Category:INSPECTION REPORT
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:UTILITY
MONTHYEARIR 05000413/19900281990-10-26026 October 1990 Insp Repts 50-413/90-28 & 50-414/90-28 on 901001-04. Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors W/Emphasis on Compensatory Measures & Records & Repts IR 05000413/19900251990-10-11011 October 1990 Insp Rept 50-413/90-25 & 50-414/90-25 on 900924-28.No Violations Noted.Major Areas inspected:post-refueling Startup Tests for Both Units & Core Performance Surveillance Performed on Unit 2 IR 05000413/19900241990-09-27027 September 1990 Insp Repts 50-413/90-24 & 50-414/90-24 on 900803-0905. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation,Review of LERs & Followup of Previously Identified Items IR 05000413/19900231990-09-10010 September 1990 Insp Repts 50-413/90-23 & 50-414/90-23 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program in Areas of Internal & External Exposure & Contamination Control & ALARA IR 05000413/19900191990-08-30030 August 1990 Insp Repts 50-413/90-19 & 50-414/90-19 on 900624-0802. Violations Noted.Major Areas Inspected:Plant Operations, Refueling Activities,Surveillance/Maint Observations,Review of LERs & Followup of Previously Identified Items IR 05000413/19900201990-08-28028 August 1990 Insp Repts 50-413/90-20 & 50-414/90-20 on 900724-26. Unresolved Item Identified.Major Areas Inspected: fitness-for-duty Program IR 05000413/19900221990-07-30030 July 1990 Insp Repts 50-413/90-22 & 50-414/90-22 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Records Review of Maint Activities Following 5-yr Insp of Emergency Diesel Generator 2A & Review of Test Procedures ML20056A5101990-07-19019 July 1990 Insp Repts 50-413/90-15 & 50-414/90-15 on 900527-0623. Violation Noted.One Noncited Violation Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation & Maint Observation IR 05000413/19900211990-07-19019 July 1990 Insp Repts 50-413/90-21 & 50-414/90-21 on 900627-29.No Violations or Deviations Noted.Major Areas Inspected:Main Steam Safety Relief Valve Setpoint Testing & Maint & Repair of Coatings on Steel Containment Vessel IR 05000413/19900181990-07-11011 July 1990 Insp Repts 50-413/90-18 & 50-414/90-18 on 900625-29.No Violations Noted.Major Areas Inspected:Inservice Insp & Maint,Including Plan for Outage,Reviews of NDE Procedures & Independent Exam of Verifications IR 05000413/19900161990-07-0909 July 1990 Insp Repts 50-413/90-16 & 50-414/90-16 on 900611-15. Violations Noted But Not Cited.Major Areas Inspected: Conformance to Reg Guide 1.97 & Instrumentation for Light water-cooled Nuclear Power Plants During Accidents IR 05000413/19900141990-06-13013 June 1990 Partially Withheld Physical Security Insp Repts 50-413/90-14 & 50-414/90-14 on 900521-25 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected: Physical Barriers & Security Sys Power Supply IR 05000413/19890281989-10-10010 October 1989 Partially Withheld Insp Repts 50-413/89-28 & 50-414/89-28 on 890911-15 (Ref 10CFR2.790(d) & 73.21)Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits, Detection & Assessment Aids & Testing & Maint IR 05000413/19890251989-09-25025 September 1989 Insp Repts 50-413/89-25 & 50-414/89-25 on 890801-28 & 0912-15.Violations Being Considered for Enforcement.Major Areas Inspected:Two Events Re Overspeeding & Tripping of Auxiliary Feedwater Pump IR 05000413/19890261989-09-20020 September 1989 Insp Repts 50-413/89-26 & 50-414/89-26 on 890821-24.No Violations or Deviations Noted.One Unresolved Item Identified.Major Areas Inspected:Organization & Mgt Controls & Maintaining Radiation Exposures ALARA IR 05000413/19890241989-09-0707 September 1989 Insp Repts 50-413/89-24 & 50-414/89-24 on 890807-11.No Violations Noted.Major Areas Inspected:Physical Security Program for Program Power Reactors IR 05000413/19890221989-08-22022 August 1989 Insp Repts 50-413/89-22 & 50-414/89-22 on 890723-28.