|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARSVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 9906301999-10-20020 October 1999 Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217H6341999-10-15015 October 1999 Requests Renewal of Operator Licenses for Listed Personnel. Current Licenses for Kh Curran,Lm Gerlach,Rc Weber & Bt Rhodes Will Expire in Nov 1999.Proprietary NRC Form 398 & NRC Form 396 Encl.Proprietary Info Withheld ML20217H6251999-10-15015 October 1999 Requests Renewal of Operator Licenses for Listed Personnel. Current Licenses for MR Kahn,Aj Mclaughlin,De Montgomery & Kr Murphy Will Expire in Nov 1999.Proprietary NRC Form 398 & NRC from 396 Encl.Proprietary Info Withheld ML20217F4301999-10-14014 October 1999 Responds to 991012 Rai,Based on 991001 Telcon Re Suppl to Request for TS Change to Revise MCPR Safety Limit & Add Approved Siemens Topical Rept for LaSalle County Station, Unit 1 ML20217K7011999-10-13013 October 1999 Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action1999-10-12012 October 1999 Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action ML20217D3191999-10-12012 October 1999 Submits Request for Addl Info Re Licensee 990707 Proposed License Amend to Revise Min Critical Power Ratio.Listed Questions Were Discussed with Util in 991001 Telcon ML20217C1671999-10-0808 October 1999 Provides Suppl to RAI for Approval of Unreviewed Safety Question Re Assessment of Certain safety-related Concrete Block Walls at LaSalle County Station,Units 1 & 2 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee1999-10-0707 October 1999 Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee ML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations ML20217A7601999-10-0606 October 1999 Forwards Insp Repts 50-373/99-15 & 50-374/99-15 on 990729-0916.One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20212M0931999-10-0404 October 1999 Refers to 990922-23 Meeting Conducted by Region II at LaSalle Nuclear Power Station.Purpose of Visit,To Meet with Licensee Risk Mgt Staff to Discuss Util Initiatives in Risk Area & to Establish Dialog Between SRAs & Risk Mgt Staff 05000373/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR50.73(a)(2)(iv).Commitments for Submittal Also Encl1999-10-0404 October 1999 Forwards LER 99-003-00 IAW 10CFR50.73(a)(2)(iv).Commitments for Submittal Also Encl ML20217A6201999-09-30030 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issue Matrix & Insp Plan Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr SVP-99-189, Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage1999-09-22022 September 1999 Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage ML20212E7171999-09-22022 September 1999 Forwards RAI Re Requesting Approval of License Amend to Use Different Methodology & Acceptance Criteria for Reassessment of Certain Masonry Walls Subjected to Transient HELB Pressurization Loads ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 05000374/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Encl1999-09-20020 September 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Encl ML20212C0591999-09-17017 September 1999 Informs That NRC Reviewed Licensee Justifications for Deviations from NEDO-31558 & Determined That Justifications acceptable.Post-accident Neutron Flux Monitoring Instrumentation Acceptable Alternative to Reg Guide 1.97 ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted ML20212A3581999-09-13013 September 1999 Confirms That Fuel MCPR Data for LaSalle County Station,Unit 1,Cyle 9,sent by Ltr Meets Condition 2,as Stated in 970509 NRC Ltr SVP-99-190, Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys1999-09-13013 September 1999 Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys ML20212A1141999-09-10010 September 1999 Forwards RAI Re Licensee 990519 Amend Request,Which Proposed to Relocate Chemistry TSs from TS to licensee-controlled Documents.Response Requested by 990930,so That Amend May Be Issued to Support Upcoming Unit 1 Refueling Outage