Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3
ML20210P074
Person / Time
Site: Crystal River Duke energy icon.png
Issue date: 08/05/1999
From: Peterson S
NRC (Affiliation Not Assigned)
To: Cowan J
FLORIDA POWER CORP.
Shared Package
ML20210P078 List:
References
TAFC-MA1642, NUDOCS 9908120065
Download: ML20210P074 (4)


Text

f0-302

, o o% 9 y k UNITED STATES g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30006 0001 l

\.....,

l August 5, 1999 Mr. John Paul Cowan )

Vice President, Nuclear Operations Florida Power Ccrporation ATTN: Manager, Nuclear Licensing (NA1B)

Crystal River Energy Complex 15760 W. Power Line Street '

Crystal River, Florida 34428-6708 -

SUBJECT:

EVALUATION OF THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM REQUESTS FOR RELIEF FOR CRYSTAL RIVER 3 (TAC NO. MA1642)

Dear Mr. Cowan:

The U.S. Nuclear Regulatory Commission (NRC) staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL) has reviewed and evaluated the information provided by Florida Power Corporation (FPC) in its letter dated April 18,1998, and revised November 30,1998, regarding its third 10-year interval inservice inspection program plan and associated requests for relief for Crystal River Unit 3. Additional information was provided in a letter dated May 12,1999.

In May 1999, the NRC approved for general use, by reference in Regulatory Guide (RG) 1.147, Revision 12, certain Code Cases approved by the American Society of Mechanical Engineers (ASME). Requests for Relief 98-005-il,98-001-PT,98-002-PT and 98-003-PT requested authonzstum for Code Cases covered by RG 1.147, Revision 12, and thus do not require further NRC authorization. FPC must follow the conditions, if any, specified in the RG for these Code Cases.

The staff has concluded that the proposed attematives contained in Requests for Relief 98-001-11, 98-004-II, 98-008-11, 98-009-11, 98-010-II, and 98-005-PT, provide an acceptable level of l quality and safety. Therefore, the proposed attematives contained in Requests for Relief 98-001-11,98-004-II,98-008-11,98-009-il,98-010-II, and 98-005-PT are authorized pursuant to

/

I 10 CFR 50.55a(s)(3)(i). 4g The staff has also concluded that certain Code requirements contained in Requests for Relief 98-002-II,98-003-11, and 98-001-SS would result in hardship without a compensating increase in the level of quality and safety. The alternatives contained in Requests for Relief 98-002-II, 98-003-11, and 98-001-SS are authorized pursuant to 10 CFR 50.55a(s)(3)(ii).

Request for Relief 98-007-ll was withdrawn by FPC letter dated May 12,1999. Requests for' Relief 98-006-1l and 98-004-PT are hereby denied by th, staff.

^

9908120065 990005 PDR ADOCK 05000302 O PDR

} 10 h/ { &h L _- _ _-


.--------------------q John P. Cowan The NRC staffs evaluation and conclusions are contained in Enclosure 1. The INEEL Technical Evaluation Report is the Attachment to the staffs evaluation.

Sincerely, Or.ipinal signed by H. Berkow for S.Peterson Shen R. Peterson, Chief, Section 2 l Project Directorate ll l Division Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-302

Enclosure:

Safety Evaluation cc w/ encl: See next page DISTRIBUTION:

Docket File -

PUBLIC Crystal R/F HBerkow SPeterson BClayton LWiens Elmbro WBateman RScholl(E-mail SE)

OGC ACRS MSatorius TMcLellan PPatnaik Aloe LWert, Ril DOCUMENT NAME: G:\PDil-2\ CRYSTAL \ RELA 1642.WPD

  • See previous concurrence To semelve a see r of this documes t, is deste in the bes: "C" - Cooy without rtechment/ enclosure "E* = Copy with attachment / enclosure *N* = No copy OFFICE PDll-2\PM E PDil-2\LA 6 EMEB* EMCB* OGC PC6>8C . PDMM NAME LWen d BClayton $/ Elmbro WBateman fjhtad SPe4fs'od HBerkhv DATE 074/9ff 07/^2 /79 07/15/79 07/16/99 07/24/99 07/5799 Of/ 999 OFFICIAL RECORD COPY
  1. A John P. Cowan The NRC staff's evaluation and conclusions are contained in Enclosure 1. The INEEL Technical Evaluation Report is the Attachment to the staff's evaluation.

Sincerely,

)

6heri R. Peterso , Chief, Section 2 Project Directorate 11 DMslon Licensing Project Management ,

Office of Nuclear Reactor Regulation -

Docket No. 50-302 j

Enclosure:

Safety Evaluation ]

ccw/ encl: See'next page i

l

Mr. John Paul Cowan CRYSTAL RIVER UNIT NO. 3 Florida Power Corporation cc:

Mr. R. Alexander Glenn Chairman Corporate Counsei(MAC-BT15A) Board of County Commissioners Florida PowerCorporation Citrus County P.O. Box 14042 110 Nor1h Apopka Avenue St. Petersburg, Florida 337334042 invemess, Florida 34450-4245 Mr. Charles G. Pardee, Director Ms. Sherry L Bemhoft, Director Nuclear Plant Operations (PA4A) Nuclear Regulatory Affairs (NA2H)

Florida Power Corporation Florida Power Corporation ,

Crystal River Energy Complex Crystal River Energy Complex 15760 W. Power Line Street 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Mr. Michael A. Schoppman Senior Residentinspector Framatome Technologies Inc. Crystal River Unit 3 1700 Rockville Pike, Suite 525 U.S. Nuclear Regulatory Commission Rockville, Maryland 20852 6745 N. Tallahassee Road Crystal River, Florida 34428 Mr. William A. Passetti, Chief Department of Health Mr. Gregory H. Halnon Bureau of Radiation Control Director, Quality Programs (SA2C) 2020 Capital Circle, SE, Bin #C21 Florida Power Corporation Tallahassee, Florida 32399-1741 Crystal River Energy Complex 15760 W. Power Line Street Attomey General Crystal River, Florida 344264708 Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100

'