underground Piping and Tanks program.
In-scope piping would be just as susceptible to degradation as out-of-scope piping unless a technical justification is provided for why the two are not representative of each other (e.g., similar material composition, degradation mechanisms, coatings, environmental conditions, age of installation, operational history of cathodic protection if installed). GALL-SLR Report Aging Management Report (AMP) XI.M41 states:
If cathodic protection is not provided for any reason, the applicant reviews the most recent 10 years of plant-specific operating experience (OE) to determine if degraded conditions that would not have met the acceptance criteria of this AMP have occurred. This search includes components that are not in-scope for license renewal if, when compared to in-scope piping, they are similar materials and coating systems and are buried in a similar soil environment.
Although cathodic protection will be installed at least 7 years prior to the SPEO, AMP XI.M41 clearly establishes the purpose of using plant-specific operating experience related to buried components that are not in-scope.
- 2. The response addressed each of the ARs listed in the OE audit report; however, this listing of ARs was not intended to be an exhaustive list documenting all instances of buried piping leaks/degradation at Turkey Point. The staffs review of operating experience spans approximately 10 years, not the entire life of the plant. The staff also notes that corrosion of buried carbon steel piping was known to be an issue in 2008
- 3 -
(approximately 10 years ago). Therefore, there could be examples of buried steel piping leaks/degradation that were not included in the OE audit report.
Request:
State the basis for why additional inspections, beyond those recommend for Preventive Action Category F, are not appropriate for buried steel piping during the 10-year period prior to the SPEO.