IR 05000302/2012001

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for Crystal River Nuclear Plant Unit 3 (IR 05000302-12-001)
ML13063A463
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/04/2013
From: Croteau R
Division Reactor Projects II
To: Franke J
Progress Energy Florida
References
IR-12-001
Download: ML13063A463 (6)


Text

March 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CRYSTAL RIVER NUCLEAR PLANT UNIT 3 (REPORT 05000302/2012001)

Dear Mr. Franke:

On February 13, 2013, the NRC completed its end-of-cycle performance review of Crystal River Nuclear Plant Unit 3. The NRC reviewed the most recent quarterly performance indicators (PIs)

in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Crystal River Unit 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Crystal River Unit 3 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The NRC determined the performance at Crystal River Unit 3 during the first two quarters of the assessment period was within the Regulatory Response Column of the NRCs ROP Action Matrix because of one White finding in the Emergency Preparedness cornerstone. This White finding was closed in Inspection Report 05000302/2012503 dated June 14, 2012 (ML12166A522). Crystal River Unit 3 transitioned back to the Licensee Response Column of the Action Matrix on July 1, 2012, as documented in Inspection Report and Assessment Follow-Up Letter 05000302/2012003 dated July 27, 2012 (ML12209A382). Crystal River Unit 3 remained in the Licensee Response Column for the rest of this inspection cycle.

On February 20, 2013, Florida Power Corporation certified to the NRC the permanent removal of fuel from the Crystal River Unit 3 reactor vessel. The NRC has been conducting baseline inspections in accordance with Inspection Manual Chapter (IMC) 0351, Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Other Than Significant Performance Problems. The NRC is currently developing an inspection plan for Crystal River Unit 3 consistent with IMC 2561, Decommissioning Power Reactor Inspection Program. While this inspection plan is being developed, the NRC intends to conduct inspections at your facility in accordance with the current IMC 0351 inspection plan (ML13016A115). However, the NRC will contact you as soon as possible regarding changes to the inspection plan that are commensurate with the implementation of your decommissioning schedule.

The enclosed inspection plan lists the inspections that are scheduled through June 30, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

As a result of your announcement to decommission Crystal River Unit 3, the inspections listed on the enclosed plan will be revised. The NRC provides inspection plans to allow for the resolution of any scheduling conflicts and personnel availability issues. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Shane Sandal at (404) 997-4513 with any questions you may have regarding this letter.

Sincerely,

/RA/

Richard P. Croteau, Director Division of Reactor Projects

Docket Nos.: 50-302 License Nos.: DPR-72

Enclosure: Crystal River Nuclear Plant Inspection/Activity Plan (03/01/2013 - 06/30/2014)

cc w/Encl: (See page 3)

_________________________

X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP

SIGNATURE MJR /RA/

SRS /RA/

RPC /RA/

NAME MRiches SSandal WJones RCroteau

DATE 02/22/2013 02/22/2013

02/27/2013

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:

Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution

M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution

Regis T. Repko Senior Vice President Duke Energy Corporation Electronic Mail Distribution

Richard A. Wiemann Superintendent, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution

Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution

Terry Hobbs Plant General Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Blair P. Wunderly Director - Engineering Nuclear Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

R. Alexander Glenn General Counsel Progress Energy Electronic Mail Distribution

Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)

Progress Energy Electronic Mail Distribution

Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution

Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B)

Electronic Mail Distribution

Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution

David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution

Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050

Bryan Koon Director Florida Division of Emergency Management Electronic Mail Distribution

Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Letter to Jon from Richard P. Croteau dated March 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CRYSTAL RIVER NUCLEAR PLANT UNIT 3 (REPORT 05000302/2012001)

Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource ROP Assessment Institute of Nuclear Power Operations (INPO)

Crystal River Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 1 03/04/2013 07:42:21 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title

OL RQ

- REQUAL INSPECTION

04/08/2013 04/12/2013 IP 7111111B Licensed Operator Requalification Program

RP

- RP OCCUPATIONAL BASELINE

10/07/2013 10/11/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

10/07/2013 10/11/2013 IP 71124.02 Occupational ALARA Planning and Controls

10/07/2013 10/11/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

10/07/2013 10/11/2013 IP 71124.04 Occupational Dose Assessment

10/07/2013 10/11/2013 IP 71124.05 Radiation Monitoring Instrumentation

10/07/2013 10/11/2013 IP 71151 Performance Indicator Verification

CDBI

- COMPONENT DESIGN BASES INSPECTION

10/07/2013 10/11/2013 IP 7111121 Component Design Bases Inspection

11/04/2013 11/08/2013 IP 7111121 Component Design Bases Inspection

11/18/2013 11/22/2013 IP 7111121 Component Design Bases Inspection

12/02/2013 12/06/2013 IP 7111121 Component Design Bases Inspection

EP

- EMERGENCY PREPAREDNESS INSPECTION

10/14/2013 10/18/2013 IP 7111402 Alert and Notification System Testing

10/14/2013 10/18/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

10/14/2013 10/18/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

10/14/2013 10/18/2013 IP 71151 Performance Indicator Verification

MODS

- PLANT MODIFICATIONS INSPECTION

11/04/2013 11/08/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

11/18/2013 11/22/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

RP

- RP OCCUPATIONAL BASELINE WEEK2

11/18/2013 11/22/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

11/18/2013 11/22/2013 IP 71124.02 Occupational ALARA Planning and Controls

11/18/2013 11/22/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

11/18/2013 11/22/2013 IP 71124.04 Occupational Dose Assessment

11/18/2013 11/22/2013 IP 71124.05 Radiation Monitoring Instrumentation

11/18/2013 11/22/2013 IP 71151 Performance Indicator Verification

HS

- TRIENNIAL HEAT SINK PERFORMANCE

06/09/2014 06/13/2014 IP 7111107T Heat Sink Performance Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure