MONTHYEARPNP 2021-003, 2020 Steam Generator Tube Inspection Report2021-03-25025 March 2021 2020 Steam Generator Tube Inspection Report PNP 2021-001, ASME Section XI 90-Day Owner'S Activity Report2021-01-12012 January 2021 ASME Section XI 90-Day Owner'S Activity Report ML18347A4982019-12-13013 December 2019 Palisades Nuclear Power Plant, Third Interval Inservice Inspection Program for Class 1, 2 & 3 Components and Their Supports. PNP 2019-011, ASME Section XI 90-Day Owner'S Activity Report2019-03-22022 March 2019 ASME Section XI 90-Day Owner'S Activity Report PNP 2017-062, Submittal of 2017 Refueling Outage, 1R25, 180-Day Steam Generator Tube Inspection Report2017-10-18018 October 2017 Submittal of 2017 Refueling Outage, 1R25, 180-Day Steam Generator Tube Inspection Report PNP 2017-046, ASME Section XI 90-Day Owner'S Activity Report2017-07-14014 July 2017 ASME Section XI 90-Day Owner'S Activity Report ML16144A7892016-05-18018 May 2016 Biennial Report of MRP-227-A Reactor Internals Inspection Results PNP 2016-006, Inservice Testing Program Plan Fifth 10-Year Interval2016-04-28028 April 2016 Inservice Testing Program Plan Fifth 10-Year Interval ML16092A0902016-03-16016 March 2016 51-9252894-001, 180-Day Steam Generator Tube Inspection Report, 2015 Refueling Outage, 1R24. PNP 2016-002, ASME Section XI 90-Day Owner'S Activity Report2016-01-15015 January 2016 ASME Section XI 90-Day Owner'S Activity Report PNP 2015-089, Inservice Inspection Master Program Fifth 10-Year Interval2015-12-0909 December 2015 Inservice Inspection Master Program Fifth 10-Year Interval PNP 2015-043, Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination2015-07-0707 July 2015 Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination PNP 2015-022, Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities2015-04-29029 April 2015 Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities PNP 2014-072, 2014 Steam Generator Tube Inspection Report2014-08-0505 August 2014 2014 Steam Generator Tube Inspection Report PNP 2014-055, ASME Section XI 90-Day Inservice Inspection Summary Report2014-06-12012 June 2014 ASME Section XI 90-Day Inservice Inspection Summary Report ML14066A4092014-03-0606 March 2014 Supplemental Response to Request for Additional Information Dated February 26, 2014, for Relief Request Number RR 4-18 - Proposed Alternative, Use of Alternate ASME Code Case N-70-1 Baseline Examination PNP 2014-009, 40-Year Containment Tendon Surveillance Report2014-01-31031 January 2014 40-Year Containment Tendon Surveillance Report PNP 2012-069, ASME Section XI 90-Day Inservice Inspection Summary Report2012-08-0303 August 2012 ASME Section XI 90-Day Inservice Inspection Summary Report PNP 2011-033, Generator Tube Inspection Report2011-04-25025 April 2011 Generator Tube Inspection Report PNP 2011-006, ASME Section XI 90-Day Inservice Inspection Summary Report2011-01-25025 January 2011 ASME Section XI 90-Day Inservice Inspection Summary Report ML0920903162009-07-27027 July 2009 ASME Section XI 90-Day Inservice Inspection Summary Report 2009 ML0907606852009-03-12012 March 2009 Request for Information for IP 71111.08, Inservice Inspection ML0823209822008-08-19019 August 2008 Transmittal of Ventilated Storage Cask Inspection Summary Report ML0825400532008-08-14014 August 2008 Response to Request for Additional Information Concerning Authorization to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examination ML0802205642008-01-21021 January 2008 ASME Section XI 90-Day Inservice Inspection Summary Report ML0708500572007-03-21021 March 2007 Supplement to Request for Relief from ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML0704401872007-02-12012 February 2007 Response to Request for Additional Information Related to 4th Interval Inservice Inspection Plan Relief Requests 4-1 Through 4-12 (TAC Nos. MD2404 - MD2415) ML0626502552006-09-15015 September 2006 Request for Authorization to Extend the Third 10-Year ISI Interval for Reactor Vessel Weld Examination ML0622302752006-08-0202 August 2006 ASME Section XI Inservice Inspection 90-Day Report ML0608904512006-03-24024 March 