05000293/LER-1982-055, Forwards LER 82-055/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-055/03L-0
ML20067D655
Person / Time
Site: Pilgrim
Issue date: 12/10/1982
From: Mathis C
BOSTON EDISON CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20067D659 List:
References
82-310, NUDOCS 8212210067
Download: ML20067D655 (1)


LER-2082-055, Forwards LER 82-055/03L-0
Event date:
Report date:
2932082055R00 - NRC Website

text

,_ - _ _ _ _ _ _ - _ _ - -_- -

.,o sostox $'

Edison co-m PILGRIM NUCLEAR POWER STATION RFD No.1 Rocnv HILL RoAo PLYMOUTH, M ASSACHuSETTs 02360 December 10, 1982 C J M ATHIS STATION M AN AGE R mcaiu rarios BEco Ltr. #82-310 Ronald C. Haynes Regional Administrator, Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Docket Number 50-293 License DPR-35

Dear Sir:

The attached Licensee Event Report 82-055/03L-0 "RCIC Turbine Control", is hereH submitted in accordance with the requirements of Pilgrim Nuclear Pow' e Station Technical Specification 6.9.B.2.b.

If there are aay questions on this subject, please contact us.

Respectfully submitted, C. J. Ma is Station Manager Pilgrim Station GGW:ep

Enclosure:

LER 82-055/03L-0 cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Standard BECo LER Distribution

~~

8212210067 821210 PDR ADOCK 05000293 p G PDR fC