Letter Sequence RAI |
---|
EPID:L-2018-RNW-0002, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement
Results
Other: L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses, L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses, L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items, L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation, L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses, ML17360A054, ML18037A824, ML18037A828, ML18074A252, ML18086A705, ML18087A433, ML18183A445, ML18230B482, ML18232A576, ML18299A114, ML18299A116, ML18341A024, ML19032A536, ML19050A400, ML19162A072, ML19162A097, ML19162A117, ML19162A343, ML22073A122
|
MONTHYEARML19326C1141972-07-19019 July 1972 SLR Tech Specs from Authority File Project stage: Acceptance Review L-2018-004, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)2018-01-30030 January 2018 Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) Project stage: Request ML18037A8122018-01-30030 January 2018, 31 January 2018 Submittal of Subsequent License Renewal Application Project stage: Request ML18037A8292018-01-30030 January 2018 Enclosure 2 - Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 Project stage: Request ML18037A8282018-01-30030 January 2018 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary Project stage: Other ML18037A8242018-01-30030 January 2018 Submittal of Subsequent License Renewal Application Project stage: Other ML18113A1322018-01-31031 January 2018, 10 April 2018, 30 April 2018 Transmittal of Subsequent License Renewal Application Revision 1 Project stage: Request L-2018-039, License Renewal Application - Supplement 12018-02-0909 February 2018 License Renewal Application - Supplement 1 Project stage: Supplement ML18053A1372018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Supplement L-2018-053, Replacement Pages to Enclosure 3, SLRA Section 42018-02-16016 February 2018 Replacement Pages to Enclosure 3, SLRA Section 4 Project stage: Request ML18053A1232018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Request ML18038A6912018-04-0303 April 2018 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18113A1422018-04-10010 April 2018 Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) Project stage: Request ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application Project stage: Other ML18087A4332018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Other ML18087A4742018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Request ML17360A0542018-04-25025 April 2018 Subsequent License Renewal Application Online Reference Portal Project stage: Other ML18086A7052018-04-26026 April 2018 Plan for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18173A0872018-07-0505 July 2018 Plan for the Irradiated Concrete Technical Issue Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Acceptance Review ML18183A4452018-07-23023 July 2018 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18218A2002018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18218A1982018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 Project stage: Request ML18218A1992018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - E-mail Project stage: RAI ML18232A5462018-08-20020 August 2018 Safety RAIs - Set 2 - Draft Project stage: Draft RAI ML18232A5142018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 Project stage: RAI ML18232A5122018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 Project stage: Request ML18232A5132018-08-20020 August 2018 SLRA Safety RAIs - Set 2 - RAIs Project stage: RAI ML18232A5762018-08-21021 August 2018 Plan for On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses2018-09-14014 September 2018 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses Project stage: Other ML18260A2432018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 5 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18260A2412018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application Set 5 Project stage: Request ML18260A2422018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 5 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI ML18259A0002018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 2 Project stage: RAI ML18243A0072018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 3 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI ML18243A0052018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application Set 3 Project stage: Request ML18243A0062018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 1 Project stage: RAI ML18262A0782018-09-26026 September 2018 09/10/2018 Summary of Meeting with FPL to Discuss the Potential Subsequent License Renewal Wear Issues of CRDM Thermal Sleeve Flanges at Turkey Point Based on Recent Operating Experience Project stage: Meeting ML18269A2102018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID L-2018-RNW-0002) - Enclosure Project stage: RAI ML18269A2082018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application Set 4 Project stage: Request ML18269A2092018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI ML18269A2282018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18269A2272018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation2018-10-0505 October 2018 Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation Project stage: Other ML18299A1172018-10-12012 October 2018 Framatome Calculation No. 32-9280712, Rev. 002, Tp CRDM Lower Joint Environmentally Assisted Fatigue Dated October 12, 2018 (Non-Proprietary) Project stage: Request ML18230B4822018-10-15015 October 2018 Report for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal Project stage: Other ML18296A0242018-10-16016 October 2018 Set 3 Response to Request for Additional Information to Subsequent License Renewal Application Safety Review Project stage: Response to RAI L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses2018-10-17017 October 2018 Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses Project stage: Other L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items2018-10-17017 October 2018 Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items Project stage: Other ML18299A1142018-10-24024 October 2018 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 4 Responses Project stage: Other 2018-04-10
