MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-025, Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 02024-05-23023 May 2024 Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 0 PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-008, Annual Radioactive Effluent Release Report2024-04-23023 April 2024 Annual Radioactive Effluent Release Report PNP 2024-009, Annual Radiological Environmental Operating Report2024-04-23023 April 2024 Annual Radiological Environmental Operating Report PNP 2024-017, 2023 Annual Non-Radiological Environmental Operating Report2024-04-23023 April 2024 2023 Annual Non-Radiological Environmental Operating Report PNP 2024-016, Notice of Intent to Pursue Subsequent License Renewal2024-04-18018 April 2024 Notice of Intent to Pursue Subsequent License Renewal PNP 2024-006, Notification of Changes in Accordance with 10 CFR 50.82(a)(7)2024-04-0909 April 2024 Notification of Changes in Accordance with 10 CFR 50.82(a)(7) PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-033, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-021, Ventilated Storage Cask Inspection Summary Report2023-08-16016 August 2023 Ventilated Storage Cask Inspection Summary Report PNP 2023-023, Special Report – High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report – High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link 2024-08-02
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARPNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme ML21152A1112021-06-0101 June 2021 Proposed Changes (mark-up) to Palisades Plant - Appendix a Technical Specifications, and Appendix B Environmental Protection Plan Pages ML21152A1122021-06-0101 June 2021 Page Change Instructions and Retyped Pages for the Palisades Plant Appendix a Permanently Defueled Technical Specifications and Appendix B Environmental Protection Plan ML21152A1132021-06-0101 June 2021 Palisade Nuclear Plant - Proposed Technical Specifications Bases Changes ML21152A1102021-06-0101 June 2021 Evaluation of the Proposed Changes PNP 2020-042, and Big Rock Point Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2020-12-23023 December 2020 and Big Rock Point Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19149A3042019-05-28028 May 2019 Enclosure Attachment 1 (Continued) to Pnp 2019-028: Operating License Page Change Instructions and Retyped Renewed Facility Operating License Pages ML19149A3022019-05-28028 May 2019 Enclosure to Pnp 2019-028: Response to Request for Additional Information - License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications ML19149A3032019-05-28028 May 2019 Enclosure Attachment 1 to Pnp 2019-028: Renewed Facility Operating License Page Markups PNP 2019-007, License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2019-03-0808 March 2019 License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 PNP 2018-040, License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Renewed Facility Operating License Page Changes (Markup)2018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Renewed Facility Operating License Page Changes (Markup) ML18305B3222018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Operating License Change ML18305B3212018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications ML18270A3232018-09-27027 September 2018 Attachment 2: Probabilistic Risk Assessment Technical Adequacy ML18270A3262018-09-27027 September 2018 Attachment 5: Proposed Technical Specification Bases Changes ML18270A3252018-09-27027 September 2018 Attachment 4: Page Change Instructions and Revised Pages, and Appendix a Technical Specifications ML18270A3222018-09-27027 September 2018 Attachment 1: Description and Evaluation of Technical Specifications Changes ML18270A3282018-09-27027 September 2018 Attachment 7: Traveler TSTF-425 Versus Pnp RFOL SR Applicability Cross Reference Table ML18270A3272018-09-27027 September 2018 Attachment 6: No Significant Hazards Consideration PNP 2018-025, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b.2018-09-27027 September 2018 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b. ML18270A3242018-09-27027 September 2018 Attachment 3: Proposed Changes and Appendix a Technical Specifications Pages ML18152A9292018-05-30030 May 2018 License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement PNP 2018-004, Supplement to License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2018-01-24024 January 2018 Supplement to License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications PNP 2017-066, License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2017-11-0101 November 2017 License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications PNP 2017-059, License Amendment Request Supplement - Cyber Security Plan Implementation Schedule2017-10-17017 October 2017 License Amendment Request Supplement - Cyber Security Plan Implementation Schedule PNP 2017-035, License Amendment Request - Administrative Controls for a Permanently Defueled Condition2017-07-27027 July 2017 License Amendment Request - Administrative Controls for a Permanently Defueled Condition PNP 2017-007, License Amendment Request, Cyber Security Plan Implementation Schedule2017-03-30030 March 2017 License Amendment Request, Cyber Security Plan Implementation Schedule PNP 2016-046, License Amendment Request for Editorial and Administrative Changes to Technical Specifications2016-11-0909 November 2016 License Amendment Request for Editorial and Administrative Changes to Technical Specifications PNP 2016-049, License Amendment Request: Control Rod Drive Exercise Surveillance2016-08-22022 