ML20211Q9911999-09-10010 September 1999 Informs That License SOP-4048-4,for Wp Sly May Be Terminated Due to Individual Retiring ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211Q7961999-09-0909 September 1999 Forwards Correction to Administrative Error on Page 8 of NRC Insp Repts 50-254/99-16 & 50-265/99-16,transmitted by Ltr, ML20211Q6511999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Quad Cities Operator License Applicants During Wk of 000327.Validation of Exam Will Occur at Station During Wk of 000306 ML20211P2211999-09-0808 September 1999 Forwards Insp Repts 50-373/99-14 & 50-374/99-14 on 990809- 13.No Violations Noted.Insp Concluded That Emergency Preparedness Program Maintained in Good State of Operational Readiness ML20212A8571999-09-0707 September 1999 Informs That Proprietary Document, Power Uprate SAR for LaSalle County Station,Units 1 & 2, Rev 2,Class III, NEDC-32701P,submitted in ,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20211Q6861999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant License Applicants During Wks of 001113 & 20. Validation of Exam Will Occur at Station During Wk of 001023 05000374/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Encl1999-09-0303 September 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Encl ML20211M1151999-08-31031 August 1999 Requests That Following Eleven Individuals Take BWR Gfes of Written Operator Licensing Exam to Be Administered on 991006 ML20211G1831999-08-27027 August 1999 Provides Addl Clarification of Proposed Refueling Practices Under Proposed Core Alterations Definition Re 990813 Application for Amend to TS ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211F8731999-08-25025 August 1999 Forwards Insp Repts 50-373/99-13 & 50-374/99-13 on 990804-06 & 09-11.No Violations Noted.Fire Protection Program Strengths Includes Low Number of Fire Protection Impairments & Excellent Control of Transient Combustibles ML20211F8251999-08-25025 August 1999 Forwards Insp Repts 50-254/99-15 & 50-265/99-15 on 990816-20.No Violations Noted.Insp Evaluated Effectiveness of Maint Rule Program & Review Periodic Evaluation Specifically Required for 10CFR50.65 ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211D1491999-08-19019 August 1999 Forwards Insp Repts 50-254/99-16 & 50-265/99-16 on 990719-22.Staff Identified Major Discrepancy Re Accuracy of Data Submitted to NRC for Protected Area Security Equipment Performance ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20210U3201999-08-17017 August 1999 Forwards Insp Repts 50-373/99-12 & 50-374/99-12 on 990623-0728.No Violations Noted ML20210T9941999-08-13013 August 1999 Forwards Insp Repts 50-254/99-12 & 50-265/99-12 on 990628-0716.Violations Noted SVP-99-154, Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated1999-08-13013 August 1999 Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated SVP-99-147, Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl1999-08-13013 August 1999 Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl ML20210R7451999-08-13013 August 1999 Forwards Insp Repts 50-254/99-11 & 50-265/99-11 on 990601-0720.NRC Identified Several Issues Which Were Categorized as Being of Low Risk Significance.Two Issues Involved NCVs of Regulatory Requirements SVP-99-170, Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety1999-08-13013 August 1999 Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML20210R9541999-08-10010 August 1999 Informs That During 990804 Telcon Between J Bartlet & M Bielby,Arrangements Were Made for NRC to Insp License Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 1999-09-09
