PNP 2012-009, Updated SDP Assessment of DC Panel D11-2 Fault

From kanterella
Jump to navigation Jump to search
Updated SDP Assessment of DC Panel D11-2 Fault
ML12023A190
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/18/2012
From: Gustafson O
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PNP 2012-009
Download: ML12023A190 (2)


Text

SEntergy Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Otto W. Gustafson Licensing Manager PNP 2012-009 January 18, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Updated SDP Assessment of DC Panel D1 1-2 Fault Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Reference:

Letter from Entergy Nuclear Operations, Inc. to Nuclear Regulatory Commission dated January 5, 2012, "Regulatory Conferences Supporting Documentation for Apparent Violations EA-1 1-241 and EA-1 1-243"

Dear Sir or Madam:

Entergy Nuclear Operations, Inc, (ENO) attended a regulatory conference at the NRC Region III office on January 11, 2012. At that meeting, ENO agreed to provide an updated significance determination process (SDP) related to the failure of a DC Bus, causing a plant trip on September 25, 2011. The updated SDP is attached.

This letter contains no new commitments and no revisions to existing commitments.

Sincerely, Awl*

OWG/bed

Attachment:

1. SDP Assessment of DC Panel Dl -2 Fault, Revision 2 CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC ii SDP Assessment of DC Panel D1 1-2 Fault Revision 2 229 Pages Follow