Responds to Generic Ltr 89-07 Re Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs.Changes Made to Contingency Plan,Per 10CFR50.54.Plan Withheld (Ref 10CFR73.21)
ML19327B229
Person / Time
Site: Pilgrim
Issue date: 10/20/1989
From: Bird R
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-89-156, GL-89-07, GL-89-7, NUDOCS 8910270207
Download: ML19327B229 (2)


Text

GL 89-07 SAFEGUARDS

" so8=== l lNFORMATION P6lgnm Nuticar Power Station -

ENCLOSED nocir siiinosa  !

Plymouth, Massachusetts 02360 l

Ralph G. Bird BECo 89-156 Senivt Vice Preudent - Nuclear .

October 20, 1989 a

U.S. Nuclear Regulatory Commission -

{

L Document Control Desk Washington, DC 20555 l

License DPR-35  !

Docket 50-293 l t

NRC GENERIC LETTER 89-07 POWER REACTOR SAFEGUARDS CONTINGENCY PLANNING l, FOR SURFACE VEHICLE BOMBS  ;

This letter responds to the. subject NRC Generic Letter 89-07, dated April 28, 1989, which Boston Edison Company received on May 10, 1989. The letter  !

required Boston Edison Company to include short-term actions in the Safeguards l Contingency Plans to protect against attempted radiological sabotage involving  ;

a land vehicle threat, if such a threat were to materialize. The letter j requested BECo to confirm in writing within 180 days from receipt of the letter i that the required actions have been completed. .j Upon receipt of the NRC Generic Letter 89-07 and NUREG/CR-5246 Pilgrim Nuclear Power Station site characteristics and features were t.nalyzed and short-term measures were identified. Based upon these short-term measures, safeguards contingency implementing procedures were developed and advance arrangements were made to facilitate implementation of the short-term contingency measures  !

if they are needed. Also, changes were made to the Contingency Plan under the  !

provisions of 10CFR50.54(p)(2). The Enclosure contains these changes to the  !

Contingency Plan, j SAFEGUARDS 1 INFORMATION ENCLOSED ps3 pjo218587: $NShy g* 3 e 1

l  :

L , 9. f 90STON EDISON COMPANY  !

C 20, 1989 l

u. pt:berS. Nuciear Regulatory Comission l

SAFEGUARDS i Page Two INFORMATION  !

L ENCLOSED l c

i Pursuant to 10CFR73.21, the Enclosure contains Safeguards information and  !

should be with held from public disclosure. .

i e

R. . Bird I

l HGL/amm/3746  ;

Enclosure Commonwealth of Massachusetts)

County of Plymouth )  ;

Then personally appeared before me, Ralph G. Bird, who being duly sworn, did ,

state that he is Senior Vice President - Nuclear of Boston Edison Company and I that he is duly authorized to execute and file the submittal contained herein  !

in the name and on behalf of Boston Edist,n Company and that the statements in  !

said submittal are true to the best of his knowledge and belief.

  • My commission expires: OOS. /T _ M /I DATE NOTARY PUBLIC l cc: Mr. D. Mcdonald, Project Manager Division of Reactor Projects - I/II  :

Office of Nuclear Reactor Regulation i Mail Stop: 1401 }

U. S. Nuclear Regulatory Commission 5 t 1 White Flint North  !

l 11555 Rockville Pike i Rockville, MD 02852 l U. S. Nuclear Regulatory Commission Region I ,

475 Allendale Road i King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station ,

l SAFEGUARDS INFORMATION ENCLOSED 1

1'

-. -. , . . - - - . - - . .-. - ..