05000293/LER-1982-052, Forwards LER 82-052/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-052/03L-0
ML20067B497
Person / Time
Site: Pilgrim
Issue date: 11/26/1982
From: Mathis C
BOSTON EDISON CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20067B501 List:
References
82-302, NUDOCS 8212060210
Download: ML20067B497 (1)


LER-2082-052, Forwards LER 82-052/03L-0
Event date:
Report date:
2932082052R00 - NRC Website

text

n. . a, sostom Edison co ,m PILGRIM NUCLEAR POWER STATION RFD No.1 ROCKY HILL ROAD PLYMOUTH. M AsSACHUSETTs 02360 November 26, 1982 C J M ATHIS SrArlON M AN AGER mGaiu srArioN BECo Ltr. #82-302 v ald C. Haynes 1 ional Administrator, Region 1

- ' . Nuclear Regulatory Commission

,31 Park Avenue King of Prussia, PA 19406 Docket Number 50-293 License DPR-35

Dear Sir:

The attached Licensee Event Report 82-052/03L-0, " Recirculation Pump Trip,"

is hereby submitted in accordance with the requirements of Pilgrim Nuclear Power Station Technical Specification 6.9.3.2.b and License Section 3.E.

If there are any questions on this subject, please contact us.

Respectfully submitted, is

/!

J. Mathis Station Manager Pilgrim Station GGW:jg

Enclosure:

LER 82-052/03L-0 cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Standard BECo LER Distribution y

F212060210 821526 PDR ADOCK 05000293 /y(y S PDR