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24261B8062024-09-17017 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0242024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0852024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24234A0842024-08-21021 August 2024 Notification of Inspection and Request for Information ML24234A0142024-08-20020 August 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Spent Fuel Storage License Amendment Request (LAR) (L-2023-LLA-0142) ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan IR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 ML22255A0502022-09-15015 September 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Replace Instrumentation with Digital Systems ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22068A2352022-03-17017 March 2022 Licensed Operator Positive Fitness-For-Duty Test ML22074A0932022-03-14014 March 2022 RP RFI March 2022 ML21342A2932021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Requested License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) ML21270A1652021-09-27027 September 2021 NRR E-mail Capture - Turkey Point Request for Additional Information Concerning Full Spectrum LOCA Methodology - EPID L-2021-LLA-0070 ML21252A2142021-09-0101 September 2021 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 - Request for Additional Information Concerning Relief Requests 8 and 9 ML21238A3282021-08-26026 August 2021 RP RFI October 2020 ML20315A0182020-11-10010 November 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20149K6262020-05-27027 May 2020 NRR E-mail Capture - Turkey Point Unit 4 - Request for Additional Information Concerning 2019 Steam Generator Tube Inspections ML20122A1172020-05-0101 May 2020 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 Request for Additional Information Concerning Emergency Action Level Scheme Change (EPID L-2019-LLA-0271) (FPL: L-2019-203) ML20104B2232020-04-0909 April 2020 NRR E-mail Capture - Action: Turkey Point Unit 3 - Request for Additional Information Concerning Deferral of Steam Generator Inservice Inspections ML20084G5622020-03-20020 March 2020 NRR E-mail Capture - Turkey Point Containment Radiation Monitors Request for Additional Information ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information ML19184A1002019-07-0303 July 2019 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4, Request for Additional Information Regarding License Amendment Request 266 ML19101A3312019-04-11011 April 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 11 (EPID No. L-2018-RNW-0002) - Enclosure ML19087A2112019-03-28028 March 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 10 (EPID No. L-2018-RNW-0002) - Enclosure ML19073A0042019-03-14014 March 2019 Safety RAIs - Set 10 - Draft ML19053A6122019-02-22022 February 2019 Response Date Extension for RAIs Set 8, Revision 1, for the Safety Review of the Turkey Point Subsequent License Renewal Application ML19037A3982019-02-0606 February 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 9 (EPID No. L-2018-RNW-0002) - Enclosure ML19032A3972019-02-0101 February 2019 SLRA Request for Additional Information RAIs 3.5.2.2.2.6 Revision 1 Set 8 Final ML19016A2332019-01-16016 January 2019 NRR E-mail Capture - Request for Additional Information - Turkey Point LAR 265 PRA - NFPA RCP Seals - EPID L-2018-LLA-0280 ML18341A0052019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - Enclosure ML18341A0042019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - E-Mail ML18348A5852018-12-13013 December 2018 Emergency Preparedness Inspection and Request for Information ML18318A4332018-11-19019 November 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise NFPA 805 License Condition for Reactor Coolant Pump Seals ML18292A7462018-10-31031 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 7 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2282018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2102018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID L-2018-RNW-0002) - Enclosure ML18243A0072018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 3 (EPID No. L-2018-RNW-0002) - Email ML18259A0002018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 2 2024-09-06
[Table view] |
Text
TURKEY POINT NUCLEAR GENERATING UNITS 3 AND 4 (TURKEY POINT)
SUBSEQUENT LICENSE RENEWAL APPLICATION (SLRA)
REQUESTS FOR ADDITIONAL INFORMATION (RAIS)
SAFETY - SET 9
- 1. Buried and Underground Piping and Tanks, GALL AMP XI.M41 RAI B.2.3.28-1
Background:
SLRA Section B.2.3.28, Buried and Underground Piping and Tanks, states that the program will be consistent with the 10 elements of NUREG-2191, , Rev. 0, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, dated July 2017, Aging Management Program (AMP) XI.M41, Buried and Underground Piping and Tanks, without exceptions or enhancements.
As amended by letter dated October 16, 2018, SLRA Section B.2.3.28 states the following:
a) [b]ecause of operating experience (OE) related to past corrosion of buried pipe at PTN [Turkey Point], a cathodic protection system will be installed in accordance with the requirements of GALL-SLR Report AMP XI.M41, Buried and Underground Piping and Tanks, at least 7 years prior to the subsequent period of extended operation (SPEO).
b) [p]reventive Action Category F has been initially selected for monitoring steel piping during the initial monitoring period.
c) [t]urkey Point has experienced a number of pipe leaks and/or breaks in buried piping. Most of these pipe breaks have been in the piping for the fire water and service water systems. These breaks have been documented in the corrective action program (CAP). A review of the documentation in the CAP indicates that typically they have been caused by localized corrosion.
GALL-SLR Report AMP XI.M41 states that additional inspections, beyond those in Table XI.M41-2, Inspection of Buried and Underground Piping and Tanks, may be appropriate if exceptions are taken to program element 2, preventive actions, or in response to plant-specific operating experience.
During the audit the staff noted that several leaks and locations of localized external corrosion have occurred in buried service water and fire water system piping.
Issue:
- 1. The response to RAI B.2.3.28-1 stated that cathodic protection will be installed at least 7 years prior to the SPEO and GALL-SLR Report AMP XI.M41 recommends that cathodic protection is installed at least 5 years prior to the SPEO. Therefore, the staffs concern in Issue (a) of RAI B.2.3.28-1 is resolved.