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Previously Identified Insp Items IR 05000413/19890201989-08-11011 August 1989 Insp Repts 50-413/89-20 & 50-414/89-20 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Environ Qualification of Electrical Equipment,Generic Ltr 83-28 & NRC Bulletins 88-001 & 88-003 IR 05000413/19890181989-08-11011 August 1989 Insp Repts 50-413/89-18 & 50-414/89-18 on 890717-21. Violation Re Turbine Bldg Sump Analyses Noted But Not Cited. Major Areas Inspected:Chemistry,Liquid Waste Controls & Previously Identified Inspector Followup Items IR 05000413/19890231989-08-0303 August 1989 Partially Withheld Insp Repts 50-413/89-23 & 50-414/89-23 on 890728 (Ref 10CFR2.790 & 73.21)).Violations Noted.Major Area Inspected:Security Event Logs ML20247R7511989-07-24024 July 1989 Insp Repts 50-413/89-16 & 50-414/89-16 on 890528-0701.Two Violations & One Deviation Noted.Major Areas Inspected:Plant Operations,Surveillance Observation,Maint Observation, Licensee Nonroutine Event Repts & Part 21 Insps IR 05000413/19890171989-07-13013 July 1989 Partially Withheld Insp Repts 50-413/89-17 & 40-414/89-17 on 890605-09.Violations Noted Re Protected Area Access Controls & Visitor Controls.Major Areas Inspected:Mgt Support, Security Program Plans & Audits & Physical Barriers IR 05000413/19890191989-07-13013 July 1989 Insp Repts 50-413/89-19 & 50-414/89-19 on 890616-0628. Violations Noted.Major Areas inspected:890616 Event Re Channels of Reactor Vessel Level Instrumentation Sys Inoperable for Period of Time in Excess of Tech Specs ML20246P7321989-07-10010 July 1989 Insp Repts 50-413/89-09 & 50-414/89-09 on 890410-0505. Violations Noted.Major Areas Inspected:Various Plant Groups Including Operations,Maint,Qa,Engineering & Training in Support of Safe Plant Operations IR 05000413/19890151989-06-27027 June 1989 Insp Repts 50-413/89-15 & 50-414/89-15 on 890430-0527. Violation Noted Re Failure to Meet Overtime Restriction Requirements & Unlocked Valves.Major Areas Inspected:Plant Operations,Surveillance & Maint Observations & Plant Mods IR 05000413/19890131989-06-27027 June 1989 Insp Repts 50-413/89-13 & 50-414/89-13 on 890326-0429. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19890121989-06-0606 June 1989 Corrected Page to Insp Repts 50-413/89-12 & 50-414/89-12. No Violations or Deviations Noted.Major Area Inspected: Annual Radiological Emergency Response Exercise on 890427 ML20245F3421989-05-23023 May 1989 Insp Repts 50-413/89-12 & 50-414/89-12 on 890425-28.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Radiological Emergency Response Exercise IR 05000413/19890111989-05-18018 May 1989 Insp Repts 50-413/89-11 & 50-414/89-11 on 890417-21.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Activities During Extended Outages & Control of Radioactive Matls & Surveys IR 05000413/19890101989-05-0202 May 1989 Insp Repts 50-413/89-10 & 50-414/89-10 on 890403-07 & 13. Violations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste,Plant Chemistry,Environ Monitoring,Confirmatory Measurements & Followup on Previously Identified Items IR 05000413/19890071989-04-20020 April 1989 Insp Repts 50-413/89-07 & 50-414/89-07 on 890226-0325. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Rept IR 05000413/19890081989-04-19019 April 1989 Insp Repts 50-413/89-08 & 50-414/89-08 on 890313-14,16-17 & 27-31.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Program Implementing Procedures, Reviews of NDE Procedures & Personnel Qualifications ML20244A8991989-03-29029 March 1989 Insp Repts 50-413/89-05 & 50-414/89-05 on 890204-25. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Nonroutine Event Repts IR 05000413/19890041989-03-13013 March 1989 Insp Repts 50-413/89-04 & 50-414/89-04 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness Re Emergencies ML20246L6721989-03-0303 March 1989 Insp Repts 50-413/89-02 & 50-414/89-02 on 890130-0203. Violations Noted.Major Areas Inspected:Preoutage Planning, Preparations & Mgt Support for Implementing Licensee Radiation Protection Program ML20236A2241989-02-25025 February 1989 Resident Insp Repts 50-413/88-38 & 50-414/88-38 on 881127-890204.One Strength,One Weakness & One Apparent Violation Identified.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observation & Procedures Review IR 05000413/19890031989-02-23023 February 1989 Insp Repts 50-413/89-03 & 50-414/89-03 on 890130-0203.One Weakness Identified Re Photomultiplier Tube.Major Areas Inspected:Design Changes,Plant Mods & Licensee Action on Previously Identified Insp Findings ML20206J5961988-11-15015 November 1988 Insp Repts 50-413/88-34 & 50-414/88-34 on 880926-1025. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19880331988-10-14014 October 1988 Insp Repts 50-413/88-33 & 50-414/88-33 on 880826-0925. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19880301988-09-20020 September 1988 Insp Repts 50-413/88-30 & 50-414/88-30 on 880726-0826.No Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation,Review of Licensee Nonroutine Event Repts & Part 21 Repts IR 05000413/19880271988-09-0909 September 1988 Insp Repts 50-413/88-27 & 50-414/88-27 on 880719-22. Violations Noted.Major Areas Inspected:Radiation Protection, Including Organization & Mgt Controls,Solid Waste Program, Transportation & Licensee Action on Previous Insp Findings IR 05000414/19880311988-09-0808 September 1988 Partially Withheld Insp Repts 50-413/888-31& 50-414/88-31 on 880815-19 (Ref 10CFR2.790 & 73.21).No inspector-identified Violations or Deviations Noted.Major Areas Inspected:Testing & Maint & Physical Barriers - Protected Area ML20154E9461988-09-0606 September 1988 Page 11 to Insp Repts 50-413/88-25 & 50-414/88-25 IR 05000413/19880261988-09-0202 September 1988 Insp Repts 50-413/88-26 & 50-414/88-26 on 880801-05.No Violations Noted.Major Areas Inspected:Qa & Confirmatory Measurements for in-plant Radiochemcial Analysis ML20154A6241988-08-31031 August 1988 Insp Repts 50-413/88-29 & 50-414/88-29 on 880801-05. Violation Noted.Major Areas Inspected:Areas of Catawba Safety Review Group Activities & 10CFR21 Reportability Determinations IR 05000413/19880281988-08-23023 August 1988 Insp Repts 50-413/88-28 & 50-414/88-28 on 880725-29.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Waste Mgt,Effluent Sampling,Monitoring & Analysis & Radiological Environ Monitoring ML20153C5451988-08-19019 August 1988 Insp Repts 50-413/88-25 & 50-414/88-25 on 880626-0725. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maint Observations,Review of LERs & Followup of Previously Identified Items & NRC Bulletins ML20151E5681988-07-0808 July 1988 Insp Repts 50-413/88-22 & 50-414/88-22 on 880526-0625. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maint Observations,Review of Licensee Nonroutine Event Repts & Previously Identified Items IR 05000413/19880231988-06-22022 June 1988 Partially Withheld Insp Repts 50-413/88-23 & 50-414/88-23 on 880607-10.Violation Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Program & Organization,Records & Repts & Alarm Stations IR 05000413/19880191988-06-21021 June 1988 Insp Repts 50-413/88-19 & 50-414/88-19 on 880517-20 & 0603. No Violations or Deviations Noted.Major Areas Inspected: Emergency Plan & Implementing Procedures,Emergency Facilities & Organization & Mgt Control 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000413/19993021999-10-12012 October 1999 NRC Operator Licensing Retake Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23.Two Out of Three RO Candidates & One SRO Passed Retake Exam IR 05000413/19993011999-09-30030 September 1999 NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16.Eight of Fourteen Applicants Passed Exam IR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20210H2211999-07-22022 July 1999 Notice of Violation from Insp on 990314-0424.Violation Noted:Sss Was Not Inoperable for Thirteen Days Because Electrical Breakers Associated with SSS Motor Control Ctr Were Mispositioned ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support PNO-II-99-017, on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground1999-05-18018 May 1999 PNO-II-99-017:on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations PNO-II-99-015, on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws1999-05-0505 May 1999 PNO-II-99-015:on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20207A5881999-02-17017 February 1999 Notice of Violation from Insp on 981213-990123.Violation Noted:Licensee Made Change to Procedures as Described in Updated Final Safety Analysis Rept & Failed to Perform Written Safety Evaluation IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown ML20154C4301998-09-14014 September 1998 Notice of Violation from Insp on 980705-0815.Violation Noted:Licensee Failed to Establish Adequate Surveillance Procedures IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-037A, on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed1998-08-28028 August 1998 