Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Corrective Actions Include Replacement of Transmitters Identified in Suspect Lots & Implementation of Surveillance Program
ML20044B311
Person / Time
Site: Pilgrim
Issue date: 07/11/1990
From: Highfill K
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-90 BECO-90-085, BECO-90-85, IEB-90-001, IEB-90-1, IEIN-89-042, IEIN-89-42, NUDOCS 9007180327
Download: ML20044B311 (17)


Text

. . _ .

1

. I

.r ,

g nosron a sou '

Pilgrim Nuclear Power Station j Rocky Hdi Road '

Plymouth, Massachusetts 02360 l I

J q

g);, g , BECo 90-085 Vce Presttent, Nuclear operations July 11, 1990 l

U.S. Nuclear Regulatory Commission i Document Control Desk Nashington, DC 20555 License DPR-35 I Docket 50-293 I I

NRC BULLETIN NO. 90-01: 1 LOSS OF FILL-0IL IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT Bulletin 90-01 identified safety concerns associated with the failures of ,

Rosemount transmitters, Models 1153 Series B, Series D, and Model 1154, due to j leakage of fill-oil. The Bulletin requested licensees to ident*fy these models i that are currently utilized in safety-related systems and systems installed in l accordance with 10CFR50.62 (ATHS Rule). The Bulletin also requested licensees i to complete specific actions and provide a response stating the completion of 1 actions within 120 days of receipt of the Bulletin (i.e., July 16, 1990). This )

letter provides Boston Edison Company's response to that request. '

The safety concerns associated with the failures of Rosemount transmitters were identified in NRC Information Notice (IN) 89-42 and four Rosemount Technical Bulletins. As an action item of our Operating Experience Review Program, we identified all Rosemount transmitters, Models 1153 Series B, Series D, and Model 1154, with a manufacturing date prior to July 11, 1989, that were installed in safety-related and ATHS systems at Pilgrim Nuclear Power Station.

In addition, we participated in the BHR Owners Group activities to further investigate failure mechanisms and to develop generic resolutions. He also implemented corrective actions based upon the recommendations included in IN

'89-42, Rosemount Technical Bulletins and BHROG generic resolutions. Upon  ;

receipt of the NRC Bulletin, we reviewed, revised, and completed the previously implemented actions for compliance with the Bulletin requirements.

A list of the Rosemount transmitters described above that are utilized at Pilgrim Nuclear Power Station and details of corrective actions taken to complete Bulletin action items 1, 2, 3, 4 and 5 are provided as an enclosure to this letter. The enclosed list includes transmitters manufactured after July 11, 1989. The corrective actions include replacement of transmitters identified in the suspect lots, development of a basis for continued operation, and implementation of an enhanced surveillance program.

i 9007180327 900711

,{DR ADOCK 0300 3 IQ

. 00STON EDISON COMPANY

  • , July 11, 1990 U.S. Nuclear Regulatory Commission Page 2 NRC Region 1 inspectors have performed a preliminary review of actions taken by l

Boston Edison Company in response to Bulletin 90-01. The inspectors found our program to be effective in that it identified loss of fill-oil in transmitters-from previously unsuspected lots. These findings are identified in the Inspection Report No. 50-293/90-07, dated May 31, 1990.

HGL/jmm/4436 l' Enclosure l

Commonwealth of Massachusetts)

County of Plymouth )

Then personally appeared before me, K. L. Highf111, who being duly sworn, did l

state that he is Vice President - Nuclear. Operations of Boston Edison Company and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.

My commission expires: OMS #95' DATE' L (

NOTARY PUBLIC i

l cc:- Mr. R. Eaton, Project Manager l Division of Reactor Projects - 1/II i

Office of Nuclear Reactor Regulation Mail Stop: 1401 U. S. Nuclear Regulatory Commission l l' White Flint North l 11555 Rockville Pike Rockville, MD 20852 i

U. S. Nuclear Regulatory Commission l Region I l 475 Allendale Road l King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station Alex Marion, NUMARC i

ENCLOSURE 1

BOSTON EDISON COMPANY RESPONSE TO NRC BULLETIN 90-01: I LOSS OF FILL-0!L IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT i Bulletin 90-01 requested Licensees to promptly identify and take appropriate corrective actions for Models 1153 Series B, Series D, and Model 1154 Rosemount i transmitters that may be leaking fill-oil. The Bulletin required specific actions to be completed within 120 days of receipt. He received the Bulletin  ?

on March 19, 1990 and a response under the provision of 10CFR50.54(f) is due by '

July 16, 1990. The Bulletin action items, which are paraphrased, and BECo corrective actions are described below. '

flylletin Action #1 [

Licensees must identify by location all Model 1153 Series B, Series D and Model 1154 Rosemount transmitters that are manufactured before July 11, 1989. This t list must include all safety related applications and ATHS systems.