2006 Inservice Testing Program: Fourth Ten-Year Interval Update ML0603705272006-02-0303 February 2006 Ltr. 02/03/06 Palisades Nuclear Power Plant Request of Information ML0509703192005-03-31031 March 2005 Plant. Request for Authorization to Extend the Third 10-Year IST Interval for Certain Relief Valves ML0509702672005-03-31031 March 2005 Plant. Request for Authorization to Extend the Third 10-Year ISI Interval for Reactor Vessel Weld Examination ML0509702632005-03-31031 March 2005 Request for Authorization to Extend the Third 10-Year ISI Interval for Reactor Vessel Visual Examination ML0505406882005-02-15015 February 2005 ASME Section XI Inservice Inspection 90-Day Report ML0327314002003-09-18018 September 2003 Request for Relief from ASME Section XI, Appendix Viii, Supplement 11 Code Requirements ML0319707292003-07-10010 July 2003 ASME Section XI Inservice Inspection 90-Day Report ML0307005342003-02-28028 February 2003 Supplement to Palisades Risk-Informed Inservice Inspection Piping Program ML0223302592002-08-0808 August 2002 Risk Informed Inservice Inspection Program - Response to Request for Additional Information ML0209203632002-03-21021 March 2002 Part 2 of 2, Palisades Nuclear Plant, ASME Section XI Inservice Inspection 90-Day Reports, Form N-2 or Npt Certificate Holders' Report ML0209203552002-03-21021 March 2002 Part 1 of 2, Palisades Nuclear Plant, ASME Section XI Inservice Inspection 90-Day Reports ML18347A5011995-09-18018 September 1995 Inservice Testing of Selected Safety-Related Pumps Relief Request for Containment Spray and Low Pressure Safety Injection Pumps. ML18348A8951978-06-13013 June 1978 Submittal of Update of Inservice Inspection Program ML18348A8541977-05-0303 May 1977 Inservice Inspection Program 2021-03-25
[Table view] Category:Letter type:PNP
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-025, Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 02024-05-23023 May 2024 Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 0 PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-008, Annual Radioactive Effluent Release Report2024-04-23023 April 2024 Annual Radioactive Effluent Release Report PNP 2024-009, Annual Radiological Environmental Operating Report2024-04-23023 April 2024 Annual Radiological Environmental Operating Report PNP 2024-017, 2023 Annual Non-Radiological Environmental Operating Report2024-04-23023 April 2024 2023 Annual Non-Radiological Environmental Operating Report PNP 2024-016, Notice of Intent to Pursue Subsequent License Renewal2024-04-18018 April 2024 Notice of Intent to Pursue Subsequent License Renewal PNP 2024-006, Notification of Changes in Accordance with 10 CFR 50.82(a)(7)2024-04-0909 April 2024 Notification of Changes in Accordance with 10 CFR 50.82(a)(7) PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-033, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-021, Ventilated Storage Cask Inspection Summary Report2023-08-16016 August 2023 Ventilated Storage Cask Inspection Summary Report PNP 2023-023, Special Report – High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report – High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link 2024-08-02
[Table view] |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant
~Entergy 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Paula K Anderson Licensing Manager PNP 2011-006 January 25, 2011 ASME,Section XI, Article IWA-6000 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
ASME Section XI 90-day Inservice Inspection Summary Report Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Dear Sir or Madam:
Entergy Nuclear Operations, Inc. (ENO) is enclosing the Palisades Nuclear Plant (PNP)
Owner's Activity Report in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Article IWA-6000, and applicable code cases. The report contains abstracts of one non-destructive examination indication and six repair/replacement activities that were required for continued service. These repairs were performed at PNP during the twenty-first fuel cycle and 2010 refueling outage. ENO completed the PNP refueling outage on October 29, 2010. .