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062G0401990-11-21021 November 1990 Advises That fitness-for-duty Insp Scheduled for Wk of 910122-25.Written Policies/Procedures Will Be Reviewed ML20062G6911990-11-19019 November 1990 Advises That Schedule to Conduct Type a Containment Integrated Leak Rate Test for Fall 1990 Complies W/ Requirements of App J,Section III.A.6 & Applicable Tech Specs,Per Util ML20062E0201990-11-0909 November 1990 Forwards Safety Insp Repts 50-373/90-21 & 50-374/90-22 on 900902-1020 & Notice of Violation ML20058G2941990-11-0505 November 1990 Advises That Written & Operating Operator & Senior Operator Licensing Exams Scheduled for Wk of 910204 & Requests Listed Ref Matls 60 Days Prior to Exam Date ML20058E8171990-10-31031 October 1990 Requests Submittal of Review Re Adequacy of Initial Investigation of Allegation RIII-90-A-0002 within 30 Days ML20058E7141990-10-30030 October 1990 Forwards Exam Forms & Answer Keys,Grading Results & Individual Answer Sheets for Each Applicant ML20058E6891990-10-26026 October 1990 Forwards Mgt Meeting Repts 50-254/90-19 & 50-265/90-19 on 900925.Meeting to Discuss NRC Concerns Re Containment Performance Testing at Plant ML20059N6801990-10-0505 October 1990 Forwards Insp Repts 50-254/90-14 & 50-265/90-14 on 900805- 0915 & Notice of Violation ML20059N7431990-10-0404 October 1990 Confirms 901012 Mgt Meeting at Region III Ofc to Discuss Util Corporate & Site Engineering Organizations ML20059M2101990-09-25025 September 1990 Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exams to Be Administered on 901010,including Map of Area Where Exams Will Be Taken, Preliminary Instructions for Exam & Equation Sheet ML20059J6371990-09-13013 September 1990 Forwards Enforcement Conference Repts 50-254/90-16 & 50-265/90-16 on 900905 & Notice of Violation.Technical Oversight in Case Indicates Need for Greater Care & Attention to Detail by Personnel ML20059E8091990-08-31031 August 1990 Forwards Safety Insp Repts 50-373/90-20 & 50-374/90-21 on 900820 & 22-24.Violation Noted But Not Cited ML20059E6391990-08-30030 August 1990 Forwards Safeguards Insp Repts 50-373/90-18 & 50-374/90-19 on 900813-17.Violations Noted,But Not Cited ML20059B6351990-08-23023 August 1990 Confirms 900911 Meeting W/Util in Glen Ellyn,Il to Discuss Rebaseline Program for Facility Updated Fsar.Discussion Should Include Progress & Overall Elements of Program ML20059N0291990-08-22022 August 1990 Forwards Safety Evaluation Accepting Util Responses to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austentic Stainless Steel Piping IR 05000373/19900081990-08-16016 August 1990 Confirms 900821 Meeting in Glen Ellyn,Il to Discuss Findings in Insp Repts 50-373/90-08 & 50-374/90-09.Util Should Include Status of Radwaste Tank Room Repair & Cleaning Project Addressed in Insp Repts 50-373/90-13 & 50-374/90-14 ML20059A1771990-08-15015 August 1990 Forwards Safety Insp Repts 50-254/90-10 & 50-265/90-10 on 900605-0802.Violations Noted.Enforcement Conference Will Be Held in Region III Ofc W/Util ML20059A5921990-08-14014 August 1990 Advises That 900806 Rev 34 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20058M6141990-08-0707 August 1990 Forwards Sample Registration Ltr for 901010 Generic Fundamentals Section of Written Operator Licensing Exam. Registration Ltr Listing Names of Candidates Taking Exam Should Be Submitted to Region 30 Days Prior to Exam Date ML20056A4981990-08-0101 August 1990 Forwards Master Bwr/Pwr Generic Fundamentals Exam Section W/Answer Key.W/O Encls ML20056A8611990-07-31031 July 1990 Forwards Safety Insp Repts 50-373/90-14 & 50-374/90-15 on 900603-0717.No Violations Noted ML20055F9191990-07-17017 July 1990 Forwards SER Confirming Util Responses to NRC Bulletin 88-010 & Suppl Re molded-case Circuit Breakers.Util Use of Replacement Breakers Until Fully Qualified Breakers Can Be Installed Acceptable Based on 891120 & 29 Submittals ML20055G4581990-07-13013 July 1990 Forwards Safety Insp Repts 50-254/90-11 & 50-265/90-11 on 900611-14.No Violations Noted ML20055G2951990-07-13013 July 1990 Advises That SALP 9 Presentation Time Changed Due to Commissioner Carr Visit on 900723 ML20055D8061990-06-29029 June 1990 Forwards Safety Insp Repts 50-373/90-11 & 50-374/90-11 on 900514-0613.No Violations Noted ML20055D9721990-06-28028 June 1990 Forwards Mgt Meeting Repts 50-373/90-13 & 50-374/90-14 on 900530 & Notice