Resoonse i Boston Edison has compiled the attached "Rosemount Transmitter Performance ,

Tracking List" of Model 1153, Series B transmitters susceptible to the fill-oil leakage problem that are in service at Pilgrim Station in safety-related i applications. There are no Model 1153, Series D or Model 1154 Rosemount transmitters in service at Pilgrim Station. Pilgrim Station's ATHS system currently uses Model 1151 transmitters. Since these transmitters are not susceptible to the fill-oil leakage problem they are not included in this list. l The list has been alphabetically sorted by instrument tag number. Each ,

instrument tag number is accompanied by the service description, model number, serial number, date in service, and relevant information.

This list includes " time at pressure" data (psi-month status) and operability acceptance criteria. The acceptance criteria is viewed as a " flag" for further i assessment of transmitter performance (see response to Bulletin Action #3).

Bulletin Action #2 ,

Licensees are requested to identify all applications where high failure fraction (suspect lot) transmitters are utilized. Recommendations are given to  ;

avoid utilizing these high failure fraction transmitters in the Reactor Protection or Engineered Safety Features Actuation Systems. Licensees are requested to develop and implement a program to replace transmitters installed in these applications at the earliest appropriate opportunity.

Response

The suspect list provided by Rosemount Inc. on December 22, 1989 was used to identify safety cpplications that currently use high failure fraction transmitters. From the suspect list, only 3 transmitters presently remain in service at Pilgrim Station. All other transmitters from suspect lots have been

l .

removed and repaired or will be returned to Rosemount Inc. for repair and upgrading i The 3 transmitters (PT-503A, B and D) monitor main condenser vacuum. These transmitters have been in service for approximately one year and show no signs of the fill-oil leakage problem. Documentation has been developed supporting continued plant operation with these transmitters in service as requested by NRC Bulletin 90-01. He do not plan to replace these transmitters unless perforirance degrades.

Bulletin Action #3 A review of plant records for each transmitter susceptible to the oil leakage ,

issue is requested. This review is intended to identify any of those i transmitters which may._have aircady exhibited symptoms-indicative of' fill-oil i fluid loss. Licensees'are also requested to develop appropriate operability j.

acceptance criteria and initiate corrective actions for each application where  :

transmitters operating performance does not conform to the operability  !

acceptance criteria.

Resoonse 1

{

He have. reviewed plant records for Rosemount transmitters at Pilgrim Station that are susceptible to the fill-oil leakage problem This review identified several_ transmitters-in var,ious stages of oil leakage (as seen by operating trends and the. amount of instrument calibration shift). Each of the transmitters-that exhibited symptoms of oil leakage has since been replaced.

Operability acceptance criteria for each transmitter application has been established utilizing data from Rosemount Technical Bulletin #4 and BHROG guidance. Each transmitter is presently operating within the acceptance criteria and applicable technical specifications. -The operability acceptance i criteria is shown in the attached "Rosemount Transmitter Performance Tracking" i list as' lower and upper drif t limits (expressed in Engineering units). . This 1.ict also provides a historical database fr each transmitter installed for a  !

- specific application. A brief reason for : 9;.' ament is provided.

Bulletin Action #4 Licensees are-requested to implement an enhanced surveillance program for monitoring the operational performance of each transmitter susceptible to the fill-011' leakage problem. This monitoring program should consider the

-following actions or equally effective actions, q

(A) Ensure appropriate personnel are aware-of th6 symptoms that a' transmitter may exhibit during operation or-during calibration if it is ey.periencing a. loss of fill-oil. Personnel must also be encouraged to support the need for early identification and prompt action for any transmitters exhibiting symptoms.

(B) Enhanced transmitter monitoring to identify sustained transmitter s calibration drift.

(C) . Review of transmitter performance following planned or unplanned plant transients to identify sluggish transmitter responses.

-,+

(D)&(E) Develop and' implement a program which monitors process noise to detect possible changes in the operational performance of each applicable transmitter.

(F) Develop appropriate operability acceptance criteria for each transmitter susceptible to the fill-oil leakage issue. Transmitters identified as giving exhibited symptoms indicative of fill-oil loss that=do not conform to the operability acceptance criteria and are not in the technical specifications should be replaced.

Resoonse Pilgrim Station implemented a preliminary enhanced monitoring program upon receipt of Rosemount Technical Builetins and in response to BHROG generic resolutions. The primary intention of this program was to identify symptoms related to the fill-oil leakage problem. Routine monitoring of susceptible transmitters in high pressure applications (i.e. 1250 psi) has occurred under the direction of Pilgrim Station Instruction, SI-SG.1020, " Systems. Engineering Division Trending Guidelines". The monitoring program was revised in accordance with NRC Bulletin 90-01 requirements by adding transmitters in Icw-pressure ~ applications.

There are a total of 73 Model 1153 transmitters in the currently implemented monitoring program. The monitoring program consists of operational data trendings, calibration data trendings, and process noise analysis including sluggish transmitter responses. Also, operability acceptance criteria for each transmitter application has been established (see Response to Bulletin Action

  1. 3).

Pilgrim Station has also included in the operations and maintenance training programs, details regarding fill-oil leakage failures and symptoms. Licensed operators.and instrument control technicians have been trained.

