Letter Sequence RAI |
|---|
EPID:L-2018-RNW-0002, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Administration
- Withholding Request
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses, L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses, L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items, L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation, L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses, ML17338A134, ML17338A139, ML17360A054, ML18003A047, ML18037A824, ML18037A828, ML18037A829, ML18074A252, ML18080A175, ML18081A239, ML18081A257, ML18081A270, ML18081A278, ML18086A705, ML18087A433, ML18113A142, ML18160A012, ML18173A087, ML18183A445, ML18214A171, ML18230B482, ML18232A576, ML18299A114, ML18341A024, ML19032A536, ML19050A400, ML19162A072, ML19162A097, ML19162A117, ML19162A343, ML19200A070, ML19326C114, ML22073A122
|
MONTHYEARML19326C1141972-07-19019 July 1972 SLR Tech Specs from Authority File Project stage: Other L-2017-097, Request for Withholding Information from Public Disclosure Re Subsequent License Renewal Notification2017-05-17017 May 2017 Request for Withholding Information from Public Disclosure Re Subsequent License Renewal Notification Project stage: Withholding Request ML18080A1642017-05-25025 May 2017 U.S. Nuclear Regulatory Commission Approval of Florida Power & Light Company Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18081A2862017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Scoping and Screening Methodology Project stage: Meeting ML18080A1782017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Neutron Fluence Calculations Project stage: Meeting ML18080A1702017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant -Environmental Topics and SAMA Project stage: Meeting ML18080A1662017-08-23023 August 2017 Notice of Forthcoming Closed Meeting to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Reactor Vessel Internals Project stage: Meeting ML18080A1722017-09-0505 September 2017 Official Use Only - Proprietary Information - Unnamed Plant Meeting Prep for Environmental Pre-Application Call - Resent to Include an Additional Topic Project stage: Meeting ML18081A2342017-10-23023 October 2017 Notice of Teleconference to Discuss Pre-Application Activities for the Anticipated Submittal of a Subsequent License Renewal Application for an Unnamed Plant - Reactor Vessel Internals, Neutron Fluence, and Environmentally Assisted Fatigue Project stage: Meeting ML18081A2572017-11-0101 November 2017 Notice of Forthcoming Closed Telecon to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - GALL SLR Requirements for Assessment of Concrete Degradation Project stage: Other ML18081A2702017-11-17017 November 2017 Notice of Closed Telecon to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - GALL SLR Requirements for Cable and Electrical Aging Management Programs Project stage: Other ML18080A1682017-12-21021 December 2017 Summary of Pre-Application Meeting Between the NRC and FPL to Discuss AMP XI.M16A, PWR Vessel Internals Associated with the Turkey Point Units 3 and 4, Subsequent License Renewal Application Project stage: Meeting ML18081A0252017-12-28028 December 2017 September 11, 2017, Summary of Pre-Application Meeting That Was Scheduled to Be Held Between NRC and FPL to Discuss Neutron Fluence Associated with the Turkey Point Subsequent License Renewal Application Project stage: Meeting ML18080A1752018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on September 7, 2017, Between NRC and FPL to Discuss the Environmental Report Associated with the Turkey Point Subsequent License Renewal Application Project stage: Other ML18081A2782018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on November 21, 2017, Between NRC and FPL to Discuss Cable and Electrical Aging Management Programs Associated with the Turkey Point Subsequent License Renewal Application Project stage: Other ML18081A2932018-01-0505 January 2018 Summary of Closed Pre-Application Teleconference Held on September 12, 2017, Between NRC and FPL to Discuss Scoping and Screening Methodology Associated with the Turkey Point Unit Nos. 3 and 4 Subsequent License Renewal Application Project stage: Meeting ML18081A2632018-01-0505 January 2018 Summary of Closed Pre-Application Teleconference Between NRC and FPL to Discuss Concrete Degradation Associated with the Turkey Point Subsequent License Renewal Application Project stage: Meeting ML18081A2392018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on November 6, 2017, Between the NRC and FPL to Discuss MRP-227, Reactor Vessel Internals, and Environmentally Assisted Fatigue Associated with the Turkey Point Subsequent License Renewal Appli Project stage: Other L-2018-004, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)2018-01-30030 January 2018 Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) Project stage: Request ML18037A8122018-01-30030 January 2018, 31 January 2018 Submittal of Subsequent License Renewal Application Project stage: Request ML18037A8292018-01-30030 January 2018 Enclosure 2 - Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 Project stage: Other ML18037A8282018-01-30030 January 2018 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary Project stage: Other ML18037A8242018-01-30030 January 2018 Submittal of Subsequent License Renewal Application Project stage: Other ML18113A1322018-01-31031 January 2018, 10 April 2018, 30 April 2018 Transmittal