of Violation.Meeting to Discuss Radiological Conditions Caused by Overflows in Radwaste Tank Rooms,Plans for Decontamination & Corrective Actions Taken ML20055E0701990-06-28028 June 1990 Forwards Safety Insp Repts 50-373/90-05 & 50-374/90-06 900605-08.No Violations Noted.One Exercise Weakness Identified ML20055D2401990-06-27027 June 1990 Forwards Safety Insp Repts 50-373/90-12 & 50-374/90-13 on 900611-13.No Violations Noted.Exemption Granted from Conducting Type a Test During Each Refueling Outage Until Two Consecutive Tests Satisfy App J Acceptance Criteria ML20059M8791990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C3821990-02-27027 February 1990 Requests Addl Info on Licensee Application for Amend Under Generic Ltr 87-09.Amend Based on Assumption That Remedial Measures Provide Sufficient Level of Protection to Permit Operational Mode Changes & Safe long-term Operation ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) ML20248J2381989-10-0303 October 1989 Forwards Safety Evaluation Accepting Util Insp,Repairs & Mitigation of Welds Susceptible to IGSCC Performed During Spring 1988 Refueling Outage for Unit 2 ML20248E1041989-09-28028 September 1989 Informs That Licensee Proposed Type a Test Schedule for Plant Complies W/Requirements of 10CFR50,App J,Section III.a/6 & Applicable Tech Spec & Acceptable ML20248G1701989-09-28028 September 1989 Forwards Insp Repts 50-254/89-19 & 50-265/89-19 on 890821-25.No Violations Noted ML20248A2191989-09-21021 September 1989 Forwards Safety Insp Repts 50-373/89-19 & 50-374/89-19 on 890725-0911 & Notice of Violation ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20247N8631989-09-19019 September 1989 Advises That Safeguards Regulatory Effectiveness Review Scheduled for Wk of 891113-17 at Plant Site.Internal & External Security Groups Will Require Escort from Security Dept ML20247K8861989-09-15015 September 1989 Forwards Safety Insp Repts 50-373/89-20 & 50-374/89-20 on 890808-31.No Violations Noted ML20247N1901989-09-15015 September 1989 Confirms 890914 Discussion Between W Morgan & DE Jones Re Meeting on 891006 in Glen Ellyn,Il to Discuss Util Analysis of 890826 Scram ML20247H6411989-09-12012 September 1989 Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1) ML20247K2231989-09-11011 September 1989 Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe IR 05000237/19890181989-09-0808 September 1989 Forwards Safety Insp Repts 50-237/89-18 & 50-249/89-17 on 890715-0828.No Violations Noted ML20247E3371989-09-0707 September 1989 Forwards Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Change Tech Spec Sections 6.10.2.m & 6.10.3 Re Records Retention for Radiological Effluent Monitoring & ODCM ML20246Q0401989-09-0101 September 1989 Forwards Complete Unannounced Drill Evaluation of Implementation of State & Local Radiological Emergency Response Plans, Conducted on 890510.Due to Document Reproduction Error,Only Portions Submitted w/890804 Ltr ML20246Q0121989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted ML20246K6861989-08-29029 August 1989 Advises That Util 890829 Emergency Tech Spec Change Request Re RHR Loop B HX to Be Fed from RHR C & D Svc Water Pumps Via Crosstie Line Until 891101 Acceptable ML20246H5721989-08-29029 August 1989 Confirms 890831 Meeting W/Util to Discuss Plant Performance Issues ML20246J3211989-08-28028 August 1989 Forwards SALP Repts 50-373/89-01 & 50-374/89-01 for Period 880316 - 890630 1990-09-25