PNO-II-98-037A:on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-98-037, on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified1998-08-10010 August 1998 PNO-II-98-037:on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified ML20236V7351998-07-27027 July 1998 Notice of Violation from Insp on 980524-0704.Violation Noted:Licensee Failed to Identify & Take Prompt C/A Following Unit 1 Upper Surge Tank over-temp Events on 960120,980111 & 0507 IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236J7471998-06-11011 June 1998 Notice of Violation from Insp on 980222-0411.Violation Noted:Adminstrative & Surveillance Procedures Not Implemented as Evidenced by Listed Examples IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 PNO-II-98-025, on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed1998-05-11011 May 1998 PNO-II-98-025:on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support ML20217G5551998-03-23023 March 1998 Notice of Violation from Insp on 980111-0221.Violation Noted:Licensee Failed to Perform Written Safety Evaluation for Closing Valves 1CA-6 & 2CA-6 IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20203L6251998-02-0909 February 1998 Notice of Violation from Insp on 971123-980110.Violation Noted:Changes to Radiological Conditions in 1B Residual Heat Removal Pump Room Not Logged to Reflect Changes in Dress Requirements ML20199L6301998-02-0202 February 1998 Notice of Violation from Insp & Exam on 971117-21 & 971201-19.Violation Noted:As of 971219,selected Officers from Site Security Force Had Not Been Retrained to Perform non-licensed Operator Emergency Tasks for Starting Ssf PNO-II-97-066, on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc1997-12-31031 December 1997 PNO-II-97-066:on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc PNO-II-97-064, on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation1997-12-29029 December 1997 PNO-II-97-064:on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation ML20197F2481997-12-19019 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Follow Radiation Protection Procedures in That,Current Radiation Dose Rates Were Not on Vacuum Cleaner Label as Required IR 05000414/19970081997-12-19019 December 1997 Notice of Deviation from Insp on 971012-1122.Deviation Noted:On 971020,licensee Had Not Performed Alarm Set Point Adjustment Evaluation Discussed in Violation 50-414/97-08-01 ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199G0351997-11-10010 November 1997 Notice of Violation from Insp on 970831-1011.Violations Noted:Licensee Failed to Follow Procedures for Security Badge Access Control as Evidenced.On 970909,security Failed to Destroy & Unassign Access Badge of Terminated Individual IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector ML20211L3051997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970727,technician Failed to Correctly Review Drawing Number CNEE-2792-01.02,connection Diagram,Main Steam Sys Terminal Cabinet 2SMTC1,rev 12 IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20210N7111997-08-18018 August 1997 Notice of Violation from Insp on 970608-0719.Violation Noted:On 970424,operations Test Group Technician Failed to Open Valve 2NV-873 as Required by Step 2.2.3 of PT/2/A/4200/01C,resulting in Closed Test Vent Flowpath 1999-09-30
[Table view] |
Inspection Report - Catawba - 1985055 |
---|
|
|
Text
._ _ - . - , . _ . - - - -. .. _- - _ - . . - ~ ~ . .. . . - ~ _ - . . _ . - . - -
.g UNITED STATES y p terg%
,
'
'*
NUCLEAR REGULATORY COMMISSION I REGION il
['-
g 101 MARIETTA STREET. * I *j ATLANTA, GEORGI A 30323
. %,
/
Report No.: .50-414/85-55 Licensee: . Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket No.: 50-414 License No.: CPPR-117 Facility Name: Catawba Unit 2 Inspection Conducte - ovember 4-8, 1985 Inspectors: M[#fM M- 26 -86 L. H J n Date Signed L ~
R.W.Wrpht aAwd g b M 24-85 Date Signed Approved by: T/ # // '26-f7 G. Af BelisTWcting Section Chief Date Signed Quality Assurance Programs Section Division of Reactor Safety I SUMMARY
!
Scope: This routine, unannounced inspection involved 70 inspector-hours on site in the areas of onsite design activities; as-built drawings; and followup on l previously identified unresolved item Results: No violations or deviations were identifie ,
m
,
8512100368 851202 l PDR ADOCK C5000414 G PDR l
i
_ _ _ _ _ _ _ _ _ - _ - - _ _ _ _ _
_ _ .