August 2016 License Amendment Request: Control Rod Drive Exercise Surveillance PNP 2016-005, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing.2016-07-11011 July 2016 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. PNP 2016-001, License Amendment Request - Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region2016-03-0303 March 2016 License Amendment Request - Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region PNP 2015-035, License Amendment Request - Cyber Security Plan Implementation Schedule2015-06-11011 June 2015 License Amendment Request - Cyber Security Plan Implementation Schedule PNP 2014-111, Revised License Condition - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors2014-12-18018 December 2014 Revised License Condition - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors PNP 2014-091, Supplement to License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times2014-12-0909 December 2014 Supplement to License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times ML14237A1442014-12-0808 December 2014 Issuance of Amendment Cyber Security Plan Implementation Schedule PNP 2014-049, License Amendment Request to Implement 10 CFR 50.61 a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.2014-07-29029 July 2014 License Amendment Request to Implement 10 CFR 50.61 a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events. ML14211A5252014-07-29029 July 2014 WCAP-17628-NP, Revision 1, Palisades, Alternate Pressurized Thermal Shock (PTS) Rule Evaluation. PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2014-06-11011 June 2014 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process PNP 2013-086, License Amendment Request - Cyber Security Plan Implementation Schedule2013-12-30030 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule PNP 2013-044, License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times2013-06-25025 June 2013 License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times PNP 2012-074, License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers2012-09-0606 September 2012 License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers PNP 2012-046, License Amendment Request - Cyber Security Plan Implementation Schedule Milestones2012-06-20020 June 2012 License Amendment Request - Cyber Security Plan Implementation Schedule Milestones 2024-07-09
[Table view] |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert. MI 49043 Tel 269 764 2000 Anthony J. Vitale Site Vice President PNP 2012-046 June 20, 2012 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
License Amendment Request - Cyber Security Plan Implementation Schedule Milestones Palisades Nuclear Plant Docket 50-255 License No. DPR-20
References:
- 1. NRC letter to Entergy Nuclear Operations, Inc., "Palisades Nuclear Plant -Issuance of Amendment Regarding the Cyber Security Plan:
(TAC No. ME4355)," dated July 28,2011 (ADAMS Accession Number ML111801243)
- 2. Entergy Nuclear Operations, Inc., letter to NRC, "Response to Additional Requests for Additional Information (RAls) and Revision to the PNP Cyber Security Plan," dated April 4. 2011 (ADAMS Accession Number ML110950688)
Dear Sir or Madam:
In Reference 1. the NRC issued License Amendment No. 243 to the Renewed Facility Operating License for Palisades Nuclear Plant (PNP) that approved the PNP Cyber Security Plan and associated implementation milestone schedule. The Cyber Security Plan Implementation Schedule contained in Reference 2 was utilized as a portion of the basis for the NRC safety evaluation report provided by Reference 1.
Entergy Nuclear Operations, Inc. (ENO) is planning to implement the requirements of Implementation Schedule Milestone 6 in a slightly different manner than described in the approved Implementation Schedule. Although no change to the Implementation Schedule date is proposed, the change to the description of the milestone activity is conservatively considered to be a change to the Implementation Schedule, and in accordance with the provisions of 10 CFR 50.4 and 10 CFR 50.90. ENO is submitting this request for an amendment to the Renewed Facility Operating License for PNP. The PNP Cyber Security Plan. Revision 0, was previously provided in Reference 2.
This letter contains security-related information - Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390.
PNP 2012-046 Page 2 of 2 This letter contains security-related information - Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390. provides an evaluation of the proposed change. Attachment 2 contains the proposed marked-up operating license page for the Physical Protection license condition for PNP to reference the commitment change provided in this submittal. Attachment 3 contains page change instructions and the proposed revised operating license page. Attachment 4 contains a change to the scope of Implementation Milestone 6. ENO requests that Attachments 1 (Sections 1, 2, and
- 3) and 4 which contain security-related information (SRI) be withheld from public disclosure in accordance with 10 CFR 2.390.
The proposed change has been evaluated in accordance with 10 CFR 50.91 (a)(1) using criteria in 10 CFR 50.92(c), and it has been determined that the change involves no significant hazards consideration. The bases for the determination is included in Attachment 1.
ENO requests this license amendment be effective as of its date of issuance.
Although this request is neither exigent nor emergency, your review and approval is requested prior to December 31 , 2012.
The revised commitment contained in this submittal is summarized in Attachment 5.