of Subsequent License Renewal Application Revision 1 Project stage: Request L-2018-039, License Renewal Application - Supplement 12018-02-0909 February 2018 License Renewal Application - Supplement 1 Project stage: Supplement ML18053A1372018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Supplement L-2018-053, Replacement Pages to Enclosure 3, SLRA Section 42018-02-16016 February 2018 Replacement Pages to Enclosure 3, SLRA Section 4 Project stage: Request ML18053A1232018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Request ML18038A6912018-04-0303 April 2018 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18113A1422018-04-10010 April 2018 Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) Project stage: Other ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application Project stage: Other ML17338A1342018-04-13013 April 2018 Receipt and Availability of the Subsequent License Renewal Application for the Turkey Point Nuclear Generating Units 3 and 4 Project stage: Other ML17338A1392018-04-13013 April 2018 FRN for Receipt and Availability of the Subsequent License Renewal Application for the Turkey Point Nuclear Generating Units 3 and 4 Project stage: Other ML18087A4332018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Other ML18087A4742018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Request ML17360A0542018-04-25025 April 2018 Subsequent License Renewal Application Online Reference Portal Project stage: Other ML18003A0482018-04-26026 April 2018 Federal Register Notice (FRN) for Opportunity to Request a Hearing and to Petition for Leave to Intervene in the Review of FPLs Turkey Point Subsequent License Renewal Application Project stage: Approval ML18003A0472018-04-26026 April 2018 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from FPL for Subsequent Renewal of the Turkey Point Units 3 and 4 Project stage: Other ML18086A7052018-04-26026 April 2018 Plan for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18149A5702018-05-29029 May 2018 Draft RAI B.2.3.16 1, Fire Protection System Enhancements, for Turkey Point SLRA, for Public Teleconference on June 13, 2018 Project stage: Draft RAI ML18150A2552018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - Spanish Project stage: Meeting ML18150A2402018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - English Project stage: Meeting ML18160A0122018-06-12012 June 2018 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18173A0872018-07-0505 July 2018 Plan for the Irradiated Concrete Technical Issue Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18183A4452018-07-23023 July 2018 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18214A1712018-08-0101 August 2018 Subsequent License Renewal Application Project stage: Other ML18218A2002018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18218A1992018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - E-mail Project stage: RAI ML18218A1982018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 Project stage: Request ML18232A5142018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 Project stage: RAI 2018-02-09
[Table View] |
Text
TURKEY POINT NUCLEAR GENERATING UNITS 3 AND 4 (TURKEY POINT)
SUBSEQUENT LICENSE RENEWAL APPLICATION (SLRA)
REQUESTS FOR ADDITIONAL INFORMATION (RAIS)
SAFETY - SET 9
- 1. Buried and Underground Piping and Tanks, GALL AMP XI.M41 RAI B.2.3.28-1
Background:
SLRA Section B.2.3.28, Buried and Underground Piping and Tanks, states that the program will be consistent with the 10 elements of NUREG-2191,, Rev. 0, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, dated July 2017, Aging Management Program (AMP) XI.M41, Buried and Underground Piping and Tanks, without exceptions or enhancements.
As amended by letter dated October 16, 2018, SLRA Section B.2.3.28 states the following:
a) [b]ecause of operating experience (OE) related to past corrosion of buried pipe at PTN [Turkey Point], a cathodic protection system will be installed in accordance with the requirements of GALL-SLR Report AMP XI.M41, Buried and Underground Piping and Tanks, at least 7 years prior to the subsequent period of extended operation (SPEO).
b) [p]reventive Action Category F has been initially selected for monitoring steel piping during the initial monitoring period.
c) [t]urkey Point has experienced a number of pipe leaks and/or breaks in buried piping. Most of these pipe breaks have been in the piping for the fire water and service water systems. These breaks have been documented in the corrective action program (CAP). A review of the documentation in the CAP indicates that typically they have been caused by localized corrosion.
GALL-SLR Report AMP XI.M41 states that additional inspections, beyond those in Table XI.M41-2, Inspection of Buried and Underground Piping and Tanks, may be appropriate if exceptions are taken to program element 2, preventive actions, or in response to plant-specific operating experience.
During the audit the staff noted that several leaks and locations of localized external corrosion have occurred in buried service water and fire water system piping.
Issue:
- 1.
The response to RAI B.2.3.28-1 stated that cathodic protection will be installed at least 7 years prior to the SPEO and GALL-SLR Report AMP XI.M41 recommends that cathodic protection is installed at least 5 years prior to the SPEO. Therefore, the staffs concern in Issue (a) of RAI B.2.3.28-1 is resolved.
- 2 -
- 2.