I l
,
.
!
REPORT DETAILS Persons Contacted
!
Licensee Employees
, *H. Atkins, Quality Assurance (QA) Engineer, Projects
! J. Baggett, Corporate QA Auditor T. Ballard, Quality Control (QC) Inspector, Mechanical / Piping
- N. Barron, Superintendent of Operations
- A. Bhahnagar, Performance Test Engineer
,
- T. Bright, Engineering Manager
'- *J. Cox, Superintendent of Technical Services l T. Davis, Supervisor, Design Engineering l J. Feltham, Engineering Technician "B", Administrative Methods B. Grigsby, Engineering Associate
- C. Hartzell, Compliance Engineer R. Hembree, QC Inspector, Electrical D. Isenhour, Hanger Technical Supervisor
. J. Kelly, QC Inspector, Mechanical / Piping l F. Krauss, QC Inspector, Mechanical / Component Supports l D. Leslie, Mechanical Engineer, Completion
'
C. Melton, Document Control Supervisor l
- T. Mills, Construction Engineer, Electrical D. MisKelly, Electrical Technician "A" D. Hartley, Electrical Technician "B"
, *F. Schiffley II, Licensing Engineer (
'
D. Steel, Supervisor, Planning Unit 2 T. Summey, QC Inspector, Structural E. Williams, QA Technician l Other licensee employees contacted included construction craftsmen,
engineers, technicians, QA/QC persr.inel and office personne Other Organization
- C. Rice, Jr., Project Manager, Bahnson Service Company l B. Williams, Quality Assurance Engineer, Bahnson Service Company l NRC Resident Inspector
I
- Attended exit interview l Exit Interview The inspection scope and findings were summarized on November 8, 1985, with l those persons indicated in paragraph 1 above. The inspector described the l
l L
,__ ___ -. _ _ _ _ _ _ _ _ _ __ _ _ _ _
.
.
areas inspected and discussed in detail the inspection finding No dissenting comments were received from the license The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspectio . Licensee Action on Previous Enforcement Matters (92702) (Closed) Unresolved Item (414/85-38-01): Qualification of Vendor Auditors The inspector discussed the qualification of vendor auditors with responsible Duke Power Company (DPC) personne DPC has reviewed and accepted the QA manual for Bahnson Service Company (BSC). DPC audits of BSCs lead auditor qualifications has been confirmed to be similar to those required by ANSI N45.2.2 The inspector selected the records for two BSC lead auditors and confirmed that their qualifications were very similar to those required by ANSI N45.2.2 (Closed) Unresolved Item (414/85-43-02): Missing M-18G Trending Demonstration Pertinent trend analysis responses written by responsible craf t and engineering supervisors were subsequently found and examined by the inspector. Review of the project manager's final site analyses report written for the period January through June 1985 disclosed that there were no adverse construction trends identified during the subject time fram ' Verification of As-Builts (37051)
This inspection was conducted to verify by sampling that current design and construction drawings / specifications correctly reflect the as-built condition of the plant and that changes from original design were properly reviewed and approved. Supplemental reviews in this area of inspection have been conducted by the NRC resident inspector on site and by Region II based inspectors (RII Inspection Reports 50-414/83-15, 83-21, 84-01, 84-09, 85-05, 85-16, 85-25, 85-32, 85-40, 85-46) who have been inspecting selected piping systems, electrical raceways / cables and structural items to assure the Catawba Unit 2 as-built condition is as described in the FSAR, Governing Procedure and Status of Schedule for Completion of As-built Design Documents The inspector reviewed the following construction site inspection and turnover procedures being implemented by the licensee to control
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _____ __
.
.
as-bo11t . drawings and changes, and to those measures that assure seismic and other stress calculations are based on as-built conditions:
CP-374, RIO Structural Steel Administrative Control, Fabrication, Erection Guidelines and Inspection Guidelines i F-13, R12 Procedure for Control of Work on Systems or Components Which Have Been Turned Over to Nuclear Production
,
Department i
M-8, R14 Piping System Installation Inspection
,
'
M-18, R13 Inspection of Structura! Steel Fabrication and Erection M-41, R9 Electrical Equipment Installation Inspection M-51, R20 Component Supports '
M-61, RIO Instrumentation Process Control and Inspection
- .
