05000293/LER-1982-030, Forwards LER 82-030/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-030/03L-0
ML20065A231
Person / Time
Site: Pilgrim
Issue date: 09/03/1982
From: Mathis C
BOSTON EDISON CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20065A234 List:
References
82-236, NUDOCS 8209130177
Download: ML20065A231 (1)


LER-1982-030, Forwards LER 82-030/03L-0
Event date:
Report date:
2931982030R00 - NRC Website

text

~

o sc *.10 %

Etlison.co..,

PILGNIM NUCLEAR POwcR CTar!ON Rf D #1 HOCKY HILL RO AD P LY M O U 1 H, MASSACHUGLTTs 02360 September 3, 1982 BECo. Ltr.82-236 Ronald C. Ilaynes Regional Administrator, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prunsia, PA 19406 Docket Number 50-293 License DPR-35 Gentlemen:

The attached Licensee Event Report 82-030/03L-0 " Torus Water Level" is hereby submitted in accordance with the requirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.2,b.

If there are any questions on this subject, please contact us.

Respectfully submitted, y

//

(g '/t??h C. J. Mathis S ation Manager Pilgrim Station GGW/j g

Enclosure:

LER 82-030/03L-0 cc: Document Control Desk l

U. S. Nuclear Regulatory Commission l

Washington, D.C. 20555 Standard BECo. LER Distribution l

8209130177 820903 PDR ADOCK 05000293 S

PDR i