The-present' enhanced monitoring program used at Pilgrim Station has been effective in identifying cases of transmitter fill-oil: leakage. A total of 5 transmitters have been identified as showing symptoms using these methods of-monitoring- These 5 transmitters have since been replaced without any new

. observed cases. Each of the 5 defective transmitters will be returned-to Rosemount Inc. for evaluation and repair. This program will continue until resolution is achieved.

Bulletin Ar< tion #5 Document and maintain in accordance with existing plant procedures a basis'for continued plant operation covering the time period from the present until such time that the Model 1153 Series B,1153 Series D, and Model 1154 transmitters a from the manufacturing lots that have been identified by Rosemount as having a high failure fraction due to loss of fill-oil in use in the reactor protection or engineered safety features actuation systems can be replaced. In addition, if. transmitters exhibiting symptoms indicating loss of fill-oil are identified, the. bases for continued plant operation should be updated to address these transmitters covering the time period from the time these transmitters are identified until such time that these transmitters can be replated.

l

_a h-_

v .

1 3

.)

3 Resoonse As' stated in our Response to Bulletin Action #2, only three (3) transmit'ters . {

from the suspect list currently. remain in service. He have implemented a basis for continued plant operation covering these. transmitters. Additionally, these-transmitters are being monitored as explained in response to Bulletin Action #4 .

and'to date have not shown symptoms indicative of loss of fill-oil. As'a- '

result ~of our enhanced surveillance program, if additional transmitters.with .

symptoms indicative of loss of fill-oil are identified, appropriate corrective'  !

actions will be implemented. Also, transmitter failures will be reviewed for i reportabil.ity.

j k

r l

! .- s L

L 1

e, l

1

m m

~q w .

ROSEMOUNT TRANSMITTER PERFORMANCE TRACKING . LIST: J This oata base consist of all Rosemount Transmitters currently used at Pilgrim Station which we susceptible to the oil leakage issue 1 addressed in NRC Info Notice 90-42 and NRC Bulletin 90-01. This list is intended to summarra many areas of importance which -

relate to oil leakage issue and provide a brief and accurate history of each appilcation. Up6 ' a this database will occur frequently.

User's should be aware of the last update which is published on the top of each page. Provh Miow is a detailed explanation for each category.

Instrument Number Plant assigned identification number derined by specific app 1! cation.

Description:

Name for the process that is being measured.

Model Number Method of identification assigned by manufacture which denotes specific characteristics of transmitter (i.e. type, range, options, etc.)

Serial Number Unique number assigned to each transmitter by manufacture for later identification or tracking.- In the applications more than one serial number appears for any one instrument, the first serf al number (top) given will be the original transmitter !nstalled. Each succeeding serial number represents the next transmitter that was/is being used in that application. (i.e.' bottom serfal number represents the currently used transmitter).

Notes next to Serial (i) = These transmitters are from manufacturing lots that have been identified by Rosemount '

Number as having a high failure traction due to loss of fill-oll.

(2) = This transmitter is from high f ailure traction lot, but has been repaired.

Date in Service: Date indicates when transmitter was installed and the date it was removed. These two dates only apply to the transmitter serial number shown immediately to the lef t. Areas where dotted lines L .) appear represent currently usec transmitter.

Potential Part 21 Problem: Used as a quick reference.to identify which transmitter is/was susceptible to oli leakage issue.

(Notice LT-263-73B seria1 number 412707 was f abricated before April 21,1989 which included it as a Part 21 concern. Recent repairs made to S/N 412707 corrected this deficiency.

L _ _ . _ _._ ___._ _ _ _ _ __ __ _

_ t &

^

Page 2 . _

Rosemount Transmitter Performance Tracking '

Y~. = Transmitters manufactured prior to July 1 l',1989. These transmitters have been identified by Rosemount via Part 21 letter as being susceptible to the fill-011 leakage problem.

"N" = Transmitters manuf actured af ter July 11,1989. Rosemount has indicated that these-transmitters are not susceptible to fill-oll leakage problem.

PSI-Months and Values represent approximate accumulated time at pressure. The first value given represents months Operating Days: at pressure (example,1000 PSI for 30.4 days = 1000 PSI months). The second value provided represents total accumulated days at pressure. Caution: these days are updated frequently and t,re subject to change as updates are performed.

Reason for Replacement: Provides for a very brief description for replacing this transmitter. (i.e. Impurites:Identlites cases v'ere f ailure symptons appeared to be related to the impurities in the oli, leaking oil:

Identifies cases were failure symptoms appeared to be related to oil leakage issue PDC - --:

Identifies design changes).

Calibration Range Values provided _ indicate calibration range for an output from 4 milliamps to 20 milliamps.

)

Down Factor: Range down factor = upper range limit of transmitter dh Ided by calibration pressure span.

Lower Drif t Limit: Limits used to identify the maximum allowable drif t transmitter.

Upper Drif t Limit: Can experience over it's operating I;fe before response time degredation occurs.

Reference Document: Documents used to identify fattures or Maintenance Requests requiring replacement.

_ _ _.2

= _ 4 u _~ _ _ --

ER Last update 5-31-90 1 OF D -

  • -* T ISE" LIMITS
  • ARE BASEDON pp ,

Poten6el . LOWER &

PART 21 REASON UPPER

- INSTRUMENT Date in PSI-MONTNS FOR . Colitwetion 1 DfMFT' REFERENCE Computer M no. Y/M %m-

-NUMBER DESCR H ON Model No Service (operating days) REPLCEMENT- Menge LfMf7S DOCUMENTS Point h

' DPT261-2A Main Steam 1153DB7RCN0012 412863 :Y 9/87-6/89 1583 ~50) WPURITIES 0-148.125 PSID LDL -2.4 PSI FSM89-219 ATSO22 Une Flow .

'418324 Y 6/89-3/90 7738 (238) LEAKNG OIL UDL 329 PSI MR90-45-25 '

1153DB7RC 410571 Y 3/90-' ..- 1041 (31) RDF=2.025 -

DPT261-2B Main Steam 1153DB7RCN0012 412864 Y 9/87 . . . . 10353 (319) 0-148.125 PSID LDL -2.4 PSI MR90-45-51 ATS026 Une Flow UDL 3.29 PSI RDF=2.025 DPT261-2C Main Steam 1153DB7RCN0012 412865 Y 9/87 . .. . 10353(319)- 0-148.125 PSID LDL-2.4 PSI MR90-45-50 ATS024 Une Flow UDL 329 PSI RDF=2.025 DPT261-2D Main Steam 1153DB7RCN0012 412866 Y 9/87-3/90 9312 (288) LEM(NG OL 0-148.125 PSID LDL -2.4 PSI MR90-45-52 ATS028 Une Flow 0500645 N 3/90 .. . . 1041(31) UDL 329 PSI RDF=2.025 DPT261-2E Main Steam 1153DB7RCN0012 412867 Y 9/8 7 ... .. 10353 (319) 0-148.125 PSID LDL- 2.4 PSI MR90-45-49 ATS030 Unte Flow UDL 329 PSI RDF=2.025 DPT261-2F Main Steam 1153DB7RCN0012 412868 Y 9/87-8/89 3712 (116) MPURITIES 0-148.125 PSID LDL - 2.4 PSI FSM89-323 ATS034 Une Flow 412949 Y 8/89 .. .. 6590 (203) UDL 329 PSI M R90-45-48 RDF=2.025 DPT261-2G Main Steam 1153DB7RCN0012 412869 Y 9/87 . . . .10353 (319) 0-148.125 PSID LDL 2.4 PSI MR90-45-47 ATS032 Une Flow UDL 323 PS'.

RDF=2.025 DPT261-2H Mah Steam 1153DB7RCN0012 412902 'Y 9/87.. . 9312 (288) IMPURITIES 0-148.125 PSID LDL - 2.4 PSI MR90-45-42 AT'h 36 Une Flow 412899 Y 1041 (31) UDL 329 PSI RDF=2.025 DPT261-2J - Main Steam - 1153DB7RCN0012 418337 Y 9/87-1/90 6752 (211). LEAKING OIL 0-148.125 PSID LDL- 2.4 P!f FSM90-18 ' ATS038 Une Flow :412900 Y- 1/90..... ... 3543 (108) ' UDL 329 PSI RDF 2.025 r _- , . . - _ .

Last update M1-90 2 OF 9

.- IMITS" BASEDON PERF TR Potendel LOWER &

  • SON UPPER PART 21 f*SI-IBONTHS - FOR Colh DRIFT . REFERENCE' Cassposer Doce k, IOSTRUMENT DESCMPTION Seriet no p,,m YIN , service (operating deys) REPLCEMENT Range LNBETS DOCUlBENTS Point w

.: NUMBER Model No Y LEMONG OIL 0-14e.125 PSID LDL -2.4 PSI MR90-45-43 ATS042 Main Steam 1153DB7RCN0012 412901 9/87-3/90 9312 (298)

DPT261-2K UDL 329 PSI Une Flow 0500783 N 3/90 .... .. 1041(31)

RDF-2.02S 0-148.125 PSfD LDL-2.4 PSI FS M89-383 ATS040 Main Steam 1153DB7RCN0012 412902 Y .9/87-10/89' 5120 (160) ' NPURITIES DPT261-2L N UDL 329 PSI Une Flow 0500030 10/89 _ 5233 (160)

RDF-2.025 Y 9/87 .... . 10353 (319) 0-148.125 PSID LDL -2.4 PSI MR90-45-44 ATS044 DPT261-2M Main Steam 1153DB7RCN0012 412948 UDL 329 PS8 Une Flow RDF-2.025 NPURITIES 0-148.125 PSID LDL -2.4 PSI FSM89-110 ATSO46

- Main Steam 1153DB7RCNOO12 412949 Y '9/87-3/89 195 (6)

DPT261-2N UDL 329 PSI Une Flow 418336 Y 3/89 .-... . 10.206 (313)

RDF-2.025 Y 9/87 10,353 (319) 0-148.125 PS!D LDL -2.4 PSI MR90-45-46 ATS050 DPT261-2P Main Steam 1153DB7RCN0012 412950 ..