- 2. Regarding Issue (b) of RAI B.2.3.28-1, the staff notes that GALL-SLR Report Table XI.M41-2 states that transitioning from Preventive Action Category E to Preventive Action Category F is dictated in part by plant-specific OE. GALL-SLR Report Table XI.M41-2 states that Preventive Action Category F is applicable when plant-specific OE identifies leaks in buried piping due to external corrosion, significant coating degradation, or significant metal loss. As recommended by AMP XI.M41, additional inspections, beyond those in Table XI.M41-2 may be appropriate in response to plant-specific OE. Although not explicitly stated in the table, the applicability of Preventive Action Category F is limited to instances where plant-specific OE identifies a few (i.e., as opposed to several) instances of leaks or significant degradation. Based on plant-specific OE not being limited to a few instances of leaks or significant degradation, additional inspections, beyond those in Table XI.M41-2, are appropriate.
Request:
State the basis for why additional inspections, beyond those in Table XI.M41-2, are not appropriate for buried steel piping during the 10 year period prior to the SPEO.
- 2. Reactor Vessel Internals Aging Management Program, GALL AMP XI.M16A Regulatory Basis:
Title 10 of the Code of Federal Regulation (CFR) Section 54.21(a)(3) states that for each structure and component identified in paragraph (a)(1) of this section, the applicant shall demonstrate that the effects of aging will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis (CLB) for the subsequent period of extended operation.
Background:
For each structure and component identified in 10 CFR 54.21(a)(1), the applicant for subsequent license renewal (SLR) has the option to demonstrate compliance with 10 CFR 54.21(a)(3), by including in the SLR application (SLRA) an aging management program (AMP) that is consistent with the applicable AMP described in the GALL-SLR Report The Turkey Point SLRA Section B.2.3.7 states that the reactor vessel internals (RVI) AMP with enhancements will be consistent with GALL-SLR Report AMP XI.M16A. (Note: The AMP enhancements are unrelated to this RAI.) The GALL-SLR Report AMP XI.M16A specifies that for existing RVI AMPs that are based on implementation of MRP-227-A inspection and evaluation guidelines, the guidelines are supplemented through a gap analysis that identifies changes to the AMP that are needed to address an 80-year operating period. Further, the GALL-SLR Report AMP Scope of Program element specifies that if the SLRA AMP is based on MRP-227-A with a gap analysis, the scope of the program focuses on identification and justification of the following:
- a. RVI components that screen in for additional aging degradation mechanisms (DMs) when assessed for the 60-to-80-year operating period (SPEO);
- b. RVI components that previously screened in for certain DMs, and the severity of these 60-year DMs could significantly increase for the 60-to-80 year SPEO;
- c. Changes to the existing MRP-227-A program characteristics, including but not limited to changes in inspection categories, inspection criteria, or primary-to-expansion component criteria and relationships.
RAI B.2.3.7-F Issue:
To address item (a) of the Scope of Program element for an 80-year operating period, the applicants MRP-227-A gap analysis in SLRA Appendix C is based in part on an 80-year screening of the RVI components for the eight aging degradation mechanisms (DMs) and an associated failure modes, effects, and criticality analysis (FMECA) to determine the potential need for changes to RVI component inspection criteria for the SPEO. Neutron fluence and fatigue cumulative usage factor (CUF) are the two time-dependent input parameters with the potential to cause additional DMs to be screened in for the 80-year period. With respect to neutron fluence, Attachment 11 in Enclosure 5 of the SLRA provides Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) Document, MRP 2017-038, Transmittal of Preliminary Results from MRP-191 Expert Panel Review in Support of Subsequent License Renewal at U.S. PWR Plants, December 15, 2017. MRP 2017-038 includes the attachment, Preliminary Fluence Table to Support MRP-191 Subsequent License Renewal (SLR) Expert Panel Review (EPRI Confidential Information).
To support its review of the information in MRP 2017-038, the staff audited Westinghouse Document LTR-REA-17-168, Revision 0, Comparison of Turkey Point Units 3 and 4 Subsequent License Renewal Reactor Internals Fluence to Representative EPRI MRP-191 3-Loop Plant, dated February 2, 2018, including the Attachment to this document.
LTR-REA-17-168, Revision 0 describes EPRI MRP representative reactor internals fluence projections for Westinghouse 3-loop plants.
Request:
Please provide a detailed discussion of the representative reactor internals neutron fluence model used to generate the projections cited in LTR-REA-17-168, Revision 0, and a detailed description of the methods used to obtain the projections. As part of this discussion, provide the following:
a) Confirmation that the fluence analysis methodologies used are consistent with what has been previously reviewed and approved by the NRC.
b) A description of how the nodal fluxes in the core are modeled in the representative model.
c) A discussion regarding differences between the fluence models used as a basis for the 60- and 80-year fluence projections and the assessments performed to establish fluence region classifications for each RVI component. As part of this discussion, address the apparent discrepancies in region classifications as shown in Attachment 1 to SLRA Appendix C (i.e., some components appear to have a lower fluence region classification for the 80-year projection than the 60-year projection). Sufficient information should be given for the staff to understand why the differences would be expected to cause the observed changes in region classifications.