Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20210U4831999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data Sheets for Period of 990101-0630,per 10CFR26.71(d) ML20210S0891999-08-0909 August 1999 Forwards Amend 11 to Indemnity Agreement B-48 Signed by Boston Edison Co & Entergy Nuclear Generation Co ML20210R6251999-08-0606 August 1999 Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant ML20210M9411999-08-0202 August 1999 Requests That NRC Treat Pending Actions Requested by Beco Prior to 990713,as Requests Made by Entergy.Ltr Requests That Minor Administrative Changes to License Amend 182 & Associated Ser, ,reflect 990713 Transfer ML20210H8761999-07-30030 July 1999 Requests That NRC Grant Exemption from Requirements of 10CFR50,App E,Section IV F,Which Would Authorize Rescheduling of 2001 Biennial Full Participation Emergency Preparedness Exercise for Pilgrim Station to 2002 ML20210H8661999-07-29029 July 1999 Provides Revised Response to GL 96-06 & Addresses NRC Insp Concern for Containment Penetration X-12.Info Submitted to Facilitate NRC Review & Closeout of Subject GL for Plant ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20216D4131999-07-22022 July 1999 Informs That J Conlon,License OP-11040-1,terminated Employment with Beco on 990703,per 10CFR50.74.Individual Will Not Participate in Util Licensed Operator Requalification Training Program ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210C4151999-07-19019 July 1999 Informs That Util Intends to Submit Approx Eight Licensing Actions in FY00 & Eight in FY01,in Response to Administrative Ltr 99-02.Actions Are Not Expected to Generate Complex Reviews ML20210F3711999-07-14014 July 1999 Informs NRC That Effective 990713,listed Pilgrim Station Security Plans Have Been Transferred from Boston Edison to Entergy & Are Still in Effect ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20209C7761999-07-0606 July 1999 Submits Annual Summary Rept of Changes Made to QAP Description as Described in QA Manual,Vol Ii.Rept Covers Period of Jul 1998 Through June 1999.No Changes Made During Period ML20209C3851999-07-0606 July 1999 Forwards Redacted Draft of Decommissioning Trust Agreement Re Transfer of PNPS & NRC Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generating Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20209B9411999-06-30030 June 1999 Discusses Deferral of IGSCC Welds to RFO 13.Deferral of Welds to Refueling Outage 13 Does Not Impact Acceptable Level of Quality & Safety Per 10CFR50.55(a)(3)(i) Since Plant in Compliance W/Exam Percentage Requirements ML20209B9431999-06-30030 June 1999 Provides Formal Notification That Closing Date for Sale & Transfer of Pilgrim Station Scheduled to Occur on 990713. a Wang Will Be Verbally Notified of Time of Sale Closing ML20209B9791999-06-29029 June 1999 Forwards Rev 13A to Pilgrims COLR for Cycle 13,IAW TS 5.6.5 Requirements.Rev 13A Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 13 ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209A8701999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant,Reporting Status of Facility Y2K Readiness Encl ML20210U5901999-06-25025 June 1999 Opposes Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts.Expresses Skepticism Re Claim by Companies That Consumers Will Benefit from Proposed Consolidation & four-year Freeze in Base Rates ML20209C3431999-06-22022 June 1999 Forwards Addendum 1,Rev 14 to Pilgrim Station Security Plan,Iaw 10CFR50.54(p)(2).Changes Proposed Have Been Implemented & Constitute Increase in Plant Defense Plan Commitments.Encl Withheld,Per 10CFR73.21 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20210U4831999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data Sheets for Period of 990101-0630,per 10CFR26.71(d) ML20210S0891999-08-0909 August 1999 Forwards Amend 11 to Indemnity Agreement B-48 Signed by Boston Edison Co & Entergy Nuclear Generation Co ML20210R6251999-08-0606 August 1999 Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant ML20210M9411999-08-0202 August 1999 Requests That NRC Treat Pending Actions Requested by Beco Prior to 990713,as Requests Made by Entergy.Ltr Requests That Minor Administrative Changes to License Amend 182 & Associated Ser, ,reflect 990713 Transfer ML20210H8761999-07-30030 July 1999 Requests That NRC Grant Exemption from Requirements of 10CFR50,App E,Section IV F,Which Would Authorize Rescheduling of 2001 Biennial Full Participation Emergency Preparedness Exercise for Pilgrim Station to 2002 ML20210H8661999-07-29029 July 1999 Provides Revised Response to GL 96-06 & Addresses NRC Insp Concern for Containment Penetration X-12.Info Submitted to Facilitate NRC Review & Closeout of Subject GL for Plant ML20216D4131999-07-22022 July 1999 