ELV-02056, Forwards Operator Exam Schedule for Facility,Per Generic Ltr 90-07 Request,Including Number of Candidates to Be Examined During NRC Site Visits,Requalification Schedules & Number of Candidates to Participate in Generic Fundamentals Exam

From kanterella
(Redirected from ELV-02056)
Jump to navigation Jump to search
Forwards Operator Exam Schedule for Facility,Per Generic Ltr 90-07 Request,Including Number of Candidates to Be Examined During NRC Site Visits,Requalification Schedules & Number of Candidates to Participate in Generic Fundamentals Exam
ML20064A556
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/06/1990
From: Hairston W
GEORGIA POWER CO.
To: Perkins K
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ELV-02056, ELV-2056, GL-90-07, GL-90-7, NUDOCS 9009140096
Download: ML20064A556 (5)


Text

. - .-

.. Georgia Power Company

.?.s' : **

  • 333 Pedmont Avenue - .,

-4 Atlanti Georg.a 30308 ,

Telephone 404 526 3195

}

' Ma+rh Address:

40 inverness Center Parkway  !

Post Offce Box 1295 j Birmingham. Alatema 35201..

. Te4 phone 205 BGB 5581 .  ;

September 6, 1990'-

'tmmten e**c Srs=

' W. G. Hairston. Ill ~f*

Senvar Vce President NJClear Operations - ,

ELV-02056 0577 i

Docket Ni 50-424 ~ .;

50-425

- U. S. Nuclear Regulatory Commission ATTN: Document Control Desk -

- Washington, D. C. 20555 .

ATTN: Mr. Kenneth E. Perkins, Jr. - .. .

Chief Operator Licensing Branch OWFN-10D Gentlemen:

V0GTLE ELECTRIC GENERATING PLANT' OPERATOR EXAMINATION SCHEDULE i As requested by Generic Letter 90-07, " Operator Licensing National Examination  ;

Schedule", Georgia Power Company has completed the enclosures-for. the Vogtle Electric Generating Plant. Enclosure 1 provides our estimate of that number of i candidates to be examined during the NRC's site visits. LThe requalification schedule is provided in Enclosure 2. Enclosure 3 provides the estimated number of candidates to participate in the Generic Fundamentals Examination, i

If there are any questions, please contact Mr. Ken Holmes, Manager of Training i and Emergency Preparedness at (404) 826-3901. i Sincerely, Wh. AW "

W. G. Hairston, III l

WGH,III/PAH/gm

Enclosures:

1. Proposed Operator Licensing Examination Schedule
2. Proposed Requalification Examination Schedule - l
3. Proposed Generic Fundamental Examination Schedule j xc (see next pre)

On,5 ,

9009140006 900906' -

PPR V

ADOCK 05000424 PNV (I' ,

. ; ,c , . . _ - _ -- .. _._- _

- 3,- .

i .

Georgia Power A -

U. S.' Nuclear Regulatt " Comission

'ELV-02056 3

Page 2 xc: Seoraia Power Comnany-Mr. C. K. McCoy Mr. G. Bockhold, Jr..

Mr. R. M. Odom '

Mr.' P. D. Rushton NORMS U. S. Nuclear Reaulatory Comission Mr.:S. D. Ebneter, Regional Administrator-Mr..T. A. Reed, Licensing Project Manager, NRR 'l Mr. B. R. Bonser, Senior Resident Inspector, V gtle i

1 l

I i

i y

{ 4; .

.t. .

(.

l j

Enclosure 1--

PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT FACILITY Vogtle Electric Generating Plant NRC REGION 11 FY 1991 FY 1992 FY 1993 FY 1994 i i

-(10/1/90- -(10/1/91- (10/1/92- (10/1/93- I 9/30/91) 9/30/92) 9/30/93) 9/30/94)

1. Assigned-i Date December' December >

December noromhor .

(GL89-03)

~#RO 6 0 19 n

  1. SRO Instant 6' 13 0 12
  1. SRO Upgrade' 0 , 5 5- 5
  1. SRO Limited 0 0 0 o ,
2. Assigned.

Date (GL-89-03)

JN _

  1. RO 12
  1. SRO Instant 0
  1. SRO Upgrade 0
  1. SRO Limitad 0 Please indicate initial cold license examinations'by placing an asterisk (*) by '

the date. Please '.ndicate examinations intended:to extend an o license to a second or subsequent unit with two asterisks (**).perator's. (For example if Unit 1 is in operation and Unit 2 is approaching fuel . load, and three R0 t candidates with no previous license are to be examined on both Units-I and 2, ,

, and five R0 candidates licensed cn Unit l'are to be examined to extend their licensestoUnit2,thenindicate"R03,5**.") ,

, t 6

i I

. . s. .-

'):

. u Enc 1csure 2 l PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT j FACILITY Vogtle Electric Generating Plant NRC REGION II FY 1991 FY 1992 FY 1993 FY 1994 (10/1/90- (10/1/fil- .(10/1/92-('10/1/93'

1. cate IRPRU 'll?/R) 'li?llP 02/IP t 2.. Date' 6/10/91 6/8/92 _. 6/14/93 6/13/94 6/17/91 6/15/92 6/21/93 6/20/94
3. Date 6/24/91, 5/25/92 5/24/93 6/27/94-  ;
4. Date 7/1/91 '6/22/92 5/31/93- 5/30/94 5.

Date ,

f i

?

t i

~

l i

1

.l

- 4 ;, . !.;

~ '

y

)

l Enclosure 3 i PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FGRMAT-  :

FACILITY Vogtle Electric Generating Plant NRC' REGION II-OCTOBER 1990 FEBRUARY 1991

  • JUNE 1991 Estimated  ;

Number of '

Candidates 2 .13 0 q

is administered three The Generic Fundamental Examination times a-year, on the Wednesday following the first Schedule-(GFES) Sunday in February, June, and October, i

5 i

i

< 4 4

i 5

L f l I

l l

1 l

I

\ l l

. j