UDL 329 PSI L Une Flow RDF-2.025 Y 9/87.. 10.353 (319) 0-148.125 PSID LDL -2.4 PSI MR90-45-45 ATSO48 DPT261-2R Main Steam 1153DB7RCN0012 412951 ..

UDL 329 PSI Une Flow RDF-2.025 0-148.125 PSID LDL -2.4 PSI MR90-45-55 ATS052 Main Steam ' 1153DB7RCN0012 412952 Y 9/87-3/90 9312 (288)

DPT261-2S UDL 329 PSI Une Flow 0500670 N 3/90- . 1041 (31)

RDF-2.025 Y 0-797.4* Hr0 LDL -77.6"H2O STANDBY RHR002 FT1049A RHR DISCH 1153DB6PC 407376 6/22/84 . .

SBWICE UDL 942SH2O EADER RDF-3.48 Y 0-797.4* Hao LDL -77.6"H2O STANDBY RHR004 FT1049B Rift DISCH 1153DB6PC 406405 6/21/84 . .

SemCE UDL 9425"H2O RDF-3.48

y s

"* THESE *LMITS* ARE BASED ON ,

, Last Wile 5-31-90 ' 3 OF 0 Potenses - LOWER &

PART 21 REASON- UPPER -

' INSTRUMENT ' ' Dees in PSl 7ESONTNS FOR CeHtwation DR9FT " REFERENCE Cesupuser EUNSER. DESCR N N gog,g gg, , M no. ProhYtw service . (operating days) REPLCEMENT ftonge LIISITS DOCUMEstTS Point seusneur .

FT1360-4 RCIC PUMP 1153DB5PC 407379 N ~ 2/1/34 ...... 0-346.8* H2O LDL -6.00*H2O STANDBY RC8010 OtSO4 UDL 10.89*H2O SEFM E RDF=2.16 FT1461A CX)RE SPRAY 1153DBSPC 407377 Y 2/1/84 . 0-299 7 H2O LDL -5.98*H2O STANDBY CSP 002 PUMP DISCH UDL 10.86H2O SERVICE RDF=2.506 FT14618 CORE SPRAY 1153fB5PC 407378 Y 2/1/84 . ... 0-299 7 Hr0 LDL -5.98*H2O STANDBY CSP 004 PUMP DISCH UDL 10.86*H2O SE7MCE RDF=2.506 FT2358 HPCI PUMP 1153DB5PC 407380 Y 6/1/84 ... . 0.- 297.3* H2O LDL -6.01*H2O STANDBY HPC010 DISCH UDL 10.88*H2O SERVICE RDF=2.52 LT 302-82A Scram Disch. 1153DB4PG 409039 Y 10/15/84 .. 9.5 - 85.5* H2O LDL .75 H2O <250 PSI Vol Level UDL 2.25H2O RDF-1.97 I

LT 302-82B Scram Disch. 1153DB4PG 409038 Y 10/11/84 . 9.5 - 85.5* Hr0 LDL - 75H2O <250 PSI VolLevel UDL 2.25H2O RDF-1.97 1

LT 302-82C Scrrn Disch. 1153DB4PG 409037 Y 10/11/84 . 9.5 - 85.5* H2O LDL .75 H2O <250 PSI VolLevel UDL 2.25 H2O RDF-1.97 LT 302-82D Scram Disch. 1153DB4PG 409038- Y 10/11/84 .. 9.5 - 85.5* H2O LDL .75 H2O <250 PSI I Vol Level UDL 2.25 H2O RDF-1.97 LT 5008 Cor.r. Wtr. 1153DB5HCN0012 418147' Y 5/2/89 . ... 282 (394) 372.2-20.3 LDL-11.121NCH <250 PSI DRY 132 Level *H2O UDL 6.12 NCH RDF=2.13

c. m ,+ ,,

~

A E Last updele 5-3190 4OF9

' *" THESE11MITS" ARE fMSEDON~ ,

ZETO SHIFT OP4.Y LOWER &

  • Fotentlef REASON UPPER PART 21 FOR- DenFT REFERENCE Cesepester PSB-MONTHS Costamselon INSTRUISENT DESCRIPTION Isodel No W no. pwm v/M

.' . Does in service (operosing days) REPLCEMENT Range LMetTS DOCUMENTS P*1Rt h NUMBER' 34828 - LDL -11.4 INCH RXXO74 Rx War Lvl 1153DB5 370e48 Y 2 '8 2 . ... . '48.621 (1.516)

LT1001-650A 80.14* Hz0 UDL 6.3 NCH 2/3 CORE RDF=2.60 COVERAGE .

