ELV-00294, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J
ML20235U680
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/28/1989
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20235U683 List:
References
ELV-00294, ELV-294, NUDOCS 8903090322
Download: ML20235U680 (1)


Text

_ __ _ _

"*l:w'ltl-

~

e ,,.;n a n, . . ,

  • 7% . ;, [ ' ',

4 S ";;;'" , 0$!N n a on a m February 28, 1989 j U.S. Nuclear Regulatory Conraission I ATTN: Document Control Desk Washington, D.C. 20555 PLANT V0GTLE - UNIT 2 NRC DOCKET 50-425 OPERATING LICENSE NPF-79 g REACTOR CONTAINMENT BUILDING INTEGRATED LEAKAGE RATE TEST }

Gentlemen: ,

A successful preoperational Reactor Containment Building Integrated Leakage Rate Test was conducted on the Vogtle Electric Generating Plant (Vogtle) Unit 2 containment between November 14 and November 17, 1988. This test was performed to demonstrate that the containment leakage under prescribed post accident conditions (Pa, calculated peak containment ..

internal pressure) does not exceed the allowable values specified in the ~~

Vogtle FSAR and Technical Specifications.

In accordance with 10 CFR 50, Appendix J, Georgia Power Company hereby submits the enclosed report.

Sincerely, Q).k. h W W. G. Hairston, III WGH/NJS/llh

Enclosure:

Reactor Containment Building Integrated Leakage Rate Test fjg cc: Georgia Power Company Sto Mr. P. D. Rice N8' Mr. C. K. McCoy 28 Mr. G. Bockhold, Jr.

00 Mr. M. Sheibani Nu Mr. J. P. Kane

$8 Mr. L. A. Ward I p

R@ V0GTLE-NORMS pl l g NORMS I

O ct ffh U.S. Nuclear Regulatory Commission Mr. M. L. Ernst, Acting Regional Administrator Mr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies) s Mr. J. F. Rogge, Senior Resident Inspector-0perations, Vogtle L. . .