Forwards Insp Rept 50-302/90-21 on 900602-0706.No Violations or Deviations Noted
ML20056A919
Person / Time
Site: Crystal River 
Issue date: 07/27/1990
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Beard P
FLORIDA POWER CORP.
Shared Package
ML20056A920 List:
References
NUDOCS 9008100105
Download: ML20056A919 (3)


See also: IR 05000302/1990021

Text

OFFICIAL COPY

]

. ,

+.

A

j

i

-

JUL 2 71990

)

'

1

Docket No. 50-302

'

License No. DPR-72

e

.

o

Florida Power Corporation

i

Mr. P. M. Beard Jr.

n

Senior Vice President, Nuclear

j

'

Operations

j

l.

ATTN: Manager, Nuclear Operations

~

Licensing

P. O. Box 219 - NA-21

Crystal River, FL 32926.

i

L

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-302/90-21

f

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

L'

P. Holmes-Ray on June 2 - July 6.1990.

The inspection included a review' of

,

activities authorized for your Crystal River facility.

At.the conclusion of

the inspection, the findings were discussed with those members of your staff

1

identified in the enclosed inspection report,

j

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection. consisted of selective examinations of procedures

i

and representative records, interviews with personnel, and- observation of

activities in progress.

(

Within the. scope of the inspection, violations or deviations were not

identified.

Inaccordancewith10CFR2.790(a.),acopyofthisletteranditsenclosure(s)

,

will be placed in the NRC Public Document Room.

!

Should you have any questions concerning this letter, please contact us.

!

'

--

Sincerely,

Original signed by )

R. V. Crienjak (for

..

g ei M M 302

!

Marvin V. Sinkule, Chief

PNV

Reactor Projects Branch 2

O

Division of Reactor Projects

'

Enclosure:

NRC Inspection Report

cc w/ enc 1:

(Seepage 2)

pl ljt

00023G

+

.

!

?*

'..

l

'

Florido Power Corporation

2

JUL 2 71993

cc w/ enc 1:

Gary L. Boldt

Vice President, Nuclear Production

Florida Power Corporation

j

P..O. Box 219-SA-2C

<

Crystal River, FL 32629

P. F. McKee, Director

Nuclear Plant Operations

Florida Power Corporation

i

P. O. Box 219-NA-2C

!

Crystal River, FL 32629

!

R. C. Widell, Director

Nuclear Operations Site Support

Florida Power Corporation

'

t

P. O. Box 219-NA-21

Crystal River, FL 32629

A. H. Stephens

j

General Counsel

Florida Power Corporation

YAC - ASD

P. O. Box 14042

St. Petersburg, FL 33733

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee, FL 32304

Jacob Daniel Nash

Office of-Radiation Control

i

Department of Health and

i

Rehabilitative Services

-,

1317 Winewood Boulevard

1

Tallahassee, FL 32399-0700

'

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

2600 Blair Stone Road

Tallahassee, FL 32301

(cc w/ encl cont'd - Seepage 3)

'*

.

.

p

I

Florid 6 Power Corporation-

3

JUL 2 71990

(cc w/enci cont'd)

State Planning and Development

Clearinghouse

Office of Planning and Budgeting

Executive Office of the Governor

The Capitol Building

Tallahassee, FL 32301

Chairman

Board of. County Commissioners

Citrus County

110 N. Apopka Avenue

Iverness, FL 36250

Robert B. Borsum

Babcock and Wilcox Company

Nuclear Power Generation Division

1700 Rockville Pike, Suite 525

Rockville, MD 20852-1631

State of Florida

bec w/ enc 1:

Document Control' Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

15760 W. Power Line Street

Crystal River, FL 32629

RII:DRP

-Rif:0P

Ril: P