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217D3191999-10-12012 October 1999 Submits Request for Addl Info Re Licensee 990707 Proposed License Amend to Revise Min Critical Power Ratio.Listed Questions Were Discussed with Util in 991001 Telcon ML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations ML20217A7601999-10-0606 October 1999 Forwards Insp Repts 50-373/99-15 & 50-374/99-15 on 990729-0916.One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20212M0931999-10-0404 October 1999 Refers to 990922-23 Meeting Conducted by Region II at LaSalle Nuclear Power Station.Purpose of Visit,To Meet with Licensee Risk Mgt Staff to Discuss Util Initiatives in Risk Area & to Establish Dialog Between SRAs & Risk Mgt Staff ML20217A6201999-09-30030 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issue Matrix & Insp Plan Encl ML20212E7171999-09-22022 September 1999 Forwards RAI Re Requesting Approval of License Amend to Use Different Methodology & Acceptance Criteria for Reassessment of Certain Masonry Walls Subjected to Transient HELB Pressurization Loads ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 ML20212C0591999-09-17017 September 1999 Informs That NRC Reviewed Licensee Justifications for Deviations from NEDO-31558 & Determined That Justifications acceptable.Post-accident Neutron Flux Monitoring Instrumentation Acceptable Alternative to Reg Guide 1.97 ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted ML20212A3581999-09-13013 September 1999 Confirms That Fuel MCPR Data for LaSalle County Station,Unit 1,Cyle 9,sent by Ltr Meets Condition 2,as Stated in 970509 NRC Ltr ML20212A1141999-09-10010 September 1999 Forwards RAI Re Licensee 990519 Amend Request,Which Proposed to Relocate Chemistry TSs from TS to licensee-controlled Documents.Response Requested by 990930,so That Amend May Be Issued to Support Upcoming Unit 1 Refueling Outage ML20211Q7961999-09-0909 September 1999 Forwards Correction to Administrative Error on Page 8 of NRC Insp Repts 50-254/99-16 & 50-265/99-16,transmitted by Ltr, ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211P2211999-09-0808 September 1999 Forwards Insp Repts 50-373/99-14 & 50-374/99-14 on 990809- 13.No Violations Noted.Insp Concluded That Emergency Preparedness Program Maintained in Good State of Operational Readiness ML20211Q6511999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Quad Cities Operator License Applicants During Wk of 000327.Validation of Exam Will Occur at Station During Wk of 000306 ML20212A8571999-09-0707 September 1999 Informs That Proprietary Document, Power Uprate SAR for LaSalle County Station,Units 1 & 2, Rev 2,Class III, NEDC-32701P,submitted in ,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20211Q6861999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant License Applicants During Wks of 001113 & 20. Validation of Exam Will Occur at Station During Wk of 001023 ML20211F8731999-08-25025 August 1999 Forwards Insp Repts 50-373/99-13 & 50-374/99-13 on 990804-06 & 09-11.No Violations Noted.Fire Protection Program Strengths Includes Low Number of Fire Protection Impairments & Excellent Control of Transient Combustibles ML20211F8251999-08-25025 August 1999 Forwards Insp Repts 50-254/99-15 & 50-265/99-15 on 990816-20.No Violations Noted.Insp Evaluated Effectiveness of Maint Rule Program & Review Periodic Evaluation Specifically Required for 10CFR50.65 ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211D1491999-08-19019 August 1999 Forwards Insp Repts 50-254/99-16 & 50-265/99-16 on 990719-22.Staff Identified Major Discrepancy Re Accuracy of Data Submitted to NRC for Protected Area Security Equipment Performance ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20210U3201999-08-17017 August 1999 Forwards Insp Repts 50-373/99-12 & 50-374/99-12 on 990623-0728.No Violations Noted ML20210T9941999-08-13013 August 1999 Forwards Insp Repts 50-254/99-12 & 50-265/99-12 on 990628-0716.Violations Noted ML20210R7451999-08-13013 August 1999 Forwards Insp Repts 50-254/99-11 & 50-265/99-11 on 990601-0720.NRC Identified Several Issues Which Were Categorized as Being of Low Risk Significance.Two Issues Involved NCVs of Regulatory Requirements ML20210R9541999-08-10010 August 1999 Informs That During 990804 Telcon Between J Bartlet & M Bielby,Arrangements Were Made for NRC to Insp License Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210M5461999-08-0606 August 1999 Discusses 990804 Telcon Between J Bartlet & M Bielby,Where Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210L1061999-08-0202 August 1999 Forwards Insp