Informs That J Conlon,License OP-11040-1,terminated Employment with Beco on 990703,per 10CFR50.74.Individual Will Not Participate in Util Licensed Operator Requalification Training Program ML20210C4151999-07-19019 July 1999 Informs That Util Intends to Submit Approx Eight Licensing Actions in FY00 & Eight in FY01,in Response to Administrative Ltr 99-02.Actions Are Not Expected to Generate Complex Reviews ML20210F3711999-07-14014 July 1999 Informs NRC That Effective 990713,listed Pilgrim Station Security Plans Have Been Transferred from Boston Edison to Entergy & Are Still in Effect ML20209C3851999-07-0606 July 1999 Forwards Redacted Draft of Decommissioning Trust Agreement Re Transfer of PNPS & NRC Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generating Co ML20209C7761999-07-0606 July 1999 Submits Annual Summary Rept of Changes Made to QAP Description as Described in QA Manual,Vol Ii.Rept Covers Period of Jul 1998 Through June 1999.No Changes Made During Period ML20209B9411999-06-30030 June 1999 Discusses Deferral of IGSCC Welds to RFO 13.Deferral of Welds to Refueling Outage 13 Does Not Impact Acceptable Level of Quality & Safety Per 10CFR50.55(a)(3)(i) Since Plant in Compliance W/Exam Percentage Requirements ML20209B9431999-06-30030 June 1999 Provides Formal Notification That Closing Date for Sale & Transfer of Pilgrim Station Scheduled to Occur on 990713. a Wang Will Be Verbally Notified of Time of Sale Closing ML20209B9791999-06-29029 June 1999 Forwards Rev 13A to Pilgrims COLR for Cycle 13,IAW TS 5.6.5 Requirements.Rev 13A Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 13 ML20209A8701999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant,Reporting Status of Facility Y2K Readiness Encl ML20210U5901999-06-25025 June 1999 Opposes Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts.Expresses Skepticism Re Claim by Companies That Consumers Will Benefit from Proposed Consolidation & four-year Freeze in Base Rates ML20209C3431999-06-22022 June 1999 Forwards Addendum 1,Rev 14 to Pilgrim Station Security Plan,Iaw 10CFR50.54(p)(2).Changes Proposed Have Been Implemented & Constitute Increase in Plant Defense Plan Commitments.Encl Withheld,Per 10CFR73.21 ML20195G3721999-06-0707 June 1999 Informs That Proposed Indicators Failed QA Assessments for Digital Verification,Validation & Control of Software. Proposed Mod Can Be Completed on-line ML20195B5021999-05-27027 May 1999 Provides Suppl Info to 990203 Request of Beco That NRC Consent to Indirect Transfer of Control of Util Interest in License DPR-35.Request Described Proposed Merger of Bec Energy with Commonwealth Energy Sys ML20207D4681999-05-24024 May 1999 Provides Addl Info to That Included in Beco Ltr 98-123 Dtd 981001,addressing NRC Concerns Described in GL 96-06, Concerning Waterhammer in Reactor Bldg Closed Cooling Water Sys ML20195B9051999-05-20020 May 1999 Forwards Completed Renewal Applications for Listed Operators.Without Encls ML20206J4901999-05-0606 May 1999 Forwards Completed License Renewal Application,Including Forms NRC-398 & 396 for Sc Power,License OP-6328-3 ML20206P0711999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, for K Walz,License SOP-10886-1.Encl Withheld IAW 10CFR2.790(a)(6) ML20206D3621999-04-27027 April 1999 Informs NRC That Final Five Sys self-assessments Required to Fulfill Commitment Made in 980828 Response to Insp Rept 50-293/98-04 Were Completed on 990422.Completion Was Delayed by High Priority Refueling Outage 12 Preparatory Work ML20205R9871999-04-21021 April 1999 Forwards Affidavit of JW Yelverton of Entergy Nuclear Generation Co Supporting Request for Withholding Info from Rept on Audit of Financial Statements for Year Ended 971231. Pages 16 & 18 of Subj Rept Also Encl ML20207B0891999-04-20020 April 1999 Forwards e-mail Message from Constituent,J Riell Re Y2K Compliance of Nuclear Power Plant in Plymouth,Massachusetts. Copy of Article Entitled Nuke Plants May Not Be Y2K Ready Also Encl ML20206A2741999-04-16016 April 1999 Dockets Encl Ltr Which Was Sent to AL Vietti-Cook Re Condition of Approval of Transfer of License & License Condition for DPR-35.Encl Resolves Issues Between Attorney General of Commonwealth of Massachusetts & Applicants ML20205P9131999-04-16016 April 1999 Submits Applicant Consent to Listed Condition of Approval of Transfer of License & License Condition for License DPR-35 & Affirmatively Request That NRC Adopt Listed Language in Order ML20205P9271999-04-16016 April 1999 Withdraws Motion for Leave to Intervene & Petition for Summary Or,In Alternative,For Hearing.Requests That NRC Adopt Condition of Approval of Transfer of License & License Condition Agreed to Beco & Entergy Nuclear Generation Co ML20205Q9231999-04-15015 April 1999 Forwards Proprietary & non-proprietary Addl Info in Support of Request to Transfer of Plant FOL & Matls License to Entergy Nuclear Generation Co.Proprietary Info Withheld,Per 10CFR2.790 ML20205P9631999-04-15015 April 1999 Provides Attachments a & B in Support of Request for Transfer of Plant Operating License & NRC Matl License from Beco to Entergy Nuclear Generation Co as Submitted in Ref 1. Info Provided in Response to Request at 990413 Meeting ML20205H9281999-04-0707 April 1999 Requests Withdrawal of Uwua Locals 369 & 387 Unions Joint Intervention in Listed Matter ML20205F3731999-04-0202 April 1999 Submits Addl Info Provided in Support of Request for Transfer of Pilgrim Nuclear Power Station Operating License & Matls License.State of Ma Order Authorizing Divestiture & Copy of Financial Arrangement Encl ML20204H3771999-03-26026 March 1999 Informs That Local 387,Utility Workers Union of America,AFL- Cio Voted to Approve New Contract with Entergy Nuclear Generation Co & Voted to Accept Boston Edison Divestiture Agreement ML20205D4231999-03-24024 March 1999 Forwards Decommissioning Funding Rept for Pilgrim Nuclear Power Station,In Accordance with 10CFR50.75(f)(1) 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARBECO-90-108, Forwards Anticipated Operator Licensing Exam Schedule Requested by Generic Ltr 90-07, Operator Licensing Natl Exam Schedule,1990-09-12012 September 1990 Forwards Anticipated Operator Licensing Exam Schedule Requested by Generic Ltr 90-07, Operator Licensing Natl Exam Schedule, ML20059D6641990-08-30030 August 1990 Forwards Revised Emergency Plan Implementing Procedures,Per 10CFR50,App E,Section V.W/O Encl ML20059D6791990-08-30030 August 1990 Notifies That Two Remaining Actions for Implementation of SPDS at Plant Complete,Per .Spds Procedures Modified,Identifying Sampling Panel C-19 Return Valves to Operator BECO-90-100, Advises That Valve MO-1001-50 Cannot Be Shown to Meet 30-day Mission for PASS in post-accident Environ Due to Elevated Radiation Dose Rates.Util Currently Developing Solution to Allow PASS to Meet 30-day Availability Requirement1990-08-27027 August 1990 Advises That Valve MO-1001-50 Cannot Be Shown to Meet 30-day Mission for PASS in post-accident Environ Due to Elevated Radiation Dose Rates.Util Currently Developing Solution to Allow PASS to Meet 30-day Availability Requirement BECO-90-102, Forwards Fitness for Duty Program Performance Data for Jan- June 19901990-08-23023 August 1990 Forwards Fitness for Duty Program Performance Data for Jan- June 1990 BECO-90-095, Informs That Kn Taylor Permanently Reassigned to Nuclear Training Dept as of 900717.Taylor Will Remain in Position Which Does Not Require License Certification1990-08-0808 August 1990 Informs That Kn Taylor Permanently Reassigned to Nuclear Training Dept as of 900717.Taylor Will Remain in Position Which Does Not Require License Certification BECO-90-092, Forwards, Decommissioning Funding Rept, Per 10CFR50.33(k) & 50.75(b)1990-07-26026 July 1990 Forwards, Decommissioning Funding Rept, Per 10CFR50.33(k) & 50.75(b) ML20044B3111990-07-11011 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Corrective Actions Include Replacement of Transmitters Identified in Suspect Lots & Implementation of Surveillance Program ML20044A7891990-06-19019 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Table Listing Status of Each Issue Encl ML20043D7181990-05-31031 May 1990 Advises That Response to NRC 900426 Safety Evaluation Re Util 880804 & 890619 Responses to Generic Ltr 88-01 Will Be Sent on 901115 ML20043A8211990-05-15015 May 1990 Notifies of Change of Senior Operator Status for Cj Martin, Per 10CFR50.74.CJ Martin Will No Longer Participate in Licensed Operator Requalification Training Program ML20042F2211990-05-0101 May 1990 Advises That Scheduled Completion of SPDS Human Factors Validation Activities Scheduled for 900630 & Sys Availability Test by 900731 ML20043B3881990-05-0101 May 1990 Responds to Violations Noted in Insp Rept 50-293/90-05. Corrective actions:82 Excess Flow Check Valves Installed & Operability of Valves Verified by Performing Surveillance Testing ML20012F5601990-04-0202 April 1990 Responds to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment.Util Instituted Biofouling Control Program in 1982 & Program Has Been Effectively Implemented at Plant & Complies W/Generic Ltr ML20012F3631990-03-30030 March 1990 Requests Temporary Waiver of Compliance from Requirements of Tech Spec Table 3.2.C-1, APRM Upscale Rod Block in Startup & Refuel Modes to Avoid Unnecessary Delay in Critical Path Surveillance Testing ML20012C6501990-03-15015 March 1990 Responds to Generic Ltr 90-01 Re Request for Voluntary Participation in NRC Regulatory Impact Survey.Completed Questionnaire for Applicable