Regarding Issue (b) of RAI B.2.3.28-1, the staff notes that GALL-SLR Report Table XI.M41-2 states that transitioning from Preventive Action Category E to Preventive Action Category F is dictated in part by plant-specific OE. GALL-SLR Report Table XI.M41-2 states that Preventive Action Category F is applicable when plant-specific OE identifies leaks in buried piping due to external corrosion, significant coating degradation, or significant metal loss. As recommended by AMP XI.M41, additional inspections, beyond those in Table XI.M41-2 may be appropriate in response to plant-specific OE. Although not explicitly stated in the table, the applicability of Preventive Action Category F is limited to instances where plant-specific OE identifies a few (i.e., as opposed to several) instances of leaks or significant degradation. Based on plant-specific OE not being limited to a few instances of leaks or significant degradation, additional inspections, beyond those in Table XI.M41-2, are appropriate.
Request:
State the basis for why additional inspections, beyond those in Table XI.M41-2, are not appropriate for buried steel piping during the 10 year period prior to the SPEO.
- 2. Reactor Vessel Internals Aging Management Program, GALL AMP XI.M16A Regulatory Basis:
Title 10 of the Code of Federal Regulation (CFR) Section 54.21(a)(3) states that for each structure and component identified in paragraph (a)(1) of this section, the applicant shall demonstrate that the effects of aging will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis (CLB) for the subsequent period of extended operation.
Background:
For each structure and component identified in 10 CFR 54.21(a)(1), the applicant for subsequent license renewal (SLR) has the option to demonstrate compliance with 10 CFR 54.21(a)(3), by including in the SLR application (SLRA) an aging management program (AMP) that is consistent with the applicable AMP described in the GALL-SLR Report The Turkey Point SLRA Section B.2.3.7 states that the reactor vessel internals (RVI) AMP with enhancements will be consistent with GALL-SLR Report AMP XI.M16A. (Note: The AMP enhancements are unrelated to this RAI.) The GALL-SLR Report AMP XI.M16A specifies that for existing RVI AMPs that are based on implementation of MRP-227-A inspection and evaluation guidelines, the guidelines are supplemented through a gap analysis that identifies changes to the AMP that are needed to address an 80-year operating period. Further, the GALL-SLR Report AMP Scope of Program element specifies that if the SLRA AMP is based on MRP-227-A with a gap analysis, the scope of the program focuses on identification and justification of the following:
- 3 -
- a. RVI components that screen in for additional aging degradation mechanisms (DMs) when assessed for the 60-to-80-year operating period (SPEO);
- b. RVI components that previously screened in for certain DMs, and the severity of these 60-year DMs could significantly increase for the 60-to-80 year SPEO;
- c. Changes to the existing MRP-227-A program characteristics, including but not limited to changes in inspection categories, inspection criteria, or primary-to-expansion component criteria and relationships.
RAI B.2.3.7-F Issue:
To address item (a) of the Scope of Program element for an 80-year operating period, the applicants MRP-227-A gap analysis in SLRA Appendix C is based in part on an 80-year screening of the RVI components for the eight aging degradation mechanisms (DMs) and an associated failure modes, effects, and criticality analysis (FMECA) to determine the potential need for changes to RVI component inspection criteria for the SPEO. Neutron fluence and fatigue cumulative usage factor (CUF) are the two time-dependent input parameters with the potential to cause additional DMs to be screened in for the 80-year period. With respect to neutron fluence, Attachment 11 in Enclosure 5 of the SLRA provides Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) Document, MRP 2017-038, Transmittal of Preliminary Results from MRP-191 Expert Panel Review in Support of Subsequent License Renewal at U.S. PWR Plants, December 15, 2017. MRP 2017-038 includes the attachment, Preliminary Fluence Table to Support MRP-191 Subsequent License Renewal (SLR) Expert Panel Review (EPRI Confidential Information).
To support its review of the information in MRP 2017-038, the staff audited Westinghouse Document LTR-REA-17-168, Revision 0, Comparison of Turkey Point Units 3 and 4 Subsequent License Renewal Reactor Internals Fluence to Representative EPRI MRP-191 3-Loop Plant, dated February 2, 2018, including the Attachment to this document.
LTR-REA-17-168, Revision 0 describes EPRI MRP representative reactor internals fluence projections for Westinghouse 3-loop plants.
Request:
Please provide a detailed discussion of the representative reactor internals neutron fluence model used to generate the projections cited in LTR-REA-17-168, Revision 0, and a detailed description of the methods used to obtain the projections. As part of this discussion, provide the following:
a) Confirmation that the fluence analysis methodologies used are consistent with what has been previously reviewed and approved by the NRC.
b) A description of how the nodal fluxes in the core are modeled in the representative model.
- 4 -
c) A discussion regarding differences between the fluence models used as a basis for the 60- and 80-year fluence projections and the assessments performed to establish fluence region classifications for each RVI component. As part of this discussion, address the apparent discrepancies in region classifications as shown in Attachment 1 to SLRA Appendix C (i.e., some components appear to have a lower fluence region classification for the 80-year projection than the 60-year projection). Sufficient information should be given for the staff to understand why the differences would be expected to cause the observed changes in region classifications.