05000293/LER-1982-037, Forwards LER 82-037/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-037/03L-0
ML20065G300
Person / Time
Site: Pilgrim
Issue date: 09/22/1982
From: Mathis C
BOSTON EDISON CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20065G306 List:
References
82-251, NUDOCS 8210040100
Download: ML20065G300 (1)


LER-1982-037, Forwards LER 82-037/03L-0
Event date:
Report date:
2931982037R00 - NRC Website

text

.

Ed' ison um.,

seston PILORIM NUCLEAR POWER STATION RFD #1 ROCKY HILL ROAG PLYMOUTH. MAGSACHUGETTs 02360 C. J. MATHIS September 22, 1982 STATION MANAGER PILGRIM STATION BECo. Ltr. #82-251 Ronald C. Haynes Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Docket Number 50-293 License DPR-35

Dear Sir:

The attached Licensee Event Report 82-037/03L-0 " Late Surveillance Tests" is hereby submitted in accordance with the requirements or Pilgrim Nuclear Power Station Technical Specification 6.9.B.2.c.

If there are any questions on this subject, please contact us.

Respectfully submitted,

/f A

1 f/l /

i ?Pi C.J. M his Station Manager Pilgrim Station GGW/j g Enclosure: LER 82-037/03L-0 cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.

02555 Standard BECo. LER Distribution i

A 9210040100 820922 PDR ADOCK 05000293 S

PDR y

b