Areas Delineated in Survey Encl ML20012D1931990-03-15015 March 1990 Forwards Proposed Scope & Objectives of Annual Exercise 90-04-B Scheduled for 900618 Per Lazarus 890609 Ltr, Emergency Exercise Objective & Scenerio Guidelines. Exercise Will Test & Evaluate Util EPIPs ML20012C7191990-03-14014 March 1990 Forwards Explanation of Errors in 890707 Application Re Corrective Action Plan & Advises That Errors Do Not Affect Technical Basis on Which Exemption Granted.Util Corrective Action Plan Remains Unchanged ML20011F5381990-02-26026 February 1990 Responds to Violations Noted in Insp Rept 50-293/89-12 on 891002-1119.Corrective Actions:On 891109,operations Personnel Directed,Via Night Orders,To Be More Diligent W/ Tagout Documentation & Boundary Tagging Clarified ML20011F2301990-02-23023 February 1990 Notifies of Change in Status of Senior Licensed Operator. DW Gerlits Terminated Senior Reactor Operator License on 900201 But Will Retain Position as Senior Sys & Safety Analysis Engineer ML20006G1411990-02-23023 February 1990 Advises That Tj Mcdonough Reassigned Effective 900126. Individual Will No Longer Participate in Licensed Operator Requalification Training Program ML20011F6521990-02-21021 February 1990 Forwards Inservice Insp Plan for 1990 mid-cycle Spring Outage for Facility.Augmented Insp Will Be Performed for Three IGSCC Category a Welds Using Guidance in Generic Ltr 88-01 & Criteria in NRC Bulletin 88-08,Suppl 3 ML20011F4481990-02-20020 February 1990 Forwards Revised Operability Evaluation of Salt Svc Water Pumps for Plant.Evaluation Concludes That Salt Svc Water Pumps Operable & Requirements of Tech Spec 3.5.B.1 for Pumps Met ML20006G0051990-02-20020 February 1990 Forwards Update to long-term Plan,In Accordance W/Section V.A of Plan for Long-Term Program. Util Implementing Plant Betterment Mods & Activities ML20011E7551990-02-0909 February 1990 Requests Temporary Relief from Tech Spec 4.7.A.2.b.1.d, Limiting Condition for Operation. ML19354E7661990-01-23023 January 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Bolting in Anchor Darling.... Review Determined That No Subj Anchor Darling Swing Check Valves or Similar Valves Installed at Facility ML20011F4441990-01-19019 January 1990 Forwards Operability Evaluation Re Salt Svc Water Pumps P208 B,C,D & E,Per 900117 Telcon.Evaluation Concluded That Salt Svc Water Pumps P208 B,C,D & E Operable & Tech Spec 3.5.B.1 Requirements Met ML20006A0761990-01-15015 January 1990 Forwards Executed Amend 10 to Indemnity Agreement B-48 ML20006A2591990-01-15015 January 1990 Responds to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Develop Program to Enhance Maint,Analysis & Testing Already Conducted on motor-operated Valves ML20005G7701990-01-11011 January 1990 Discusses Revised Schedule for Operability & Availability of Spds,Per 891221 Notification to Nrc.Rev Necessitated by Software Problems Affecting 891231 Schedule Projected in Util 890710 Ltr ML20005G7451990-01-11011 January 1990 Provides Bases for Environ Qualification of Instrumentation Monitoring Effluent Radioactivity & Status of Standby Power Per Reg Guide 1.97,Rev 3 & Generic Ltr 82-33 ML20005G8061990-01-11011 January 1990 Advises That Commitment to Complete Enhancements of Control Panels as Part of Dcrdr,Per NUREG-0737,Item I.D.1 by Oct 1989 Not Met.All Three Panels at Simulator Enhanced & Installation of Revised Meter Scales in Progress ML20005F0761990-01-0404 January 1990 Forwards Revised Inservice Test Program in Response to Generic Ltr 89-04.List of Inservice Test Program Relief Requests Previously Submitted & Acceptable,Per Generic Ltr 89-04,encl ML20005E5601989-12-29029 December 1989 Certifies That Util Has Established Fitness for Duty Program That Meets Requirements of 10CFR26.Drug & Alcohol Level Screening Match Rule Imposition & Implementation Will Be Effective on 900103 ML20042D4821989-12-26026 December 1989 Responds to Violations Noted in Insp Rept 50-293/89-10. Corrective Action:Radiological Section Standing Order 89-09 Issued Allowing Only Radiological Supervisors to Exercise Locked High Radiation Area Door & Key Control ML20011D6851989-12-14014 December 1989 Forwards Response to Generic Ltr 89-21, Request for Info Re Status of Implementation of USI Requirements. ML20011D1631989-12-14014 December 1989 Forwards Pilgrim Nuclear Plant Station Final Assessment Rept, Summarizing Results of self-assessments & Evaluations Conducted Throughout Implementation of Plant Restart Plan & Power Ascension Program ML19325F2751989-11-10010 November 1989 Responds to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded-Case Circuit Breakers. Util Installed H2/02 Analyzers Procured in 1980 & Therefore Exempt from Bulletin Requirements ML19327C0911989-11-0606 November 