PNP 2013-011, 2013 Palisades Nuclear Plant Initial License Re-Take Examination Proposed Examination Submission

From kanterella
Jump to navigation Jump to search
2013 Palisades Nuclear Plant Initial License Re-Take Examination Proposed Examination Submission
ML13094A242
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/07/2013
From: McNeil D R
NRC/RGN-III
To: Gustafson O W
Entergy Nuclear Operations
Shared Package
ML13087a361 List:
References
NUREG-1021, PNP 2013-011
Download: ML13094A242 (3)


Text

2013 PALISADES NUCLEAR PLANT INITIAL LICENSE RE-TAKE EXAMINATION PROPOSED EXAMINATION SUBMISSION (tEntergy PNP 2013-011 February 7, 2013 Mr. Dell McNeil U.S. Nuclear Regulatory Commission Region Ill 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Palisades Nuclear Plant Dockets 50-255 and 72-07 License No. DPR-20 Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 269.764.2000 Otto W. Gustafson Licensing Manager NUREG-1021 Initial Operator License Written Examination Re-Take Materials

Dear Mr. McNeil:

Entergy Nuclear Operations, Inc. is submitting the initial license written examination take for the Palisades Nuclear Plant, in accordance with NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement

1. The written examination is scheduled for March 1, 2013. The following materials are enclosed:
  • ES 201-3, Examination Security Agreement (updated)

ES 401-2, PWR Examination Outline (updated)

  • ES 401-4, List of Rejected K/A's
  • ES 401-6, Written Examination Quality Checklist
  • ES 401-7, RO Written Examination Coversheet
  • RO Written Examination (ready to give with handouts)
  • RO Written Examination Data Sheets with supporting references
  • RO Written Examination Key PNP 2013-011 Mr. Dell McNeil Page 2 In accordance with NUREG-1021, ES-201, Attachment 1, these materials shall be withheld from public disclosure until after the examinations are complete.

Please contact Jeffrey Iliff at (269) 764-297 4 if you have any questions regarding this submittal.

This letter contains no ne commitments and no revisions to existing commitments.

OWG/bed Attachment 1: Palisades Nuclear Plant Initial Operator License Written Examination Re-take Materials CC Administrator, Region Ill, USNRC (w/o enclosure)

Project Manager, Palisades, USNRC (w/o enclosure)

Resident Inspector, Palisades, USNRC (w/o enclosure)

Document Control Desk, US NRC (w/o enclosure)