IR 05000302/1985026

From kanterella
Jump to navigation Jump to search
Ack Receipt of 860905 Revised Response Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-302/85-26
ML20214V027
Person / Time
Site: Crystal River Duke energy icon.png
Issue date: 09/19/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
References
NUDOCS 8610020094
Download: ML20214V027 (1)


Text

SEP 191986 Florida. Power Corporation VATTN: Mr. W. S. Wilgus Vice President Nuclear Operations P. O. Box 14042, M.A.C. C-2-M St. Petersburg, FL 33733 Gentlemen:

SUBJECT: REPORT N0. 50-302/85-26 Thank you for your revised response of September-5,1986, to our Notice of Violation issued on July 16, 1985, concerning activities conducted at your

. Crystal River facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, Original Signed by Luis A. Reyes /for Roger D. Walker, Director Division of Reactor Projects cc: kP. F. McKee, Director, Nuclear Plant Operations f.C.Widell, Manager, Nuclear Operations Licensing and Fuel Management '

bec:6f1RC Resident Inspector Document Control Desk State of Florida

moSB8M o

BtTua RI RII d 1 rod DVerrelli 9/g/86 9/4/86 IEOI