1989 Forwards Response to Suppl 3 to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Since cyclic- Thermal Heatup/Cooldown Not Present in Piping,Failure Due to Cyclic Thermal Fatigue Will Not Occur ML19325E8581989-11-0101 November 1989 Discusses Litigation Before FERC Re Plant.Util Will Undertake Review of Matls Developed by Opposing Parties in Proceedings.Required Repts Will Be Submitted to NRC After Reportability Has Been Determined ML19325E5251989-10-27027 October 1989 Responds to Generic Ltr 88-20,Suppl 1,describing Plan for Completing Individual Plant Exam for Severe Accident Vulnerabilities.Performance of Level 1 PRA Based on Current Plant Design & Operation Intended ML19325E5661989-10-27027 October 1989 Response to Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. Revised Inservice Testing Program Which Will Include Statement of Conformance to Technical Positions Will Be Submitted by 891215 ML19324B8191989-10-25025 October 1989 Informs That C Leonard & J Stokes Reassigned to Positions Which Do Not Require License Certification Effective 891003 & 891020,respectively ML19327B2291989-10-20020 October 1989 Responds to Generic Ltr 89-07 Re Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs.Changes Made to Contingency Plan,Per 10CFR50.54.Plan Withheld (Ref 10CFR73.21) ML19325E0981989-10-20020 October 1989 Responds to NRC Re Violations Noted in Insp Rept 50-293/89-07.Corrective Actions:Terminal Block Replaced, post-work Functional Test of Ref Temp Switches Performed & Procedure Tp 88-78 Revised to Correct Relay Numbers BECO-89-142, Responds to NRC Re Violations & Proposed Imposition of Civil Penalty from Insp Rept 50-293/89-95. Corrective Action:Two Responsible Util Operators Suspended Because Breakers Incorrectly Positioned for Test1989-09-22022 September 1989 Responds to NRC Re Violations & Proposed Imposition of Civil Penalty from Insp Rept 50-293/89-95. Corrective Action:Two Responsible Util Operators Suspended Because Breakers Incorrectly Positioned for Test BECO-89-144, Requests Interim Approval for Relief from Testing of RHR Sys Valves 63 & 64 Until Refueling Outage 8 Scheduled for 9103151989-09-22022 September 1989 Requests Interim Approval for Relief from Testing of RHR Sys Valves 63 & 64 Until Refueling Outage 8 Scheduled for 910315 BECO-89-135, Forwards Util Anticipated OL Exam Schedule,Per 890706 Generic Ltr 89-12 Request1989-09-11011 September 1989 Forwards Util Anticipated OL Exam Schedule,Per 890706 Generic Ltr 89-12 Request BECO-89-131, Forwards Tech Spec Figures 6.2-2 & 6.2-1,replacing Title of Director of Nuclear Engineering W/Title of Station Director & Adding New Title of Vice President of Nuclear Engineering1989-09-0505 September 1989 Forwards Tech Spec Figures 6.2-2 & 6.2-1,replacing Title of Director of Nuclear Engineering W/Title of Station Director & Adding New Title of Vice President of Nuclear Engineering BECO-89-129, Submits Addl Info Re 890707 Request for Exemption from Certain Containment Leakage Testing Requirements of 10CFR50. Plant mid-cycle Maint Outage,Previously Scheduled for Oct 1989,has Been Rescheduled for Spring 19901989-09-0101 September 1989 Submits Addl Info Re 890707 Request for Exemption from Certain Containment Leakage Testing Requirements of 10CFR50. Plant mid-cycle Maint Outage,Previously Scheduled for Oct 1989,has Been Rescheduled for Spring 1990 1990-09-12
[Table view] |
Text
-
v, x ;,>. ..
l
.osnw-s=
Pilgrim Nuclear Powe' station ;
Rocky Hdi Road ;
Plymouth, Massachusetts 02360 :
Ralph G. Bird I 5enior Vice President - Nuclear BECo 89-163 b 6, 1989 l U.S. Nuclear Regulatory Commission (
Document Control Desk i Hashington, DC 20555 License DPR-35 Docket 50-293 U
NRC BULLETIN 88-08, SUPPLEMENT 3: 1 i
THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMS This letter responds to Supplement 3 to Bulletin 88-08 requesting licensees to l note, within the original scope of review and reporting requireinents of -
Bulletin 88-08, that periodic valve seat leakage through packing glands could result in unacceptable thermal stresses in unisolable piping connected to Reactor Coolant Systems..
Boston Edison Company has reviewed the thermal stratification events described in the Supplement 3. As a result we have re-reviewed systems connected to Reactor Coolant Systems to determine whether unisolable sections of piping.can r be subjected to stresses from temperature stratification or oscillation that '
could be induced by periodic valve seat leakage through packing glands. Our review concluded Pilgrim Nuclear Power Station has ~ configurations similar to
. configurations discussed in Supplement 3. As such, we have enclosed our '
revised response to the Bulletin 88-08 describing the results of our review and planned actions.