34727 - LDL -11.4 INCH ' RXXO76 LT1001-6500 Rx War Lvl 1155DB5 370849 Y 3/82 ... .. . 48.621 (1.516) 59.12* H2O UDL63 INCH 2/3 CORE RDF 2.62 COVEfWGE ,

113.01 - LDL -2.951NCH ATS002 Rx. Level 1153DB4RCN0012 412605 Y' 7/87 . . 10.353 (319)

LT263-57A 42.95* H2O UDL 123 NCH RDF=2.14 Y 7/87-3/90 9.262 (285) 28 PURITIES 113.01 - LDL -2_95 NCH F&M90-15 ATS006 LT263-578 Rx. Level 1153DB4RCN0012 412606 42.95* Hao UDL 123 NCH 412361 Y 3/90 .. ... 1.106 (33)

RDF=2.14 Y 5/88-9/89 3.261 (103) SAPURITIES 113.09 - LDL -2.95 tNCH F&M89-300 ATS004 LT263-58A Rx. Level 1153DB4RCN0012 418361 43.04 Hz0 UDL123 NCH F&b89 400 Y 9/89-11189 1.202 (37) IMPURITIES 418907 (1) RDF=2.14 418710 Y 11/89 ... 1.041 (31) 113.09 - LDL -2.95 NCH ATS006 Rx. Level 1153DB4RCN0012 41260s Y 7/87. . . . 10.353 (319)

LT263-588 43.04* Hz0 UDL 123 NCH RDF=2.14 Y 7/87-3/90 9.312 (288) LEAKNG 1 3.01 - LDL -2.95 INCH M R 90-45-24 ATS010 LT263-72A Rx. Level 1153DB4RCN0012 412601 42.95* H2O UDL 123 NCH 1153DB4Rc 4ross7 Y 3/90 . .-.. 1.041(319)

RDF=2.14 113.09 - LDL -2.95 NCH ATS016 Rx. Level 1153DB4RCN0012 412602 Y 7/87 . .. .. 10.353 (319)

LT263-72B 43.04* H2O UDL 123 NCH RDF=2.14 113.01 - LDL -2.95 INCH ATS012 Rx. Level 1153DB4RCN0012 412603 Y 7/87 10.353 (319)'

LT263-72C 42.95* H2O UDL123 NCH RDF=2.14

_. II

~ ~

-" THESE lMITS AFE BASEDON . Last updeh 5-31-90 ~ D OF G

- PERF TR

~

Potendel i LOWER &:

-pAny,21 -REASON UPPER INSTRUMENT DESCRfPTION Sortel no, Probleen Date in . PSI.MONTNS FOR- Calibretton ' DR1FT REFERENCE ce NUMBER Model No y/w service ..(operating deys) REPLCEMENT _ Range UNITS DOCUteEM TS Point Hunnber 1153DB4RCN0012, 412604 ' :, Y

~

LT263-72D Rx. Level - 7/8 7 .. . . .. . 10.353 (319) 113.09 - LDL -2.95 INCH ATS018 43.04* Hr0 UDL 123 NCH RDF-2.14 LT263-73A Rx. Level - 1153DB5RCN0012 412599 (1) ^Y- 6/87-3/90 9.312 (288) NDTRONG 348.28 *9.14* LDL-11.4 INCH MRe0-45-40 ATSC14 0500607 N 3/90 . . .. 10.353 (319) Hao UDL63 NCH RDF=2.6 LT263-73B Rx. Level 1153DB5RCN0012 412600 (1) Y 6/87-3/90 9312 (288) NDTFEFONG 34727-59.12 LDL -11.dlNCH MR90-45-91 ATS020 412707 N 3/90 . ..... 1.041 (31) '

  • H2O UDL 6.31NCH S/N 412707 (1)&(2) RDF=2.6 30WitTTER IS NDLONGERA PART 21.

LT5068 Torus Water - 1153DB4PG 415268 Y 9/87 . .. _. 10.353 t.:M - 51.5-83.5*H2O LDL .74 NCH <250 PSI Level UDL 225 NCH RDF-4.6875 PT 1001-69 Torus Bottom 1153GB6RCN0012 418150 Y - 5/89 .. .. 10.353 (319) 0-100 PSI LDL -2.8 PSI <250 PSI SCH044 Press. UDL 3.4 PSI RDF-1.0 PT1001-601 A Drywell 1152AP5E22T028 224025 Y 3/82-3/86 (1.490) PDC 8417 (-)5 -(+)5 LDL -216 PSI ' < 250 PSI DRYOS2 t l

Pressure 1153GB5RCN0012 413606 Y ' 3/86 . . .. (1.520) NCES UDL .392 PSI '

RDF 2.7 I

PT1001 6018 Drywell 1152AP5E22T028 ~ 224026 Y 2/82-3/86. (1.490 PDC 8417 (-) 5-(+)5 LDL-216 PSI MR84-45-6 DRYO54 Pressure 1153GB5RCN0012 413605 Y 3/86 .. (1.520) NCES UDL .392 PSI -

