From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
ELV-00015, ELV-15, NUDOCS 8811280144
Download: ML20206J336 (2)


Text

.. . .

Ggorg a Power Cc/rpary

, . 333 Pecmont A.ence .

  1. Atleta Georg a 30308 Telegecne 404 526 6526 sO e a 4545 AnarMa Georg a 30302

%MENI

$, e,YcN,"e'skt r e saren enn som tccter oceaners ,

5834A X7GJ17-Y120 X7GJ17-V770 November 23, 1988 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 -

OPERATING LICENSE NPF-68 REVISED REPLY TO A NOTICE OF VIOLATION Gentlemen:

Georgia Power Company (GPC) hereby submits the enclosed revised response to NRC Inspection Report 50-424/88-29 which concerns the inspection conducted '

by Mr. A. Tillman and Ms. C. Perny of the NRC Region II staff on July 18-22, 1988. This revised response is submitted as a result of discussions between Mr. J. A. Edwards of GPC and Ms. C. Perny of the NRC on October 5, 1988 and an NRC Region II letter dated October 13, 1988. This revised response addresses only Violation 50-424/88-29-01 and supercedes the response to that violation in our letter NON-00328 dated September 21, 1988.

In the enclosure, a transcription of the NRC violation precedes GPC's revised response.

The information contained in the enclosure is safeguards information and, in accordance with 10 CFR 73.21 and 10 CFR 2.790, should not be placed in the NRC Public Document Roon.

Please be advised that the enclosed revised response was to have been submitted to the NRC by November 14, 1988, as required by the NRC Region II letter dated October 13, 1988. Becaure of a mailing error, the revised response generated at the plant site was inadvertently sent around November 4, 1988 to the GPC offices in Atlanta rather than our nuclear operations offices which were relocated to Birmingham, Alabama in late October. We received the revised response via conpany mail from Atlanta on Novenber 17, 1988. The NRC Region II office (Ms. L. Trocine) was contacted upon receipt of the revised response to notify them that the submittal would be late and the reason therefor. We regret any inconvenience that this might have caused.

8811280144 881123 PDR ADOCK 05000424 Q PDC ,

g ., , p DCLOSURE COffDWE 84ft00ARis Brolutm0N UP0ll MPARWoll WGB FAGE 5 DE00ffm0LLED g _J I l

j e SME00lWIDS ORRWm0N DELOSURE CONTAINS SAFEDUARDS INRRMAT10N Georgia Power d UPON SEPAllATION THIS NGE 5 DECONTR011ED U. S. Nuclear Regulatory Comission November 23, 1988 Page Two should you have any questions in this regard, please contact this office at any time.

Sincerely, Ib .kh N W. G. Hairston, III PAH/JAE/ge *

Enclosure:

NRC Violation 88-29-01 and Revised GPC Response c: Georgia Power Company Mr. P. D. Rice, w/o enclosure Mr. G. Bockhold, Jr., w/ enclosure Mr. J. E. Swartzwelder, w/o enclosure Mr. F. R. Timons, w/o enclosure GO-NORMS, w/o enclosure Vogtle-NORMS, w/o enclosure U. S. Nuclear Regulatory Comission Mr. M. L. Ernst, Acting Regional Administrator, w/ enclosure Mr. J. B. Hopkins, Licensing Project Manager, NRR,(2 copies) w/o enclosure Mr. J. F. Rogge, Senior Resident Inspector - Operations, Vogtle, w/o enclosure I

ENCLOSURE CONTAWS SAFEQUARDS INFORMATION UPON SEPARATION THE PAGE 5 DECONTROU.ED