R. G. Bird Enclosure HGL/amm/3501 Commonwealth of Massachusetts) -
County of Plymouth )
Then personally appeared before me, Ralph G. Bird, who being duly sworn, did
, state-that he is Senior Vice President - Nuclear of Boston Edison Company and p that he is duly authorized to execute and file the submittal contained herein L in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.
H My commission expires: C h C /996 A8 '
OATE p
] NOTARYPpLIC L cc: On next page p
~
.~B911150257 891106 7 PDR ADOCK 05000293 0 PNU , _ _ _
i.^ ' *- -
BOSTON EDISON COMPANY !'
Nov:mbar 6, 1989 O. S. Nuclear Regulatory Commission .
Page Two -
cc:. Mr. D. Mcdonald, Project Manager Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation ,
Mail'Stop: 1401 '
U. S. Nuclear Regulatory Commission 1 Mhite Flint North 11555 Rockville Pike Rockville, MD 02852 U. S. Nuclear Regulatory Commission Region I l 475 Allendale Road ,
King of Prussia. PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station 1
.r I '
l l
t
ENCLOSURE
. j NRC BULLETIN 88-08, SUPPLEMENT 3: I THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMS l
INTRODUCTION )
Supplement 3 to Bulletin 88-08 requested licensees to ncte periodic valve seat leakage through packing glands could result in unacceptable thermal stresses in l unisolable piping connected to Reactor Coolant Systems (RCS). This can occur when hot reactor coolant flows from the reactor coolant system in a horizontal run of piping to a leaking first isolable valve away fror the RCS. This could cause thermal stratification in the piping. Theconfigudtion,causingthermal '
stratification, as described in Supplement 3 is a closed gate valve located below the RCS leaking past the seat and through the packing gland.
The actions required by licensees within the scope of the Bulletin 88-08 are: *
- 1. Review all piping connected to the RCS to determine whether unisolable sections of piping connected to the RCS can be subjected to stresses from temperature stratification or temperature oscillations that could be induced by leaking valves.
- 2. For any unisolable sections of piping connected to the RCS that may have been subjected to excessive thermal stresses, examine nondestructively the welds, heat affected zones and high stress locations, including geometric discontinuities in that piping to provide assursnce there are no existing flaws.
- 3. Plan and implement a program to provide continuing assurance that unisolable sections of all piping connected to the RCS will not be '
subjected to combined cyclic and static thermal and other stresses that could cause fatigue failure during the remaining life of the unit.
SCOPE OF REVIEW This review examined all piping reviewed for the original scope to the Bulletin 88-08. The original review included all piping connected to the Reactor Coolant Systems. The piping configurations were reviewed to determine whether they meet the configuration described in Supplement 3 (i.e., the lines are below a hot RCS source, the line is normally stagnant, and there is a horizontal run of piping that could experience a stratified thermal condition if valve leakage was present).
Valve types considered that could leak and cause thermal stratification included gate, globe, safety and check valves. Leakage could occur at either the body / bonnet joint, stem packing gland, check valve hinge pin capscrews or check valve hinge pin packing glands.
Valve positions considered included the closed gate valve, open gate or globe valve, closed check valves and safety valves. Open valves are included because body / bonnet leakage and packing gland leakage in an open valve in a stagnant line could also cause thermal stratification.
The isolable piping considered consisted of piping between the hot RCS and the first closed valve away from the RCS (i.e., either a closed gate, closed globe or closed check valve). Piping beyond the first closed valve was not included '
in the review.
Page 1 of 4
,, -...w - , , - . , a .-, - , . . - . . - - , .n... .-,,,
I
....- . Valves in piping located above hst RCS systems were not censidered since the i
. . piping is always hot between the RCS and the valves. Boundary valves and open valves locateo in vertical pipe lines were not considered since this 1 configuration would cause uniform heating of the line as the hot water would i first displace the cold water if there were a leak in the valve. i Irstrument sensing lines (including sample lines) were not considered since they are 3/4" or 1" lines and any significant leakage would heat the entire ,
line.. Any small leakage would be noticed at the instruments and the leak I would be corrected. A small amount of leakage flow would cool as the energy associated with the small amount of leakage would dissipate before the leakage flow could rear.h the instrument.
Similarly, process drain lines are similar to the instrument lines and were '
not considered (i.e., they are small diameter (3/4", 1", 1-1/2" or 2") '
pipes). Since they are insulated and located close to the hot source piping, i the drain piping would be warm due to heat conduction from the process line.
Any leakage would result in a more uniform temperature in the line due to the small diameter of the line.
RESULTS OF REVIEW The review identified six configurations where the first isolable valve was in a stagnant horizontal line located below the Reactor Coolant System. They are:
- 1. RHR head injection line to check valve 1001-64 (4").
- 2. RHR return line to check valve 100-68A including open gate valve 100-33A (18"). -
- 3. RHR return line to check valve 1001-688 including open gate valve 1001-33B (18").
- 4. Core Spray (CS) Injection line to check valve 1401-9A (10").