Rept 50-010/99-13 on 990702-27.No Violations Noted.Insp Examined Activities in Areas of Facility Management & Control & Radiological Safety ML20210L8371999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Motor-Operated Valves ML20210M4691999-07-30030 July 1999 Forwards Insp Repts 50-254/99-14 & 50-265/99-14 on 990713-15.One NCV Was Identified & Discussed in Encl Insp ML20210H4661999-07-29029 July 1999 Forwards Insp Repts 50-254/99-13 & 50-265/99-13 on 990628-0702.No Violations Noted.Insp Consisted of Selective Examination of Procedures & Representative Records, Observations of Activities & Interviews with Personnel ML20210E0501999-07-22022 July 1999 Submits Summary of 990630 Management Meeting Re Licensee Performance Activities Since Start Up of Unit 2.List of Attendees & Matl Used in Presentation Enclosed ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209H5171999-07-15015 July 1999 Discusses 990701 Telcon Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at LaSalle County Nuclear Generating Station for Weeks of 990913,1018 & 1129 ML20209G4031999-07-14014 July 1999 Forwards Insp Repts 50-373/99-11 & 50-374/99-11 on 990614-18.No Violations Noted ML20209F6931999-07-13013 July 1999 Forwards Insp Repts 50-373/99-04 & 50-374/99-04 on 990513-0622.No Violations Noted.Determined That Multiple Challenges to Main Control Room Operators Occurred During Insp Period Due to Human Performance Weaknesses ML20196K3231999-06-30030 June 1999 Informs That Effective 990703,NRC Project Management Responsibility for Dresden,Unit 1 Station Will Be Transferred to P Ray ML20196J4711999-06-30030 June 1999 Discusses Closure of GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Units 1 & 2 ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20196F7921999-06-24024 June 1999 Forwards Meeting Summary,Nrc Meeting Handout & Licensee Handout from 990608 Meeting ML20196E7131999-06-23023 June 1999 Forwards Insp Repts 50-254/99-09 & 50-265/99-09 on 990421-0531.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20196E4821999-06-21021 June 1999 Discusses 990617 Meeting by Region III Senior Reactor Analysts (SRA) in Cordova,Il to Meet with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff ML20196D3491999-06-18018 June 1999 Forwards Insp Repts 50-237/99-08 & 50-249/99-08 on 990408-0521.Four Non-Cited Violations Noted.Maint on safety- Related Emergency CR Not Performed Well.Low Impact Issues Re Communications Present in Operations,Maint & Security ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195K1411999-06-16016 June 1999 Forwards Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety ML20195J6401999-06-14014 June 1999 Discusses Licensee 990331 Remediation Plan for Welds Susceptible to Intergranular Stress Corrosion Cracking at Quad Cities Nuclear Power Station,Unit 1 & Requests Licensee Address Concerns Discussed & Propose Plan to Implement C/A ML20207H6171999-06-14014 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-254/99-01 & 50-265/99-01,per 990217 & 0401 Ltrs Which Transmitted NOV Associated with Insp Repts 50-254/98-23 & 50-265/98-23 ML20207G2571999-06-0303 June 1999 Informs That Effective 990328,NRC Ofc of NRR Underwent Reorganization.Within Framework of Reorganization,Division of Licensing Project Management Created 1999-09-09
[Table view] |
Text
_
bmB DEC 2 1985 Docket No. 50-10, 50-237, 50-249; 50-254, 50-265; 50-373, 50-374 Commonwealth Edison Cocpany ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
The NRC's Office for Analysis and Evaluation of Operational Data (AE00) has recently completed an assessment of 39 Dresden, 21 Quad Cities and 30 LaSalle Licensee Event Reports (LERs) as part of the NRC's Systematic Appraisal of i
Licensee Performance (SALP). The LERs were found to be of barely acceptable quality for Dresden, of acceptable quality for Quad Cities and of above average quality for LaSalle based on the requirements of 10 CFR 50.73 and when compared to other facilities that have been evaluated using the same methodology.