This letter contains no new commitments and no revisions to existing commitments.
Sincerely, 6 E:- O~ f"C rvb-pka/tad
Attachment:
- 1. Palisades Nuclear Plant Owner's Activity Report CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
ATTACHMENT 1 Palisades Nuclear Plant Owner's Activity Report 2 pages follow
FORM OAR-~ OWNER'S ACTIVITY REPORT Report Number PLp*1 R21*0AR*1 Plant PALISADES NUCLEAR PLANT Unit No. Commercial service date 12/31/1971 Refueling outage no. 1R21 (If appllcoblo) 4th Current inspection Interval (1ot'. 2nd. a,d. 41h. oth.,)
Current inspection period --'1'-*I_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _=-;;::~;;n------------,_----
(1.t. 2nd. 3rt1)
Edition and Addenda of Section XI applicable to Inspection plans 2001 with 2003 addenda Date and revision of inspection plans 10/26/2010. Revision 19 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the Inspection plans ....:.N.::A-'-_ _ _ _ __
N-460, N-532-4. N*566*2, N-624, N-629, N-639 with conditions in Regulatory Guide 1.147 Revision 15, N-663.
Code Cases used: N-69S.N-706. N-722 in accordance with 10CFRSO.S5a. N-729-1 in accordance with 10CFR50.5Sa (if opplico.ble)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities supporting the completion of ......:1.:..R=2:..:.1--;======;;-_ __
(refueling PU'lilgO numbor) conform \0 the requirements of Section XI.
Signed ~~ ~, ~~ OYmer or OMIbr'l!!; O.,Signee, Titre Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB Global Standards of .......:;C:::::o~nn"'e:::c"'tic=cu7t-;:--:-:,......-=--_..,...._ __
have Inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/
replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this Inspection.
g- Inspecto(s Signature
'0 Commissions N~ 13t1l Ali \C tnL 3tD(i')("Z.1 Notional Board, Stole, Province, .nd Endo..ements Date 'd--Y -::kiN ~(1) II
TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description C-F-1, C5.11 ESS-24-SIS-SH2-207 Subsurface transverse linear Check Valve CK-ES3166 to indication in overlay material.
Tee (Weld overlaid in 1994). 0.75" long x 0.055" deep, 0.225" Augmented inspection. from surface.
Les~ than max. allowable alt.
Acceptable. Previously identified. No evidence of degradation in 2010.
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number 1 RV-1041, Pressurizer Disassemble, Inspect. 10127/2010 PLP00199860R2 Safety Relief Valve repair valve for valve fastener replacement.
test program. PLP00199860R3 Replaced inlet nozzle nozzle replacement due to insufficient tongue length for surface machining.
Replaced fasteners due to shipping damage.
Work Order 00199860 1 CV-1059, Pressurizer Disassemble. inspect, 10/28/2010 PLP00236061 Spray Valve from RCS repair valve due to Loop 2A packing leakage.
Replaced bonnet fasteners due to boric acid degradation.
Work Order 00236061 2 SNB-70, Snubber for Snubber service Ilfe 10/12/2010 PLP00199959 CC-4-12" Line from replacement Old Safety Injection Tank snubber failed T-82D performance test.
Work Order 00199959 3 HBC-40-S", Suction Perform 00 weld 10120/2010 PLPOO180720R2 Line to Auxiliary buildup (not overlay)
- Feedwater Pump on externally corroded P-8C carbon steel pipe, Corrosion was caused by dripping from a fire valve above the pipe.
Work Order 00180720 3 MV-SW135, CCW Replace valve Inlet 10/21/2010 PLP00253009-3 Heat exchanger E- flange due to Internal 54A Service Water impingement wear.
Outlet Bypass Valve Work Oder 00253009 CV-0823 Isolation ,.
3 CV-0825, Service Replace valve body 04/17/2010 PLPOO152134 Water Inlet to studs and nuts Safeguards Cooler corroded by external VHX-27A condensation.
Work Order 00152134