RDF-2.7 PT1001-89A Drywell ' 1153GB4RCN0012 412764 Y - 5/87 ... .. (918) 0 - 5 PSIG LDL .0234 PSI <250 PSI ATS078 pressure UDL _0834 PSI RDF-1.079 PT1001-898 Drywell 1153GB4RCN0012 412765 Y 5/87 ... .. (918) 0 - 5 PSIG LDL.0234 PSI <250 PSI ATS082 pressure UDL .0834 PSI

~ RD.~=1.079 l

__ ; _ .. u ,. _ _ . .m . , . - -_ , _ _ - . -__ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.. g. .

Last tspdate 5-31-90 ^ O OF 0 -

IMITS* ARE BASED ON ' "

LO111PER &

' Potental REASON UPPER PART 21 ~.. PSt-WONTNS FOR- Chion patFT REFERENCE ey pelo in

-INSTRUMENT Serial no. p,,% Range ~ taggyg DocuerENTS Point Menneur DESCRIPTION Isostel No y/N service (operating days) REPLCEMENT NUMBER 0 - 5 PSG ' LDL.0234 PSI-- <250 PSI ATS000 PT1001-89C Drywell 1153GB4RCN0012. 412766 Y- 5/87 . . .. -(918)

UDL .0834 PSI pressure RDF-1.079 Y 5/87 .. .... 0 - 5 PSG LDL' .0234 PSI <250 PSI ATS084 PT1001-89D Drywell ' 1153GB4RCN0012 412787 (918)

UDL.0834 PSI pressure RDF-1.079 Y 10,308 (319) 0-1200 PSIG LDL -3.525 PSI MR90-45-37 ATS108 PT261-30A Main Steam 1153GB9RCN0012 412859 4/87 .- . .

Une Pressure RDF=2.5 Y. 4/87-9/89 10.308 (183) NPURITIES 0-1200 PSG LDL -3.525 PSI FAM89-26$ ATS110 PT261-308 Main Steam 1153GB9RCN0012 412860 Line Pressure 422273 Y 9/89 . . ..

RDF-2.5 Y ' 2/8 7 .... .. 10.308 (319) 0-1200 PSIG LDL -3.525 PSI MR90-45-38 ATS108 PT261-30C Main Stea:n 1153GB9RCN0012 412889 Line Pressure RDF=2.5 Y 2/87 .. 10,308 (319) 0-1200 PSIG LDL -3.525 PSI MR90-45-39 ATS112 PT261-30D Main Steam 1153GB9RCN0012 412590 Une Pressure RDF=2.5 10,308 (319) 13 - 1513 PSG LDL 4.48 PSI ATSO94 Rx. Pressure 1153GB9RCN0012 412891 Y- 7/87 ... .

PT263-49A RDF=2.0 13 - 1513 PSG LDL -3.48 PSI ATS100' PT263-49B Rx. Pressure 1153GB9RCN0012 412892 Y 7/87 .... .. 10.308 (319)

RDF=2.0 ATSO98

~

-Y - 5/87 ... . . 10.308 (319). 13 - 1213 PSG LDL -3.48 PSI PT263-50A Rx. Pressure ' 1153GB9RCP4012 412893 RDF=2.5

- - - - . - . - - ~

e P OSE MA Last update 5-31-90 70F0-

-. umTs ARE BASED ON i .

g pennes . tower a REASON UPPER

- ' INSTRUSIENT Does in PSI-MONTNS FOR Catitwation DRIFT M m RENCEi Cemeputer M 'no. p, .

NUMBER DESCRI N N ' posseg geo . y/st service - (operating days) REPLCEIBENT Range ~ LausTS GMUMEstig Point peunete PT263-508 - Rx. Pressure - 1153GB9RCN0012 412894 Y 5/8 7 . .. . 19.353 (319) 13 - 1213 PSG LDL ' -3.46 PSI ATS102 RDF=2.5 PT263-51 A Rx. Pressure 1153GB9RCN0012 412895- Y- 8/87-3/90 9312 (288) 13 - 1213 PSG LDL -3.46 PSI MR90-45-33 ATS006 0500471 N 3/90-i '1,041 (31)

RDF.2.5 PT263-51B Rx. Pressure 1153GB9RCN0012 412943 Y 5/87-2/90- 9312 (288) 13 - 1213 PSG LDL -3.46 PSI M R 90-45-34 ATS090 0500482 .N 3/90 . .. 1.041(31)

RDF=2.5 PT263-51 C Rx. Pressure 1153GB9RCN0012 412944 Y 0/87-3/90 9312 (288) . 13 - 1213 PSG LDL -3.46 PSI MR90-45-35 ATS088 0500656 N 3/90 ... 1.041 (31) i RDF=2.5 PT263-51 D Rx. Pressure 1153GB9RCN0012 413331 Y 6/87-3/90 9312 (288) 13 - 1213 PSG LDL -3.46 PSI MR90-45-36 ATS092 0500655 N 3/90 . . . 1.041 (31)