We are providing a copy of AE00's assessment before we issue the SALP 5 reports
! so that you might be aware of these diverse findings between sites and take action to improve the overall quality of future LERs.
We request that you provide Region III with the actions you intend to take to improve the overall quality of future LERs.
We appreciate your cooperation with us in this matter. If you have aty questions, please contact N. Chrissotimos (790-5716).
Sincerely,
Crigir:a1 Siped by E.G. Crcentarf Charles E. Norelius, Director Division of Reactor Projects
Enclosure:
AE0D Assessment cc w/ enclosure:
D. L. Farrar, Director of Nuclear Licensing 8512100252 851202 D. J. Scott, Plant Manager I'DR ADOCK 0500 0 N. Kalivianakis, Plant Manager l G. J. Diederich, Plant Manager DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Control Division RIIj ) RII h RI I RII '/
Lan Ma /cs Chr sotimos Noreliu .-
11/ 6/85 l "C l
DEc 2 1985 Docket No. 50-10, 50-237, 50-249; 50-254, 50-265; 50-373, 50-374 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
The NRC's Office for Analysis and Evaluation of Operational Data (AE0D) has recently completed an assessment of 39 Dresden, 21 Quad Cities and 30 LaSalle Licensee Event Reports (LERs) as part of the NRC's Systematic Appraisal of Licensee Performance (SALP). The LERs were found to be of barely acceptable quality for Dresden, of acceptable quality for Quad Cities and of above average quality for LaSalle based on the requirements of 10 CFR 50.73 and when compared to other facilities that have been evaluated using the same methodology.
We are providing a. copy of AE0D's assessment before we issue the SALP 5 reports so that you might be aware of these diverse findings between sites and take action to improve the overall quality of future LERs.
We request that you provide Region III with the actions you intend to take to improve the overall quality of future LERs.
We appreciate your cooperation with us in this matter. If you have any questions,pleasecontactN.Chrissotimos(790-5716).
Sincerely,
Crigit:a1 Si nsd I:y E.G. Creen r/
Charles E. Norelius, Director Division of Reactor Projects
Enclosure:
AE00 Assessment cc w/ enclosure:
D. L. Farrar, Director of Nuclear Licensing D. J. Scott, Plant Manager N. Kalivianakis, Plant Manager G. J. Diederich, Plant Manager DCS/RSB(RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Control Division RII RII h
) RI I RIIg/
Lan a /cs Chr sotimos Noreli 11/26/85
DEC 2 E85 Dockot No. 50-10, 50-237, 50-249; 50-254, 50-265; 50-373, 50-374 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
The NRC's Office for Analysis and Evaluation of Operational Data (AE00) has recently completed an assessment of 39 Dresden, 21 Quad Cities and 30 LaSalle Licensee Event Reports (LERs) as part of the NRC's Systematic Appraisal of Licensee Performance (SALP). The LERs were found to be of barely acceptable quality for Dresden, of acceptable quality for Quad Cities and of above average quality for LaSalle based on the requirements of 10 CFR 50.73 and when compared to other facilities that have been evaluated using the same methodology.
We are providing a. copy of AE0D's assessment before we issue the SALP 5 reports so that you might be aware of these diverse findings between sites and take action to improve the overall quality of future LERs.
We request that you provide Region III with the actions you intend to take to improve the overall quality of future LERs.
We appreciate your cooperation with us in this matter. If you have any questions, please contact N. Chrissotimos (790!.5716).
Sincerely, "Crigi.nl Si;nd Iy E.G. Green:rf Charles E. Norelius, Director Division of Reactor Projects
Enclosure:
AE0D Assessment cc w/ enclosure: '
D. L. Farrar, Director of Nuclear Licensing D. J. Scott, Plant Manager N. Kalivianakis, Plant Manager G. J. Diederich, Plant Manager DCS/RSB(RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Contro Division RII RIl h RI I RIIg/
La /cs Chrnsotimos Noreli 11/ 6/85
DEC 2 1985 Docket No. 50-10, 50-237, 50-249; 50-254, 50-265; 50-373, 50-374 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
The NRC's Office for Analysis and Evaluation of Operational Data (AE0D) has >
recently completed an assessment of 39 Dresden, 21 Quad Cities and 30 LaSalle Licensee EventsReports (LERs) as part of the NRC's Systematic Appraisal of Licergee Performance (SALP). The LERs were found to be of barely acceptable quality for Dresden, of acceptable quality for Quad Cities and of above average quality for LaSalle based on the requirements of 10 CFR 50.73 and when compared to other facilities that have been evaluated using the same methodology.
We are providing a. copy of AE0D's assessment before we issue the SALP 5 reports so that you might be aware of these diverse findings between sites and take action to improve the overall quality of future LERs.
We request that you provide Region III with the actions you intend to take to improve the overall quality of future LERs.
We appreciate your cooperation with us in this matter. If you have any questions, please contact N. Chrissotimos (790-5716).
Sincerely,
Cri;1:a1 Si;ntd I:y E.G. Green ar/
Charles E. Norelius, Director Division of Reactor Projects
Enclosure:
AE0D Assessmert .
cc w/ enclosure:
D. L. Farrar, Director of Nuclear Licensing D. J. Scott, Plant Manager N. Kalivianakis, Plant Manager -
G. J. Diederich, Plant Manager DCS/RSB(RIDS)
Licensing Fee Management Branch .
Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Contro Division RI RII RI
$ RIIg'l/p?
La da /cs t Chr sotimos Norelius 11/ 6/85 m
l i
DEC 2 1985 Docket No. 50-10, 50-237, 50-249; 50-254, 50-265; 50-373, 50-374 Comonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
The NRC's Office for Analysis and Evaluation of Operational Data (AE0D) has recently completed an assessment of 39 Dresden, 21 Quad Cities and 30 LaSalle Licensee Event Reports (LERs) as part of the NRC's Systematic Appraisal of Licensee Performance (SALP). The LERs were found to be of barely acceptable quality for Dresden, of acceptable quality for Quad Cities and of above average quality for LaSalle based on the requirements of 10 CFR 50.73 and when compared to other facilities that have been evaluated using the same methodology.
We are providing a. copy of AE00's assessment before we issue the SALP 5 reports so that you might be aware of these diverse findings between sites and take action to improve the overall quality of future LERs.
We request that you provide Region III with the actions you intend to take to improve the overall quality of future LERs.
We appreciate your cooperation with us in this matter. If you have any questions, please contact N. Chrissotimos (790-5716).
Sincerely,
Crigfr.a1 Si;ned by E.G. Creencar.'
Charles E. Norelius, Director Division of Reactor Projects
Enclosure:
AE0D Assessment ,
cc w/ enclosure:
D. L. Farrar, Director of Nuclear Licensing D. J. Scott, Plant Manager N. Kalivianakis, Plant Manager G. J. Diederich, Plant Manager DCS/RSB(RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental ControlDivision RII RII
) RI I RIIg/h La /cs t Chr sotimos Norelius 11/ 6/85