ML20137W863
| ML20137W863 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/02/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20137W868 | List: |
| References | |
| NUDOCS 8512100367 | |
| Download: ML20137W863 (1) | |
See also: IR 05000414/1985055
Text
_ _ _ _ _ _ .
. _ - .
_ _ _
yell &
,
.
Decenter 2,1985
Duke Power Company
/TN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NO. 50-414/85-55
On November 4-8, 1985, NRC inspected activities authorized by NRC Construction
Permit No. CPPR-117 for your Catawba facility.
At the conclusion of the
inspection, the tindings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the in=pection are identified in the report. Within these
areas, the inspection consisted of selective examinations of pro.edures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by"HCDance/ for)
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
l
Inspection Report No. 50-414/85-55
>
l
cc w/ encl:
,
d.L. Dick,VicePresident-Construction
!
@.W.Hampton,StationManager
bec w/ encl:
- N. Jabbour, NRR
C Resident Inspector
Document Control Desk
State of South Carolina
RI
RI
RI
RII
/
RII
L achson:bhg
gt
GBeli sle
CJullan
HDance
11/<25/85
11/f/85
11//(,/85
11/26/85
11/ p85
3
0512100367 851202
gDR
ADOCK 05000414
%$
J'Er I