I declare under penalty of perjury that the foregoing is true and correct. Executed on June 20, 2012.
ajv/jse Attachments: 1. Analysis of Proposed Operating License Change (contains SRI)
- 2. Proposed PNP Operating License Change (mark-up)
- 3. Renewed Operating License Page Change Instructions and Revised PNP Operating License Page
- 4. Revised Cyber Security Plan Implementation Schedule (contains SRI)
- 5. List of Regulatory Commitments cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC State of Michigan This letter contains security-related Information - Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390.
to PNP 2012-046 Page 3 of S
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory ReguirementS/Criteria 10 CFR 73.S4 requires licensees to maintain and implement a cyber security plan. PNP Renewed Facility Operating License includes a Physical Protection license condition that requires ENO to fully implement and maintain in effect all provisions of the Commission-approved cyber security plan, including changes made pursuant to the authority of 10 CFR SO.90 and 10 CFR SO.S4(p).
4.2 Precedent Amendment No. 203 for the Callaway Plant (Reference S) approved an implementation schedule using the Nuclear Energy Institute (NEI) template (Reference 3), with the exception of Milestone 6. The Callaway Plant deviated from the template for Milestone 6 to address only the NEI 08-09, Revision 6, Appendix D technical controls, excepting for the operational and management controls, on the basis that implementing the technical controls for the target set critical digital assets provides a high degree of protection against cyber related attacks that could lead to radiological sabotage.
The change being proposed by ENO in this amendment request is similar to the change approved in the Callaway Plant Amendment No. 203.
4.3 Significant Safety Hazards Consideration Entergy Nuclear Operations, Inc. (ENO) is requesting an amendment to the Palisades Nuclear Plant (PNP) Renewed Facility Operating License to revise the Physical Protection license condition as it relates to the cyber security plan. This change includes a proposed deviation to the scope of a Cyber Security Plan Implementation Schedule milestone and a proposed revision to the PNP Renewed Facility Operating License to include the proposed deviation.
Specifically, ENO proposes a change to the scope of Implementation Milestone 6 to apply to only technical cyber security controls.
ENO has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, n Issuance of Amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change to the Cyber Security Plan Implementation Schedule is administrative in nature. This change does not alter accident analysis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed change does not require any plant modifications which affect the performance capability of the structures, systems, and components relied upon to mitigate the consequences of postulated accidents and has no impact on the probability or consequences of an accident previously evaluated.
to PNP 2012-046 Page 4 of 5 Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change to the Cyber Security Plan Implementation Schedule is administrative in nature. This proposed change does not alter accident analysiS assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed change does not require any plant modifications which affect the performance capability of the structures, systems, and components relied upon to mitigate the consequences of postulated accidents and does not create the possibility of a new or different kind of accident from any accident previously evaluated.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
Plant safety margins are established through limiting conditions for operation, limiting safety system settings, and safety limits specified in the technical specifications. The proposed change to the Cyber Security Plan Implementation Schedule is administrative in nature. Because there is no change to these established safety margins as result of this change. the proposed change does not involve a significant reduction in a margin of safety.
Therefore, the proposed change does not involve a Significant reduction in a margin of safety.
Based on the above, ENO concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and accordingly, a finding of "no Significant hazards consideration" is justified.
4.4 Conclusion In conclusion, based on the considerations discussed above: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner; (2) such activities will be conducted in compliance with the Commission's regulations; and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
t to PNP 2012-046 Page 5 of 5
5.0 ENVIRONMENTAL CONSIDERATION
The proposed amendment provides a change to the Cyber Security Plan Implementation Schedule. The proposed amendment meets the eligibility criterion for a categorical exclusion set forth in 10 CFR 51.22(c)(12). Therefore, pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 REFERENCES
- 1. NRC letter to Entergy Nuclear Operations, Inc., "Palisades Nuclear Plant - Issuance of Amendment Regarding the Cyber Security Plan: (TAC No. ME4355)," dated July 28,2011 (ADAMS Accession Number ML111801243)
- 2. Entergy Nuclear Operations, Inc., letter to NRC, "Response to Additional Requests for Additional Information (RAls) and Revision to the PNP Cyber Security Plan," dated April 4, 2011 (ADAMS Accession Number ML110950688)
- 3. Letter from Christopher E. Earls (NEI) to Richard P. Correia (NRC). "Template for the Cyber Security Plan Implementation Schedule," dated February 28, 2011 (ADAMS Accession No. ML110600211)
- 4. Letter from Richard P. Correia (NRC) to Christopher E. Earls (NEI), "Template for the Cyber Security Plan Implementation Schedule," dated March 1, 2011 (ADAMS Accession No. ML110070348)
- 5. NRC letter from Mohan C. Thadani. USNRC, to Adam C. Heflin, Union Electric Company, "Callaway Plant, Unit 1 -Issuance of Amendment Re: Approval of Cyber Security Plan (TAC NO. ME4536)," August 17,2011 (ADAMS Accession No. ML112140087)