ML20203A430
| ML20203A430 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/03/1999 |
| From: | Wiens L NRC (Affiliation Not Assigned) |
| To: | Cowan J FLORIDA POWER CORP. |
| Shared Package | |
| ML20203A435 | List: |
| References | |
| TAC-MA2231, NUDOCS 9902100002 | |
| Download: ML20203A430 (3) | |
Text
.-,,.-,,.x.
.=,
=.= ;
_ = = - : y - - - - -
- %q
$p-Op2 p
UNITED STATES s
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. ensas anni February 3 1
i 999 Mr. John Paul Cowan Vice President, Nuclear Operations -
Florida Power Corporation -
ATTN: Manager, Nuclear Licensing (SA2A)
Crystal River Energy Complex 15760 W. Power Line Street
. Crystal River, Flodda 34428-6708
SUBJECT:
SAFETY EVALUATION OF FLORIDA POWER CORPORATION'S (FPC)
~
PROPOSED EMERGENCY ACTION LEVEL CHANGES FOR CRYSTAL RIVER UNIT 3 (TAC NO. MA2231)
Dear Mr. Cowan:
By letter dated June 10,1998, Florida Power Corporation (FPC) submitted proposed changes to three emergency action levels (EALs) for the Crystal River Unit 3 plant. In this letter it was stated that the proposed changes were based upon an extensive review of the current EALs and NRC inspector comments contained in inspection Report 50302/97-17. It was further stated that the proposed EALs remain in accordance with guidance of NUREG-0654/ FEMA-REP-1 and were designed to improve consistency in the EAL scheme, decrease the possibility
- of misinterpretations, and reduce excessive conservatism. It was also stated that the changes do not decrease the effectiveness of the Radiological Emergency Response Plan per 10 CFR 50.54 (q).
in the transmittal FPC also indicated that the proposed changes were reviewed and received concurrence from representatives of the State of Florida Division of Emergency Management;
)
the State of Florida Department of Health, Bureau of Radiation Control; the Citrus County
.Shedffs Office, Division of Emergency Management; and the Levy County Department of
- Emergency Management in a meeting held on February 11,1998. NRC staff held a telephone conference with members of your staff on October 21,1998, to clarify certain issues concoming these proposed changes.
1
! The NRC staff has ccropleted its review of the proposed changes and the supporting documentation $ uiuding the required approvals of the State and local govemments. As a 1
s
~
H Sc, to\\
e130 T
9902100002 990203
.PDR-ADOCK'05000302 F
'g NRC HlECEHEB 8CPV
. -. ~
~.....,,.,.-7...
,.. ~..... -. ~..-. -.... _
l
't a:
i a
I Mr) John'Cowan - February 3, 1999-
/ result of that review, we conclude that the changes meet the requirements of 10 CFR
[
' 50.47(b)(4) and Appendix E to 10 CFR Part 50, and therefore are acceptable. Our
~
conclusions are summartzed in the enclosed Safety Evaluation.
L This completes our effort under TAC numbor MA2231.~ If you have any questions regarding this l.
matter, contact me at (301) 425-1495.
Sincerely, n
Original signed by:
Leonard A. Wiens, Senior Project Manager Project Directorate 11-3 Division of Reactor Projects-1/ll Office of Nuclear Reactor Regulation -
Docket No. 50-302
Enclosure:
Safety Evaluation ccw/ encl: See next page 1
s-F DISTRIBUTION
- Docket File 0 -
PUBLIC iystal r/f JZwolinski FHebdon LWiens
. BClayton ACRS:
7OGC
' LPlisco, Ril LCohen
~ SRoudeer
,- s..
- Tharris (e-mail SE, only)
DOCUMENT NAME: G$ CRYSTAL \\EALREV.WPD T4 recsive a copy of this drument, Indicate in the box:
"C" = Copy without attachment / enclosure "E" = copy with ettechnent/ enclosure
'"N" = No copy 0FFICE PDII 3/ Pet -
lC P0ll 3/LA 1 1
Pgl 3/y[
lt>
I
.m
_NAfE LWienstlec-fl/d -
EC(ayton - AAX/
4TW /
DATE 02/ P /99 02/ P /99 02 9 /99 s
OtFICIAL RECORD COP F -
C j
1 e
I,.
?h..-
g i
..I
,,5,
,,7
.. z.
Mr. John Cowan- - result of that review, we conclude that the changes meet the requirements of 10 CFR 50.47(b)(4) and Appendix E to 10 CFR Part 50, and therefore are acceptable. Our conclusions are summarized in the enclosed Safety Evaluation.
This completes our effort under TAC number MA2231. If you have any questions regarding
- this matter, contact me at (301) 425-1495.
Sincerely, M
. Leonard A. Wiens, Senior Project Manager Project Directorate 11-3 Division of Reactor Projects -l/Il Office of Nuclear Reactor Regulation Docke' t No. 50-302
Enclosure:
Safety Evaluation
- cc w/ encl: See next page -
i 6
.I I, '.
I d
9
?
(
5 i
..,