ML20199D607
| ML20199D607 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/04/1999 |
| From: | Wert L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Cowan J FLORIDA POWER CORP. |
| Shared Package | |
| ML20199D611 | List: |
| References | |
| 50-302-98-10, NUDOCS 9901200154 | |
| Download: ML20199D607 (4) | |
See also: IR 05000302/1998010
Text
-
y
-
.
f
January 4,1999
Mr. John P. Cowan, Vice President
Nuclear Operations
Florida Power Corporation
ATTN: Manager Nuclear Licensing (SA2A)
Crystal River Energy Complex
15760 West Power Line Street
Crystal River, FL 34428-6708
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NO. 50-302/98-10 AND
Dear Mr. Cowan:
This refers to the inspection conducted on October 25 through December 5,1998, at the
Crystal River facility. The enclosed report presents the results of this inspection.
During the inspection period, your conduct of activities at the Crystal River facility was generally
characterized by safety-conscious operations and initiation of thorough actions to address
previous clearance deficiencies.
Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice) and
the circumstances surrounding it are described in detail in the subject inspection report.
-
The NRC has concluded that information regarding the reason for the violation, the corrective
actions taken and planned to correct the violation and prevent recurrence is already adequately
addressed on the docket in Licensee Event Report 50-302/98-013-00 dated December 16,
1998. Therefore, you are not required to respond to this letter unless the description therein
does not accurately reflect your corrective actions or your position. In that case, or if you
choose to provide additional information, you should follow the instructions specified in the
enclosed Notice.
.
i
'
1
i
l
1
20004G
i
h12OO15499
{
ADOCK050ohk2
G
(
.
8 01 '
', 4
'
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room.
Sincerely,
( Original signed by L. Wert )
Leonard D. Wert, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Docket No. 50-302
License No. DPR-72
Enclosures: 1. Notice of Violation
2. Inspection Report No. 50-302/98-10
cc w/encis:
Attorney General
Charles G. Pardee, Director
Department of Legal Affairs
Nuclear Plant Operations (NA2C)
The Capitol
Florida Power Corporation
Tallahassee, FL 32304
Crystal River Energy Complex
i
15760 West Power Line Street
William A. Passetti
Crystal River, FL 34428-6708
Bureau of Radiation Control
Department of Health and
Sherry L. Bernhoft, Director
Rehabilitative Services
Nuclear Regulatory Affairs (NA2H)
2020 Capital Circle SE, Bin #C21
Florida Power Corporation
Tallahassee, FL 32399-1741
Crystal River Energy Complex
l
15760 West Power Line Street
Joe Myers, Director
Crystal River, FL 34428-6708
Division of Emergency Preparedness
Department of Community Affairs
Gregory H. Halnon, Director
2740 Centerview Drive
Quality Programs (SA2C)
Tallahassee, FL 32399-2100
Florida Power Corporation
Crystal River Energy Complex
Chairman
,
l
15760 West Power Line Street
Board of County Commissioners
Crystal River, FL 34428-6708
Citrus County
l
110 N. Apopka Avenue
l
R. Alexander Glenn
Inverness, FL 36250
Corporate Counsel
Florida Power Corporation
Michael A. Schoppman
MAC - ASA
Framatome Technologies
P. O. Box 14042
1700 Rockville Pike, Suite 525
St. Petersburg, FL 33733-4042
Rockville, MD 20852-1631
- _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - _ _
l
t
'
.
3
Distribution w/encis:
L. Plisco, Rll
L. Wert, Rll
S. Ninh, Ril
L. Wiens, NRR
P. Steiner, Rll
PUBLIC
NRC Resident inspector
U. S. Nuclear Regulatory Commission
6745 N. Tallahassee Road
Crystal River, FL 34428
,
OFFICE
Ril:DRP
Ril:DRP,,tr / f
Ril:DRs
$1:DRs
,
c _,
gus' , f
,
SIGNATURE /A
P Ydd [f
4 Myd j$ l- (dW
/ #
P/#
NAME
SNibh
pQqhill
RCrowley/j /J ( d.Aayes
JA%4dn,
~
'
DATE
12Df/ 198
f) 12/4 /94
-11" ^"6# 7 ,Q2/7;l /98
1df4 /98f,
12/ /98
12/ /98
COPY?
4YEt
NO )ffES i
3
NO
YES
NO /
YEi' ~ NO
YES
/kd/
YES
NO
YES
NO
OFMIAL RECORD CEPV
DOCUMENT NAME:
\\ REPORTS \\9810.WPD
- - . . -JAN-04-1999 15:12
CRYSTAL RIVER RI OFF1CE
352 795 7664
P.02
. . . . . - - - - . . .
. .
. . . - . -
- . - . -
. _ . - - . . ~ . - . . - - . . - - . - .
.
'
ut.
.
q
,
4
'
Distribubon w/encis
L. PhsCo, Ril
,
L. Wert, Ril
l,l
S. Ninh Ril
L Wiens, NRR
l
P. Steiner, Ril
l l'
PUBLIC
!
,
NRC Resident inspector
U. S. Nuclear Regulatory Commission
6745 N. Tallahassee Road
Crystal River, FL 34428
]
t
I
i
i
i
l
'
I
OFfM
RE:DRP
RE:DRP
M:N
Mi -
SIGNATURE
.Sj C_ _
f8
mee
sede
%
>
5. be t.ex
OATE
11 pse
ilogdge
1; les
if ;ge
if t/pgs
1; pas
il ice
l
udv'?
YER
10 0
YEB
M
YER
11 0
YM
blO
YES
tio
YF_S
MO
YP_R
10 0
OPPICIAL RECORD CoFY
DOCUMENT NAME: C:UtPTINPUTige10.WPD
.
l
i
!
!-
TOTAL P.02