RDF=2.5 PT263-52A Rx. Pressure 1153GB9ACN0012 412946 Y 2/87 . .. 10.353(319) 13 - 1213 PSG LDL -3.46 PSI ATSO96 RDF 2.5 PT263-528 Rx. Pressure - 1153GB9RCN0012 412947 Y 2/87 ... 10.353 (319) 13 - 1213 PSG LDL -3.46 PSI ATS104 RDF=2.5 PT503A Main Cond 1153DB5RCN0012 412595 Y 8/86 _.. . 4.700 (319) 30" HG VAC - 0 LDL -2 <250 PSI ATS054 (1) PSIG UDL 1.08 RDF-1.837 peCES HGVAC PT503B Main Cond 1153DB5RCN0012 412596 Y- 8/86 ... .. '4.700 (319). 30* HG VAC - 0 LDL' .38 <250 PSI ATS058 (1) PSIG UDL 1.08 RDF-1.837 plCES HGVAC i

l v_ _ ._ _ _

. -- . ~ _ _ ~ - _ _ _ . .

. . . . _ m._.

..f:

a

- THESE LMtTS AFIE BASED ON ' ,, Last updele 5-31-90 ^ 0 OF D 2EFO SHIFTONLY

  • Potential ' LOWER & ~

PART 21 AEASON . UPPER ~

. INSTRUSSENT Does in PSI-WOttTHS FOR Wetton OfteFT REFERENCE Competer butt 9ER DESCRIPTMN . -Igodel No SerW no. Problem Y/N servece - (opere6ng days) REPLCEaBENT Renge . " LasstTS DOCUesEstTS Point Itoseber PT5MC Main Cond ' 1153DB5RCN0012 - 412597 'Y . 8/88-1187 E . 0 (0) THREAD DAM. 30- HG VAC - 0 LDL -2 FSM68-103 ATS056 412707.(1). Y 1/87-8/88 0 (0) RAPURITIES PSG UDL 1.08 i 412597 Y 8/88- 4,700 (319) RDF-1.837 NCES HGVAC i

i

[

! PT503D Main Cond 1153DB5RCN0012 412598 Y 8/86 .. . 4.700 (319) 30" HG VAC - 0 LDL .38 <250 PSI ATS060 I (1) PSG UDL 1.08 RDF-1.837 - NCESHGVAC PT504A Turb 1st Stage 1153GB9RCN0012 ' 412768 'Y 2/87 . 5 250 (319) 0 - 1200 PSG LDL -3.75 PSI ATS062 Pressure RDF=2.5 PT504B Turb 1st Stage 1153G89RCN0012 412856 Y 2/87 . .. 5250 (319) 0 - 1200 PSG . LDL -3.75 PSI ATS066 Pressure RDF-2.5 PT504C Turb 1st Stage 1153G89RCN0012 412857 Y 2/87 .. 5 2 50 (319) 0 - 1200 PSIG LDL -3.75 PSI ATS064 Pressure-RDF=2.5 PT504D Turb 1st Stage 1153GB9RCN0012 412858 Y 2/8 7 .... . 5253 (319) 0 - 1200 PSG LDL-3.75 PSI ATS068 Pressure RDF=2.5 P T512A Drywell ' 1153GB4RCN0012 412760 Y 5/87 . .... (918) 0 - 5 .D m 74 PSI < 250 PSI ATS070 pressure UDL .0834 PS RDF-1.07 PTS 12B Drywell 1153GB4RCN0012 412761 Y 5/87 .. ... (918) 0 - 5 PSIG LDL .0234 ' PSI < 250 PSI ATS074 pressure UDL 0834 PSI RDF-1.07 PT512C Drywell 1153GB4RCN0012 412762 .Y 5/876 . . (918) 0 - 5 PSG LDL .0234 PSI < 250 PSI ATS072 pressure _ UDL .0834 PSI RDF-1.07. ~

., - - , , ,- - ~ 4l l . ., ,. , . , , _. . . _ . _ _ , - _ _ . . ..

c- - -

. .c . .

~'..

, L ..c I

ROSEN . MANSWITTER f'.

1 .-

TFJSEUMTS" ARE BASED ON PERFORMA00CE MACKING Last nW M1-90.. O OF 0 - -

! 2ERO SHFTONLY

  • l . Potences LOWER &. ^

l pg g . . REASON- UPPER INSTRUMENT - PS8-MONTHS _ FOR Non . REFERENCE Consputer DESCRIPMN . g,gg g gg, . m m, nm Does In Mange DRerT MUW9ER- yjg ,,,,ge, . (opereeing elsys) REPLCEMENT LIMITS' DOCUMENTS P88Rt NWImber PT512D Drywes 1153G84RCN0012 412763 Y'- 5/87 . .. - (918) 0 - 5 PSIG LDL .0234 PSI - < 250 PSI : ATS076.

pressure UDL .0834 PSI -

RDF-1.07 ,

x d

b t

t

. b. , -- . . _ , . [_ , .e. . . - 4 ,, , . - _ . . . ,m , .~ ,- ., . . s. w 6..r,. _ w -