PNP 2025-060, First Use Registration of NRC Approved Package
| ML25224A078 | |
| Person / Time | |
|---|---|
| Site: | Palisades, 07109365 |
| Issue date: | 08/12/2025 |
| From: | Fleming J Holtec Palisades |
| To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| PNP 2025-060 | |
| Download: ML25224A078 (1) | |
Text
27780 Blue Star Highway, Covert, MI 49043 1 Holtec Palisades, LLC ("Holtec Palisades") is the licensed owner of the Palisades Nuclear Plant (PNP). Pursuant to the license transfer amendment received in connection with the PNP restart (Reference), licensed operating authority has transferred from Holtec Decommissioning International, LLC ("HDI") to Palisades Energy, LLC ("Palisades Energy").
PNP 2025-060 10 CFR 71.17(c)(3)
August 12, 2025 ATTN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Palisades Nuclear Plant Docket Nos. 50-255 Renewed Facility Operating License No. DPR-20
Subject:
First Use Registration of NRC Approved Package In accordance with Title 10 of the Code of Federal Regulations Part 71, Packaging and Transportation of Radioactive Material, Subpart C Section 17, General license: NRC-approved package, paragraph (c)(3), (10 CFR 71.17(c)(3)), Holtec1 hereby provides the attached information to register an NRC approved package for radioactive material.
This letter contains no new regulatory commitments and no revisions to existing regulatory commitments.
Should you have any questions or require additional information, please contact Frank Sienczak, Regulatory Assurance Manager at (269) 764-2263.
Respectfully, Jean A. Fleming Vice President, Licensing and Regulatory Assurance Holtec International
Reference:
Holtec Palisades, LLC (Holtec) letter to U.S. Nuclear Regulatory Commission (NRC), Palisades Nuclear Plant - Order Approving Direct Transfer of Renewed Facility Operating License and Independent Spent Fuel Storage Installation General License and Issuance of Conforming Amendment No. 275 (EPID L-2023-LLM-0005), dated July 24, 2025 (ADAMS Accession No. ML25167A243)
Attachment:
Package Registration Information cc:
NRC Region III Regional Administrator NRC Senior Resident Inspector - Palisades Nuclear Plant NRC Project Manager - Palisades Nuclear Plant Designated Michigan State Official Digitally signed by Jean A. Fleming DN: cn=Jean A. Fleming, o=Holtec Decommissioning International, LLC, ou=Regulatory and Environmental Affairs, email=J.Fleming@Holtec.com Date: 2025.08.12 08:34:33 -04'00' Jean A.
Fleming
ATTACHMENT PACKAGE REGISTRATION INFORMATION Licensee's Name:
Holtec Palisades, LLC Palisades Energy, LLC Licensee's Address:
27780 Blue Star Memorial Highway Covert, MI 49043 Package Model Package Identification No.
Docket No.
Robatel Technologies, LLC, RT-100 Type B USA/9365/B(U)-96 71-9365