Q-1,R24 Control of Nonconforming Items
R-3, R26 Design Drawing and Specification Variation S-2, R23 Systems Verification and Turnover S-4, R11 Requirements for Applying the NA Stamp to Code Systems '
-S-5, R1 Civil Verification and Turnever The . inspector conducted discussions with persons responsible for the implementation of Catawba's program for system verification and
'
turnover. from the Construction Department to the Nuclear Production Department (NPD). Under this program, the Project QA Manager is responsible for approving, compiling, maintaining, and verifying records (including as-buiits) for systems and for certifying that the system is approved by QA prior to turnover. All mechanical and
'
electrical systems are- scheduled to be completed and turned over (final) to NPD by December 23, 1985. Approximately 20?; of the area turnovers are complete and 92?J of the code piping systems have been stamped in accordance with turnover procedure S-4. The construction planning supervisor anticipates meeting 100?4 final turnover of the Unit 2 plant (systems, area, code stamping) to NPD by December 31, 1985, thereby making an anticipated fuel load date of January 15, 1986, a reasonable probabilit It appears that the licensee has developed an adequate program and
,
established satisfactory ieasures to control as-built design and '
'
construction drawings.
i i
-
.
.
,
b. Review of As-Builts (1) Piping Systems The following Chemical and Volume Control System isometric drawings were selected to verify that the as-built configuration agreed with the approved drawing:
>
CN-2492-NV001, R5
-
CN-2492-NV002, R2 -
CN-2492-NV003, R3 This system was inspected for the following attributes:
Piping - location, size, configuration, elevation Supports - location Valves - location, identification, flow direction, operator orientation The inspector confirmed that all piping dimensions and valve orientations were within the acceptance limits specified on drawing CN-1680-48, R16, Piping and Valve Erection Tolerances and SAV (stress analysis validation) Requirement (2) ' Electrical Field observations were made to the following Unit 2 Electrical Shutdown Requests (Form F-13A) for work on systems alreaay turned over to NP Number Description and Observation P01406 Disconnected conductor #11 of cable 2*NI593 at terminal C50R and conductor #56 of cable 2*ATC582 at terminal C50L in cabinet 2EATC5, re-lugged the subject conductors and re-terminated the Verified wor P01496 Conductor #54 of cable 2*ATC527 was re-lugged at terminal B54L and conductor #14 of cable A*NI54 <
was re-lugged at terminal B60L in cabinet 2EATC Verified wor P01499 Conductor #5 of cable 2*NI590 was re-lugged at terminal B39R in cabinet 2EATC6. Verified wor P01502 Conductor #33 of cable 2*ATC582 was re-lugged at terminal F33L in cabinet 2EATC5. Verified work.
-
--
g- -
.
.
The applicable referenced Catawba Nuclear Cable Wire Termination Sheet, CNWT-2717-01-05, R60, and CNWT-2717-01-06, R57 were found to be the latest revision (3) Structural The inspector inspected two pipe rupture restraints (Device Nos. 2RR-B-NC203-37FP and 2RR-B-NC203-91FS) associated with Unit 2's reactor coolant system. The dimensions, joint location,
~ orientation, materials, bolting, welding, configuration, and assembly of these restraints were found to be in agreement with procedural requirements and the following latest approved as-built drawings:
CN-2684-NC-164-B, R1 CN-2684-NC-165-B, R1 CN-2684-NC-153-B, R1 The changes to the above original design drawings were confirmed to have been properly reviewed, approved, and incorporated-into
,
the above drawing The inspector accompanied the licensee's QC personnel during their inspection of a Unit 2, diesel generator component support N .
. - 2-R-VN-004 which was originally located and erected to isometric drawing 2493-VN-008, R8 and hanger drawing No. 2-R-VN-004, R1; but was later redesigned by variation notice (VN) J2765 due to the inability to perform inservice inspection on its snubber. The component's original support inspection records and drawings, the
'
, _
detailed process control sheet, and the subject VN were the primary documents used to verify the as-built condition of this support in the fiel This preliminary inspection was conducted ~
to assure that the subject support's materials and parts were of proper size and classification and that its location and configuration agreed with 'he design documents. Since this was an adjustable support, a later final inspection of this support will be performed when the cold load is set and this cold set inspection will be followed by a final walkdown inspection. This preliminary inspection identified two minor " di screpancies (an insignificant drawing error and the hanger < offset was not within allowable tolerances) which were properly documented on a Form M51C by the QC inspectors for technical support's resolutio Within this area, no violations or deviations were identifie . Onsite Design Activities (37055)
The object of this inspection was to ascertain what design activities are being performed onsite and to determine if these activities are performed in accordance with technical and quality assurance requirements described in the DPC Topical QA Repor .
