ML20058N290
| ML20058N290 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/31/1990 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Beard P Florida Power Corp |
| References | |
| NUDOCS 9008140027 | |
| Download: ML20058N290 (3) | |
Text
!
i JUL 311990 Docket No. 50 302 License No. DPR-72 i
4 Florida Power Corport. tion Mr. Percy M. Beard, Jr.
Senior,Vice President, Nuclear Operations l
ATTN: Manager, Nuclear Operations Licensing P. O. Box 219-NA-21 Crystal River, FL 32629 4
Gentlemen:
SUBJECT:
DOCKET NO. 50-302 This acknowledges the rer-4 t of your letter of June 13, 1990, whic" 0
transmitted Revision 5 to t.'.< Crystal River Physical Security Plan.
I Our review of the changes has found most of them to be consistent with the provisions of 10 CFR 50.54(p).
A few of the changes require administrative clarification as delineated in the enclosure to this letter. Our comments were discussed on July 23, 1990, between Mr. G. Longhouser of your staff and Ms. C. Perny of this office.
The enclosure to your letter is being withheld from public disclosure because it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21.
Should you have any questions concerning this letter, we will be 9.d to 1
discuss them with you.
Sincerely, c neel Daip ucd 'S c,00'L by WLhd I L L
William E. Cline, Chief
% clear Materials Safety and Safeguards Branch sivision of Radiation Safety l
and Safeguards cc: Gary L. Boldt Vice President, Nuclear Production l
Florida Power Corporation P. O. Box 219-SA-2C Crystal River, FL 32629
(/
ca\\
3 0 0 0 0Gc.' cont'd - See oace 21
/\\
s
- .ocs t e.co;7 ;-00731,_.,
v. g em m.u: m.oopym p
u-D
Io 01 E Florid 6 Power Corporation 2
(cc cont'd)
P. F. McKee, Director Nuclear Plant Operations Florida Power Corporation P. O. Box 219-NA-20 Crystal River, FL 32629 R. C. Wide 11. Director Nuclear Operations Site Support Florida Power Corporation P. O. Box 219-NA-21 Crystal River, FL 32629 A. H. Stephens General Counsel Florida Power Corporation MAC - ASD P. O. Box 14042 St. Petersburg, FL 33733 Attorney General
-Department of Legal Affairs The Capitol Tallahassee, rl 32304 Jacob Dan bl Nash Office of Radiation Control Deparcment of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 State Planning and Development Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, FL 32301 (cc cont'd - See page 3)
J
1
.i 1
o Florida Power Corporation 3
JUL 31590 l
(cccont'd)
Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Iverness, FL 36250 Rgbert B. Borsum Babcock and Wilcox Company Nuclear Power Generation Division 1700 Rockville Pike, Suite 525 i
Rockville, MD 20852-1631 State of Florida bec: NRC Resident Inspector U.S. Nuclear Regulatory Commission 15760 W. Power Line Street Crystal River, FL 32629 Docunrit Control Desk (RG01), 42-P Chief, Safeguards Branch, NRR, 90-24 Regior, 11 Licensing File, (50-302)(39VA), TAB 2 D. Thompson I
Rll:DRSS 1:
SS Ril:DRSS RII:DRf
(
44/+
CPerhf cGuire WCline RCrienjak 07/3l/90 07/J)/90 07/ /90 07/jf/90