Mr. John Paul Cowan 4
Vice President, Nuclear Operctions SePtaber 21, 1999 Florid 2 Power Corporation ATTN: Manager, Nuclear Licensing (NA1B)
Crystal River Energy Complex 15760 W. Power Une Street Crystal River, Florida 34428-6708
SUBJECT:
SAFETY EVALUATION OF FLORIDA POWER CORPORATION'S PROPOSED EMERGENCY ACTION LEVEL CHANGES FOR CRYSTAL RIVER UNIT 3 (TAC NO. MA3292)
Dear Mr. Cowan:
By letter dated July 29,1998, as supplemented November 20,1998, July 13,1999, and August 31,1999, Florida Power Corporation submitted proposed changes to the Crystal River Unit 3 emergency action levels (EALs). The proposed EALs incorporate the guidance in NUMARC/NESP-007, Revision 2," Methodology for Development of Emergency Action Levels." NUMARC/NESP-007 was endorsed by the staff in Regulatory Guide 1.101,
" Emergency Planning and Preparedness for Nuclear Power Reactors," as an acceptable method for meeting the requirements of Title 10, Code of Federal Reaulations (10 CFR)
Section 50.47(b)(4) and Appendix E to 10 CFR Part 50.
The U.S. Nuclear Regulatory Commission staff has completed its review of your proposed changes and the supporting documentation. As a result of that review, we conclude that the changes meet the requirements of 10 CFR 50.47(b)(4) and Appendix E to 10 CFR Part 50, and therefore are acceptable. Our conclusions are summarized in the enclosed Safety Evaluation.
If you have any questions regarding this matter, contact me at (301) 415-1495.
Sincerely, Original signed by:
L. Wiens, Senior Project Manager, Section :2 Project Directorate ll 9909270112 990921 Division of Licensing Project Management PDR ADOCK 05000302 Office of Nuclear Reactor Regulation P
PDR Docket No. 50-302
Enclosure:
Safety Evaluation hh h h cc w/ enclosure: See next page DISTRIBUTION:
t Docket File 4 HBerkow RScholl(e-mail SE) f PUBLIC ACRS
/k O
CR-3 Reading OGC p(\\
BClayton LWert Rll SPeterson JO'Brien LWens LCohen DOCUMENT NAME: G:\\PDil-2\\ Crystal \\EAl.A3292.wpd "
To recehfe e con 7 of this document, and este la t w bes:
"C" = Copy without attachment / enclosure
- E' = Copy w th attachment / enclosure "N" = No copy OFFICE PDil-2\\PM.
6, PDil-2\\l.A PDil-2\\SC m3 PCll\\D/.
NAME LWens.ArfM BClayton
.1)
SPetersonA 4 HBMow DATE 09BI/99 7 09/d/99 6V 090l/99 CW 199 09/ /99 FFICIAL RECORD COPY j
wy q,i 2 3
,u
p je u%
[
-t UNITED STATES s
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20655-0001
%,+l September 21, 1999 Mr. John Paul Cowa 1 Vice President, Nuclear Operations Florida Power Corporation i
ATTN: Manager, Nuclear Licensing (NA18)
Crystal River Energy Complex 15760 W. Power Line Street Crystal River, Florida 34428-6708
SUBJECT:
SAFETY EVALUATION OF FLORIDA POWER CORPORATION'S PROPOSED EMERGENCY ACTION LEVEL CHANGES FOR CRYSTAL RIVER UNIT 3 (TAC NO. MA3292)
Dear Mr. Cowan:
By letter dated July 29,1998, as supplemented November 20,1998, July 13,1999, and August 31,1999, Florida Power Corporation submitted proposed changes to the Crystal River Unit 3 emergency action levels (EALs). The proposed EALs incorporate the guidance in 1
NUMARC/NESP-007, Revision 2, " Methodology for Development of Emergency Action Levels." NUMARC/NESP-007 was endorsed by the staff in Regulatory Guide 1.101,
" Emergency Planning and Preparedness for Nuclear Power Reactors," as an acceptable method for meeting the requirements of Title 10, Code of Federal Reaulations (10 CFR)
Section 50.47(b)(4) and Appendix E to 10 CFR Part 50.
The U.S. Nuclear Regulatory Commission staff has completed its review of your proposed changes and the supporting documentation. As a result of that review, we conclude that the changes meet the requirements of 10 CFR 50.47(b)(4) and Appendix E to 10 CFR Part 50, and therefore are acceptable. Our conclusions are summanzed in the enclosed Safety Evaluation.
If you have any questionc regarding this matter, contact me at (301) 415-1495.
Sincerely,
[4 /
L. Wiens, Senior Project Manager, Section 2 Project Directorate 11 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-302 l
Enclosure:
Safety Evaluation cc w/ enclosure: See next page