, . -- _ - _. _
_ - - _ _
V
.
,[ .*
~
. Functional Responsibility for Onsite Design The inspector held discussions with responsible licensee representa-tives to determine to what extent the licensee has retained or delegated responsibility for onsite design. DPC Corporate Design Engineering (CDE) is responsible for the Catawba project design in that all original calculations, specifications, and drawings are prepared and checked by qualified individuals from within CDE. Variations from these design drawings or specifications are not permitted without <
approval by CD . Variation Notices (VNs) serve to document the agreement with CDE to conduct work at variance with approved CDE drawings or specification VNs which are initiated by various disciplined. construction engineers
- are required to receive verbal approval by CDE and written approval by the Project Manager or his designee prior to field implementatio CDE has field extensions of their pipe hanger support / restraint group and civil engineering section on site to -expedite the handling and approval of applicable, VNs for the design of supplemental hangers, supports, restraints,.p'latforms, and civil problems as needed. The on site design extension ~ groups from CDE are currently comprised of four people. Complex problems or those requiring considerable time to analyze are submitted to CDE for computer analysis. Discussions revealed that each site variation notice eventually receives final CDE review and approva .
DPC has contracted with BSC to construct the Heating, Ventilating, and Air Conditioning (HVAC) system at Catawba; however, the design activities are performed by . DPC CDE. . Changes to HVAC design (specifications, drawings, standards, or codes) are accomplished by BSC
,
<
design change requests (DCRs). A DCR is similar tc( a VN in that
- written authorization is necessary from construction engineering to incorporate changes that has been verbally approved by CD \. b >
'
.
All VNs and DCRs are eve'ntually transmitted to CDE;for final approval and, at that time, CDE may'take exception to the' recommended verbally '
approved disposition. VNs and DCRs are incorporated into "as-built" drawings by CDE and revised drawings are issue Design' Procedure Review
'
DPC Procedures <
DPC Topical , Report Duke-1-A, Amendment 9
Design Specification No. - CNS-1206.00-04-003, R12, Procedure Require-
/ ments fo6 Fabrications and Erection of Hangers,J Supports, and Seismic Controis- J i
,
. _ _ _ _ _ _ _ - . _ _ . _ -_-
-- . - - - _ _ - _ . .
. = - _ _ _
.
.
Design Specification N CNS-1211.00-00-0005, R103, Heating, Ventilating, and Air Conditioning, Supplement 5 CN-SRD Design Criteria 77-1.0, Appendix B, Erection Requirements and s
Tolerances T ,
'
Design Specification No. CNS-1206.00-02-1002, R40, Piping Design
%
N CP-385, R26 Support / Restraint Erection Tolerances PR-101, R22 Engineering Calculations (
l PR-130, R18 Engineering Drawings I
l PR-140, R3 Engineering Correspondence PR-160, R6 Nuclear Station Modification
! ;
l PR-170, R4 Design Specifications i
! !
- PR-210, R24 Variation Notices I PR-901, R27 Document Control j
D-1, RIO Control of Field Design G-1, R23 Document Control l R-3, R26 Design Drawings and Specification Variation Q-1, R24 Control of Nonconforming Items R-5, R8 Nuclear Regulatory Commission Reporting Requirements R-6, R4 Significant Corrective Action g
Bahnson Servtc Company Procedures QFP-3.002-CNS, R0 Design Control Procedure QFP-3.004-CNS, R4 Design Change Procedure QFP-6.004-CNS, R3 Document Control and Distribution for BSC-CNS QFP-17.~001-CNS , R1 Document Storage AFP-6.001-CNS, R7 Controlled Document Distribution Index
,
S
, ~
.
.
