PNP 2025-022, Registration of Holtec HI-STORM FW System Casks
| ML25092A140 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/02/2025 |
| From: | Filbrandt A Entergy Nuclear Operations, Holtec Palisades |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| PNP 2025-022 | |
| Download: ML25092A140 (1) | |
Text
27780 Blue Star Highway, Covert, MI 49043 1 Holtec Palisades, LLC ("Holtec Palisades") is the licensed owner of PNP. Holtec Decommissioning International, LLC ("HDI") is the licensed operator of PNP while the facility is in decommissioning. Pursuant to the license transfer application submitted in connection with the PNP restart (Reference), licensed authority will transfer from HDI to Palisades Energy, LLC ("Palisades Energy")
upon NRC's approval of the transition from decommissioning back to power operations. Holtec Palisades will remain the licensed owner of PNP.
PNP 2025-022 10 CFR 72.212(b)(2)
April 2, 2025 ATTN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Palisades Nuclear Plant Docket Nos. 50-255,72-007 Renewed Facility Operating License No. DPR-20
Subject:
Registration of Holtec HI-STORM FW System Casks In accordance with the requirements of 10 CFR 72.212, Conditions of general license issued under § 72.210, paragraph (b)(2), Holtec1 hereby provides the attached information to register the use of approved spent fuel storage casks at the Palisades Nuclear Plant Independent Spent Fuel Storage Installation (ISFSI).
This letter contains no new regulatory commitments and no revisions to existing regulatory commitments.
Respectfully, Amy Filbrandt Acting Regulatory Assurance Manager
Reference:
Holtec Decommissioning International, LLC (HDI) letter to U.S. Nuclear Regulatory Commission (NRC), "Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments," dated December 6, 2023 (ADAMS Accession No. ML23340A161)
Attachment:
Cask Registration Information cc:
NRC Region III Regional Administrator NRC Senior Resident Inspector - Palisades Nuclear Plant NRC Project Manager - Palisades Nuclear Plant
ATTACHMENT CASK REGISTRATION INFORMATION Licensee's Name:
Holtec Palisades, LLC Holtec Decommissioning International, LLC Licensee's Address:
27780 Blue Star Memorial Highway Covert, MI 49043 Reactor License No.:
DPR-20 Reactor Docket No.:
50-255 ISFSI Docket No.:
72-007 Cask Certificate No.:
1032, Amendment 7 Cask Model No.:
HI-STORM FW Version E1 Multi-Purpose Canister (MPC)-37P Storage System Holtec Cask FSAR Revision No.:
Revision 11 Contact for Additional Information:
Keith Schultz Sr. Program Manager (269) 764-3507 HI-STORM Overpack Serial No.
MPC Serial No.
MPC Aggregate Heat Load Placed in Service 556 432 29.017 kW 03/06/2025 567 433 28.958 kW 03/13/2025 553 434 28.586 kW 03/19/2025 561 435 28.276 kW 03/25/2025