March 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2012001 AND 05000414/2012001)

Dear Mr. Henderson:

On February 12, 2013, the NRC completed its end-of-cycle performance review of Catawba Nuclear Station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Catawba Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Catawba Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of a White finding which originated in the 2nd quarter of 2012. This finding was related to an inoperable offsite power supply to Unit 1. This was different from the 2nd and 3rd quarter 2012 because the final significance determination letter was issued on October 11, 2012. Plant performance at Catawba Unit 2 during the most recent quarter was within the Licensee Response Column because all Unit 2 inspection findings had very low (i.e., Green) safety significance and all PIs for both units indicated performance at a level requiring no additional NRC oversight (Green).

On February 25, 2013, your staff notified the NRC of your readiness for a supplemental inspection to review your actions to address the Unit 1 White finding. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. The objective of this supplemental inspection is to ensure that the root and contributing causes have been identified and appropriate corrective actions to prevent recurrence are either planned or taken.

ML13063A487 The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. We will also be performing an Independent Spent Fuel Storage Installation Initial Campaign inspection; Temporary Instruction 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping; and reactor operator licensing examinations. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Jonathan Bartley at (404) 997-4607 with any questions you have regarding this letter.

Sincerely,

/RA/

Richard P. Croteau, Director Division of Reactor Projects

Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52

Enclosure: Catawba Nuclear Station Inspection/

Activity Plan (03/01/2013 - 06/30/2014)

cc w/encl: (See page 3)

_________________________

X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP

SIGNATURE CWR /RA/

JHB /RA/

RPC /RA/

NAME CRapp JBartley WJones RCroteau

DATE 02/27/2013 02/27/2013

02/28/2013

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:

Scott L. Batson Plant Manager Catawba Nuclear Station Duke Energy Corporation Electronic Mail Distribution

William M. Suslick Design Engineering Manager Catawba Nuclear Station Duke Energy Corporation Electronic Mail Distribution

Steven B. Putnam Organizational Effectiveness Manager Catawba Nuclear Station Duke Energy Corporation Electronic Mail Distribution

Randall D. Hart Regulatory Compliance Manager Catawba Nuclear Station Duke Energy Corporation Electronic Mail Distribution

Joseph Michael Frisco, Jr.

Vice President, Nuclear Design Engineering General Office Duke Energy Corporation Electronic Mail Distribution

M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution

David A. Cummings (acting)

Fleet Regulatory Compliance & Licensing Manager General Office Duke Energy Corporation Electronic Mail Distribution

Alicia Richardson Licensing Administrative Assistant General Office Duke Energy Corporation Electronic Mail Distribution

Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution

David A. Cummings Associate General Counsel General Office Duke Energy Corporation Electronic Mail Distribution

Beth J. Horsley Wholesale Customer Relations Duke Energy Corporation Electronic Mail Distribution

Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution

Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532

David A. Repka Winston Strawn LLP Electronic Mail Distribution

County Manager of York County York County Courthouse P. O. Box 66 York, SC 29745-0066

Piedmont Municipal Power Agency Electronic Mail Distribution

Vanessa Quinn Federal Emergency Management Agency Radiological Emergency Preparedness Program 1800 S. Bell Street Arlington, VA 20598-3025 Letter to Kelvin Henderson from Richard P. Croteau dated March 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2012001 AND 05000414/2012001)

Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMCatawba Resource ROP Assessment Institute of Nuclear Power Operations (INPO)

Catawba Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 2 03/04/2013 07:41:52 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title

PB1-SUPP

- 95001 SUPPLEMENTAL FOR WHITE FINDING

03/18/2013 03/21/2013 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area

EP

- EMERGENCY PREPAREDNESS INSPECTION 1, 2 03/11/2013 03/15/2013 IP 7111402 Alert and Notification System Testing 1, 2 03/11/2013 03/15/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 03/11/2013 03/15/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 03/11/2013 03/15/2013 IP 71151 Performance Indicator Verification

TI-182

- TI-182 BURIED PIPING/TANK - PHASE 1 1, 2 04/01/2013 04/05/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping

TFPI

- TRIENNIAL FIRE PROTECTION INSP 1, 2 04/22/2013 04/26/2013 IP 7111105T Fire Protection [Triennial]

1, 2 05/06/2013 05/10/2013 IP 7111105T Fire Protection [Triennial]

ISFSI

- ISFSI MAGNASTOR INITIAL LOADING 1, 2 04/28/2013 05/03/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

OL EXAM

- INITIAL EXAM PREP

08/19/2013 08/23/2013 V23405 CATAWBA/SEPTEMBER 2013 EXAM AT POWER FACILITIES

OL EXAM

- INITIAL EXAM WEEK 1

09/16/2013 09/20/2013 V23405 CATAWBA/SEPTEMBER 2013 EXAM AT POWER FACILITIES

ISI

- UNIT 2 INSERVICE INSPECTION

09/23/2013 09/27/2013 IP 7111108P Inservice Inspection Activities - PWR

RP

- RAD HAZARD ANALYSIS AND TRANSPORTATION 1, 2 09/23/2013 09/27/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/23/2013 09/27/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

OL EXAM

- INITIAL EXAM WEEK 2

09/23/2013 09/27/2013 V23405 CATAWBA/SEPTEMBER 2013 EXAM AT POWER FACILITIES

TI-182

- TI-182 BURIED PIPING/TANK - PHASE 2 1, 2 11/12/2013 11/14/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping

EP

- EP EXERCISE 1, 2 03/17/2014 03/21/2014 IP 7111401 Exercise Evaluation 1, 2 03/17/2014 03/21/2014 IP 71151 Performance Indicator Verification

MODS

- PLANT MODIFICATION INSPECTION 1, 2 02/10/2014 02/14/2014 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 02/24/2014 02/28/2014 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Catawba Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 2 of 2 03/04/2013 07:41:52 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title

OL EXAM

- INITIAL LICENSE EXAM PREP

04/14/2014 04/18/2014 V23422 CATAWBA/MAY 2014 INITIAL EXAM AT POWER FACILITIES

ISI

- UNIT 1 IN-SERVICE INSPECTION

05/12/2014 05/16/2014 IP 7111108P Inservice Inspection Activities - PWR

OL EXAM

- INITIAL LICENSE EXAM WEEK 1

05/12/2014 05/16/2014 V23422 CATAWBA/MAY 2014 INITIAL EXAM AT POWER FACILITIES

RP

- RP OCCUPATIONAL BASELINE 1, 2 05/19/2014 05/23/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/19/2014 05/23/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/19/2014 05/23/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/19/2014 05/23/2014 IP 71124.04 Occupational Dose Assessment 1, 2 05/19/2014 05/23/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 05/19/2014 05/23/2014 IP 71151 Performance Indicator Verification

SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

05/19/2014 05/23/2014 IP 7111108P Inservice Inspection Activities - PWR

OL EXAM

- INITIAL LICENSE EXAM WEEK 2

05/19/2014 05/23/2014 V23422 CATAWBA/MAY 2014 INITIAL EXAM AT POWER FACILITIES

RP

- RP OCCUPATIONAL BASELINE WEEK2 1, 2 06/02/2014 06/06/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 06/02/2014 06/06/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 06/02/2014 06/06/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 06/02/2014 06/06/2014 IP 71124.04 Occupational Dose Assessment 1, 2 06/02/2014 06/06/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 06/02/2014 06/06/2014 IP 71151 Performance Indicator Verification Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.