The inspector interviewed several DPC construction engineerirg personnel, onsite design personnel, QA/QC personnel and BSC QA/QC personnel to determine whether they were knowledgeable of the require-ments specified in the above documents. The inspector concluded that personnel were very knowledgeable of their assigned responsibilities and procedure requirement c. Design Changes DPC VNs and BSC DCRs are initiated onsite when an item cannot be constructed or installed as .dimensioned on the drawing and within allowable procedural erection tolerance The inspector conducted discussions with the hanger / support group and examined VNs used to implement modifications involving the following:
VN Number Component Support Isometric Number J-2766 2-R-NC-1614 CN-2491-NC-060 J-2768 2-R-NV-1000 CN-2491-NV-100 J-2767 2-R-NV-1893 CN-2491-NV-113 J-2761 2-R-CA-1010 CN-2491-CA-012 Each of the above listed problems were identified during testing and were thermal expansion problems. Hangers were modified as to type of support or location to eliminate the problem. Changes were required to update the as-built drawings. These changes were verified to have been implemented recently; therefore, drawing changes have not been incorporated as of November 5,198 It is noted, however, that all component support activities are scheduled to be complete on November 27, 1985. The personnel involved in this group will be transferred to other duties. One individual will still be located at Catawba if other modifications are require The inspector interviewed personnel involved in the civil engineering section and examined documents being prepared to modify some fire stop Package number 2AB1050, Drawing CN-1680-109, Revision 6, problem "A" could not be installed as designed because one of the angle iron stiffners interfered with existing conduit; therefore, problem "B" is being recommended to relocate the stiffner to clear the condui Problem "B" has been cleared by telephone with CD The fire stop is being fabricated in the shop. This VN will be submitted to CDE for approval in the near futur The inspector held discussions with responsible mechanical engineering personnel and reviewed VN 50093 which requested the use of .031 vellumoid gasket material be approved for use on the Auxiliary Feedwater Turbine Driven Pump The vendors maintenance manual did not specify the replace type material to be use VN 46327 was submitted to CDE requesting that 3/4 inch vent lines be added on drawings CN-2491-CA-018, 019, 020, and 021. These vents are J
.
.
high point vents needed during filling and testing operations. The inspector verified that the vent lines had been added to subsequent revisions of the drawings by VN 46418 which superseded VN 4632 The inspector held discussions with responsible electrical engineering personnel and confirmed that the VN program used to document changes is similar to those in other disciplines. VN 31118, VN 50167 and VN 43499 were examined by the inspector and verified to have been handled in accordance with approved procedures. VN 43499 was issued to document that conductor number 4 of Cable 2*ISE565 was shown terminated at one end onl The disposition of the VN instructed the construction organization to terminate the cable on terminal TB926- d. Drawing Control The inspector conducted discussions with responsible document control personnel from the DPC site document control unit. The adequacy of the facility relating to storage, issue, and control of drawings were examined. Drawings were selected from those identified during review of VNs and were verified to have incorporated appropriate changes required by VN approval. Distribution of drawings are controlled from master computer lists which are issued biweekl Document control personnel distribute drawings, specifications, calculations, and other documents to predetermined locations dail These computer list; are maintained current on a daily basis and new printouts are issued biweekl The inspector held discussions with responsible personnel from BSC to ascertain that DCRs were being handled in accordance with approved procedures listed in paragraph b. abov DCR A-0073N464 required a change to the plenum for filtered exhaust units ABFU-1A, IB, 2A, and 2B. DCR A-0073G488 added a drop in the duct to tie in from 1ABUXF-1 DCR A-0079093 changed hanger 2-H-VP-0376 DCR A-0079D77 changed hanger 2-H-VP-037 These hanger changes were verified to have been incorporated during subsequent revisions to the drawings, e. Audits The inspector selected audit reports performed by DPC of BSC activities to assure that the audits verified implementation of essential elements on a triennial basis. An audit performed in August 1982 covered onsite design and document control activitie Subsequent audit dated July 13, 1983, covered welding and record activities. This audit noted that some welders qualifications were past due (90 day requirement).
This deficiency was corrected and the item was closed by DPC on July 13, 1983. Another audit by DPC in April 1984 evaluated the DCR program. An audit dated September 24, 1985 evaluated Design, Records, and Procurement Document Contro The inspector reviewed BSC corporate audit CNS-85-1 and CNS-85-2 to verify that appropriate standards, such as ANSI N45.2, 10 CFR 50,
>
. .
.-
Appendix B, Field procedures, and Administrative Field procedures, were used to measure performance. Auditors were verified to have been qualified in accordance with ANSI N45.2.2 Within this area, no violations or deviations were identifie .)