- 5. Core Spray (CS) Injection line to check valve 1401-9B (10").
- 6. Standby Liquid Control line to check valve 1101-15 (1-1/2").
The standby liquid control valve 1101-15 was not considered for further i evaluation, as the configuration is similar to the process drain line (i.e., a l small line in close proximity to the hot source). ,
For the remaining 5 configurations, Action 2 of the bulletin requires an
- 1. examination of piping that may have been subjected to excessive thermal l stresses to assure that there are no existing flaws. There are ten welds in these 5 configurations. All ten welds are included in our IGSCC surveillance examination program (Generic Letter 88-01). The Core Spray and the RHR return line piping was replaced in 1984 as part of the IGSCC pipe replacement.
Page 2 of 4
r i.
1.- .
.The following are telds located in h:riz:ntal pipe runs that cight have been
.. "- subjected to thermal stratification.
VALVE # ISI ISOMETRIC RF0 #8 IGSCC ISI HELD NO.
RQS. INEPECTION STATUS REMARKS RHR HEAD IWJECTION LINE 1001-64 ISI-I-10-5A 10-HS-18 Scheduled 10-HS-19 Scheduled RHR A LIE 1001-68A ISI-I-10-1 10R-IA-5 Scheduled High stress 1001-33A 10R-IA-6 10R-IA-7
- RHR 8 LINE 1001-68B ISI-I-10-l' 10R-IB-5 Inspected in RF0 #7 High stress 1001-33B 10R-IB-6 Not Scheduled 10R-IB-7 Not Scheduled CS A LItiE 1400-9A ISI-I-14-1 '14R-A-13 Added to schedule L CS B LINE l
L 1400-98 ISI-I-14-1 14R-B-13 Added to schedule l'
Subsequent inspection will be performed based upon the results of scheduled examination of weld #10R-IA-5.
CORRECTIVE ACTIONS L
EXAMINATION OF WELDS l For the 5 unisolable lines (10 welds) that might be subjected to thermal stratification, the Core Spray and RHR A and B return lines (8 welds) were part_of the IGSCC pipe replacement.
'~
Valve 1001-68B experienced a seat leak in 1985 which may have caused that piping (RHR B return) to have been subjected to excessive thermal stresses.
One of the highest stress welds in this line is weld 10R-IB-5. No flaws were identified when this weld was examined during RF0 #7. Therefore, the 10R-IB-6 ,
.and 7 welds are not. scheduled for examination in RF0 #8. One of the highest i L stress welds in the RHR A return line,10R-IA-5, is scheduled for examination l in RF0 #8. If this examination indicates any flaws in the weld, the other two susceptible welds in the line will also be examined. j l: RHR head injection line check valve 1001-64 experienced shaft leakage which !
has been repaired. This leakage may have subjected that piping to excessive !
'.L thermal stresses. Helds 10-HS-18 and 19 are scheduled for examination in RF0 l #8. Core Spray A and B line welds 14R-A-13 and 14R-B-13 may also have been I subjected to excessive thermal stresses and have been added to the RF0 #8 l IGSCC Inspection Schedule.
Page 3 of 4 l
L u -
t
. . . The IGSCC exaninaticns are a high. sensitivity weld examination and are
. . conducted with experienced personnel qualified under the EPRI/NRC/BHROG NDE '
coordination plan for IGSCC Research. This is the type of examination which ,
will be performed on the welds. This meets the requirements of Supplement 2 of IEB 88-08.
In summary, the additional review of the welds due to Bulletin 88-08 Supplement 3 requirements resulted in two additional welds to be examined during the next refueling outage.
CONTINUING PROGRAM (Post RF0 #8)
Bulletin 88-08 requires the continued assurance that all unisolable sections of piping connected to the RCS not be subjected to coQined cyclic and static thermal and other stresses that could cause fatigur a'.ure during the remaining life of the plant. For P11 grim Station W -7ected configurations are those with check valves as the isolation valve. Ths,e valves do not exhibit a cyclic thermal fatigue by the heating / cooling of the valve seat, but instead will leak continuously once leakage starts. The metal will " wire i draw" or the gland material will deform and will not reseal once leakage has begun. Therefore, without a cyclic thermal heatup/cooldown present in the piping, failure due to cyclic thermal fatigue will not occur.
For thermal stratification conditions, higher stresses in the piping could occur. As a result, this condition will be assessed by inspecting the valves noted a!ove during subsequent refueling outages for evidence of external leakage. If leakage is found, then the welds associated with the valve will be examined to determine if flaws have been introduced by the thermal stratification condition. ,
l~
i l
l L
L l
l
\ r L
Page 4 of 4 1
1
- v. -
y, s *
SUMMARY
IEB 88-08 SUPPLEMENT 3 THERMAL STRESSES IN PIPINO CONNECTED TO REACTOR COOLANT SYSTEMS Supplement 3 to IEB 88-08 requested that licensees note that seriodic valve !
seat leakage through packing glands could result in unaccepta:1e thermal stresses in unisolable piping connected to the reactor coolant systems. This leakage could lead to thermal stratification in the piping when a thin layer of hot water flows in the top segment of the pipe, from the hot reactor coolant system to a leaking valve.
The original bulletin identified a thermal stratification condition caused by higher pressure cold water leaking past a valve. This lead to a thin layer of cold water flowing in the bottom segment of the pipe, from higher pressure system to the reactor coolant system.
Supplement 3 further identifies a cyclic pipe thermal condition caused by intermittant flow through a gate valve. Intermittant flow occurs when the hot water flows through a gate valve. Intermittant flow occurs when the hot water
- leaks past the seat and through the gland, warms the valve causing the valve to heat up, expand, seal tight and then stop the seat leakage. The valve then cools, contracts, loosens the seal and starts to leak again, i Per the original bulletin requirements, licensees are required to review systems connected to the Reactor Coolant System to determine whether ;
unisolable sections of piping connected to the RCS can be subject to stresses i from temperature stratification or temperature oscillations that could be induced by leaking valves, and that were not evaluated in the design analysis of the piping.
All connections to the Pilgrim Reactor Coolant System originally reviewed per the bulletin requirements were reviewed to determine if any unisolable !
portions of piping could be subject to the thermal conditions described in l Supplement 3 to IEB 88-08.
There were five configurations identified in the review which met the
(. configurations identified by Supplement 3. These are: ;
- 1. RHR return valve 1001-68A and valve 1001-33A (18")
- 2. RHR return valve 1001-68B and valve 1001-33B (18") -
- 3. RHR head injection valve 1001-64 (4")
- 4. Core Spray Injection valve 1401-9A (10")
- 5. Core Spray Injection valve 1401-9B (10")
L Note: Valve 1001-68B had a seat leak in 1985. 1 All five isolable valves are check valves. Four are tilting disc check valves j with hinge pins and packing glands and one is a swing check valve, with a l hinge pin and gasketed cap screw. Two valves are normally open gate valves in I the RHR return lines. The possible leak path considered is ei'her a leak thru the packing gland, cap screw or a body bonnet leak. In any cue the leak is continuous as no mechanism is identified to cause the leak to stop.
1
I . ; . :. . ;
- 'Ttiere tere no configurations identified in the review that would meet the ;
- Supplement 3 requirements which included close gate valves as the first valve away from the Reactor Coolant System.
Therefore for the Pilgrim Nuclear Power Station there are no conditions identified Awhich could cause a cyclic sipe thermal condition caused by '
leakage through a gate valve seat and pacting gland. There are five cases identified where: thermal stratification is possible, J If configurations are identified that may have been subjected to stresses from temperature stratification or temperature oscillations, the bulletin requires that the piping'be inspected to determine if there are any flaws. In addition I a program is required to be implemented to 3rovide continuing assurance these l configurations not be subjected to static tiermal stresses that could cause 1 fatigue failure during the remaining life of the unit.
l The piping other than the RHR head injection piping was all replaced in 1984 "
as part of the IGSCC piping replacement. This piping has seen only one operating cycle. It is subject to inspet.; ion as part of the IGSCC ,
surveillance program. Boston Edison will inspect the piping as a part of the !
IGSCC program (GL 88-01) during the next refueling outage. This amounts to I ten (10) welds.
l l Boston Edison will implement a program of inspection and analyses of the welds l to provide continuing assurance that fatigue failure will not occur during the l
remaining life of the unit. This program will be implemented prior to the end i of the next refueling outage. The program will consist of a visual l L examination of the seven noted valves for indication of any external leakage I at the packing gland, capscrew and at the body bonnet joint. If there is i a indication of leakage, then additional inspections (UT) will be performed on l the effected piping per the requirements of the bulletin. The UT exa iinations L
may be combined into the scope of the IGSCC Surveillance program.
Per IEB 88-08 Supplement 2, enhanced ultrasonic testing (UT) and experienced i examinetton personnel are required to detect cracks in stainless steel piping. All of the examinations that will be performed are on piping required to receive IGSCC examinations. This is a'i enhanced examination performed by experienced personnel and thus meets Supplement 2 requirements.
I' This UT examination will be performed on the piping identified by the visual I examination as having experienced external leakage at the packing gland, cap screw or body bonnet joint.
L 1. The cost of visual or UT inspection is $5000/ Held. Due to Bulletin CQSI: s requirements only two (2) weldt will be added to the IGSCC Schedule i and two additional velds would be inspected if an already scheduled IGSCC weld Indicates any problem. The total cost for inspection will be either $10,000 or $20,000 for RF0 #8 and thereafter, for cach subsequent refueling outages. These expenses will be included in the IGSCC Scope of Hork by QA/QC.
- 2. If weld failures are detected, the cost for subsequent analysis, L potential weld / pipe / valve replacements are not estimated. Such l costs should be included in the expense contingency budget.
- 3. NED is considering the entire scope of inspection requirements which include IST, ISI & IGSCC. The budget considerations for this scope of work is being addressed.